• Prosecution Case
Slider

Prosecution Case

Company Date Category Court Case Fine
EMGLOBAL BUILDERS SDN. BHD. 2020-02-28 Construction Sessions Court One (1) Petaling Jaya Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM40,000
EVERGREEN RUBBERWOOD PRODUCT 2020-02-27 Manufacturing Magistrate Court Tanah Merah Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM5,000
PIZZA HUT RESTAURANT SDN BHD 2020-02-27 Restaurant Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM25,000
SYARIKAT CAHAYA MUDA PERAK (OIL MILL) SDN BHD 2020-02-27 Manufacturing Sessions Court Teluk Intan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM20,000
ANG CHENG HO QUARRY SDN. BHD. 2020-02-26 Quarrying Sessions Court Kajang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM40,000
HIBUMAS SDN. BHD. 2020-02-25 Agriculture Sessions Court Sandakan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM20,000
ULTIMATE MACHINING SOLUTIONS (M) SDN BHD 2020-02-24 Manufacturing Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM20,000
NEKAJATI SDN BHD 2020-02-24 Construction Magistrate Court Criminal 8 Reg. 14(a), OSH (SHO) Regulations, OSHA1994. Failure to notify in writing to the Director General within one month of any appointment of a safety and health officer. RM4,000
VIKNESH A/L RAMACHANDRAN 2020-02-20 Manufacturing Magistrate Court Ipoh Section 24(1) OSHA 1994. Worker failure to take reasonable care for the safety and health of himself and of other persons who may be affected by his acts or omissions at work. RM500
PENFABRIC 2020-02-20 Manufacturing Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing training to his worker. RM20,000
PENFABRIC 2020-02-20 Manufacturing Sessions Court Butterworth Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM1,500
GUPPY PLASTIC INDUSTRIES (PENANG) SDN BHD 2020-02-20 Manufacturing Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM20,000
ZYEDEWOOD REALTY SDN BHD 2020-02-20 Forestry Magistrate Court Sibu Reg. 5(1)(a)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify to the nearest DOSH office by the quickly means available. RM1,500
YUTA MAJU SDN BHD 2020-02-19 Construction Sessions Court Georgetown Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by ensure engineering calculation for temporary slopes that lead to landslides. RM35,000
LAI SIN KIAN 2020-02-19 Construction Sessions Court Georgetown Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by ensure engineering calculation for temporary slopes that lead to landslides. RM35,000
LEO VISTA SDN. BHD. 2020-02-18 Construction Sessions Court Three (3) Petaling Jaya Section 17(1) OSHA 1994. Failure to ensure, so far as is practicable, that he and other persons, not being his employees, who may be affected thereby are not thereby exposed to risks to their safety or health. RM45,000
BTY WORLDWIDE SDN. BHD. 2020-02-12 Manufacturing Sessions Court Three (3) Klang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work on supervison to his worker. RM35,000
KB AIS SDN. BHD. 2020-02-10 Manufacturing Magistrate Court Pasir Mas Reg. 3(1), OSH (NOISE EXPOSURE) Regulations 2019, OSHA 1994. Failure to identify whether his employee may be exposed to excessive noise in the place of work in the manner as deytermined by the Director General. RM3,500
SOOK OIL MILLS SDN BHD 2020-02-07 Manufacturing Sessions Court Keningau Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM48,000
HRA TEGUH SDN. BHD. 2020-02-05 Construction Magistrate Court Five (5), Petaling Jaya Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickly means available. RM5,000
HRA TEGUH SDN. BHD. 2020-02-05 Construction Magistrate Court Five (5) Petaling Jaya Reg. 9, OSH (NADOPOD) Regulations 2004, OSHA 1994. No interference at accident or dangerous occurrence scene. RM6,000
SUBANG JAYA HOTEL DEVELOPMENT SDN. BHD. 2020-02-05 Hotel Magistrate Court Five (5) Petaling Jaya Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM5,000
ANAS CONSTRUCTION SDN BHD 2020-02-04 Construction Magistrate Court Bukit Mertajam Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM3,500
JALING JAYA TIMBER INDUSTRIES SDN BHD 2020-02-04 Manufacturing Sessions Court Sibu Section 49(1), OSHA 1994. Failure to comply with improvement notice issued. RM15,000
PALMGROUP PALM OIL MILL SDN BHD 2020-02-04 Manufacturing Sessions Court Sibu Section. 17(1) OSHA 1994. Failure to ensure, so far as is practicable, that he and other persons, not being his employees, who may be affected thereby are not thereby exposed to risks to their safety or health. RM15,000
F.Y. FOOD PROCESSING SDN BHD 2020-01-29 Manufacturing Sesssions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM15,000
MCS SERVICES SDN BHD 2020-01-23 Business Services Sesssions Court Ipoh Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to a person which prevents the person from following his normal occupation for more than four (4) calendar days. RM2,800
PERMINTEX FURUKAWA AUTOPARTS MALAYSIA SDN. BHD. 2020-01-22 Manufacturing Magistrate Court Jitra Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM4,000
LAUBROS HOLDINGS (M) SDN BHD 2020-01-22 Construction Sesssions Court Ipoh Section 17(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM5,000
KIN HENG TIMBER INDUSTRIES SDN BERHAD 2020-01-22 Manufacturing Sesssions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM15,000
SYARIKAT NAM AH SDN BERHAD 2020-01-16 Manufacturing Sesssions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM40,000
TOBU ALUMINIUM & GLASS SDN BHD 2020-01-16 Manufacturing Sesssions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM40,000
DIAMOND DOOR SUPPLIER ENTERPRISE 2020-01-16 Manufacturing Sesssions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM15,000
P.C PILE SDN BHD 2020-01-15 Manufacturing Sesssions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM18,000
DATARAN LINAU SDN. BHD. 2020-01-09 Manufacturing Sesssions Court Bintulu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM18,000
SILITECH TECHNOLOGY CORPORATION SDN BHD 2020-01-08 Manufacturing Magistrate Court Jawi Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing suitable equipment for machinery maintenance work. RM7,000
SANMINA-SCI SYSTEMS (M) SDN. BHD. 2020-01-08 Manufacturing Magistrate Court Balik Pulau Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM3,000
YUTA MAJU SDN BHD 2020-01-08 Construction Sesssions Court Georgetown Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM20,000
YUTA MAJU SDN BHD 2020-01-08 Construction Sesssions Court Georgetown Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM2,000
KERJAYA PROSPEK (M) SDN BHD 2020-01-06 Construction Sesssions Court Georgetown Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing supervision at workplace. RM20,000
CHAKLI TRANSPORT SDN BHD 2020-01-06 Transportation Magistrate Court Labuan Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to a person which prevents the person from following his normal occupation for more than four (4) calendar days. RM1,000
KIA LIM KILANG BATU BATA 2019-12-24 Manufacturing Sesssions Court Batu Pahat Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by maintain and operate a safe plant. RM22,000
JI QI CONSTRUCTION SDN BHD 2019-12-22 Construction Sesssions Court Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM40,000
TEMAN JAYA SOLUTION 2019-12-22 Mining Magistrate Court Machang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM9,000
TCM STAMPING PRODUCT SDN BHD 2019-12-20 Manufacturing Magistrate Criminal Court 8 Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM2,500
XINYI ENERGY SMART (M) SDN BHD 2019-12-19 Manufacturing Sesssions Court (3) Ayer Keroh Section 19, FMA 1967. Failure to obtain certificate fitness before operate any machinery unless there is in force in relation to the operation of the machinery valid certificate of fitness issued under this Act. RM20,000
XINYI ENERGY SMART (M) SDN BHD 2019-12-19 Manufacturing Sesssions Court (3) Ayer Keroh Section 19, FMA 1967. Failure to obtain certificate fitness before operate any machinery unless there is in force in relation to the operation of the machinery valid certificate of fitness issued under this Act. RM20,000
XINYI ENERGY SMART (M) SDN BHD 2019-12-19 Manufacturing Sesssions Court (3) Ayer Keroh Reg. 5(7A), FM (Persons In Charge)(Amendment) Regulations 2014, FMA 1967. Failure to appoint a second grade engineer together with such sufficient number of first grade drivers for steam boiler with heating surface greater than five thousand square metres. RM6,000
SOUTHERN BUILDER (J) SDN BHD 2019-12-18 Construction Sesssions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM40,000
KONG LONG HUAT CHEMICALS SDN BHD 2019-12-18 Manufacturing Magistrate Court Jawi Reg. 27(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to carry out a health surveillance programme. RM5,000
T.H. HIN HOME TECH SDN BHD 2019-12-18 Manufacturing Magistrate Court Bukit Mertajam Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM3,000
SELENGARA MAJU TRADING 2019-12-15 Construction Magistrate Court Johor Bahru Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM2,000
INFINITI KIMIA SDN BHD 2019-12-15 Construction Magistrate Court Johor Bahru Reg. 9(1), OSH (CLASS) Regulations 2013, OSHA 1994.Gagal Failure to made a written assessment of the risks created by the chemical to the health of the employee. RM5,000
ROYAL SELANGOR INTERNATIONAL SDN BHD 2019-12-06 Manufacturing Sesssions Court 12 Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM10,000
ROYAL SELANGOR INTERNATIONAL SDN BHD 2019-12-06 Manufacturing Sesssions Court 12 Reg. 7(1), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify reporting of cases of occupational poisoning and occupational disease. RM3,000
SWEE JOO COASTAL SHIPPING SDN BHD 2019-12-02 Storage Sesssions Court Bintulu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM18,000
GRACE MILLION SDN. BHD. 2019-12-02 Manufacturing Sesssions Court Bintulu Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM2,500
GRACE MILLION SDN. BHD. 2019-12-02 Manufacturing Sesssions Court Bintulu Section 49, OSHA 1994. Failure to comply with improvement notice issued. RM12,500
PEKERJAAN PIASAU KONKERIT SDN BHD 2019-12-02 Construction Sesssions Court Bintulu Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM2,500
PEKERJAAN PIASAU KONKERIT SDN BHD 2019-12-02 Construction Sesssions Court Bintulu Section 49, OSHA 1994. Failure to comply with improvement notice issued. RM12,500
ASSOCIATED ADJUSTER SDN BHD 2019-12-02 Business Services Sesssions Court 12 Section 16, OSHA 1994. Failure to formulate safety and health policy. RM5,000
CLEAN LIVING CHEMICAL SDN BHD 2019-12-02 Manufacturing Magistrate Criminal Court 8 Reg. 4(2), OSH (CLASS) Regulations 2013, OSHA 1994. Failure to classify chemical as hazardous chemicalin accordance with the physical, health and environmental hazard of the chemical. RM4,500
CLEAN LIVING CHEMICAL SDN BHD 2019-12-02 Manufacturing Magistrate Criminal Court 9 Reg. 9(1), OSH (CLASS) Regulations 2013, OSHA 1994.Gagal Failure to made a written assessment of the risks created by the chemical to the health of the employee. RM4,500
RAINBOW PROPERTIES SDN. BHD. 2019-11-29 Real Estate Sesssions Court Kota Kinabalu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by ensuring every dangerous part of any machinery shall be securely fenced. RM6,000
LOYAL ENGINEERING SDN. BHD. 2019-11-28 Construction Sesssions Court Ipoh Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM10,000
LOYAL ENGINEERING SDN. BHD. 2019-11-28 Construction Sesssions Court Ipoh Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM10,000
RHONG KHEN TIMBERS SDN. BHD. 2019-11-28 Manufacturing Sesssions Court Kuala Berang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe work system. RM4,000
SAPOR SHIPBUILDING INDUSTRIES SDN. BHD. 2019-11-26 Manufacturing Sesssions Court Sibu Section 15(2)(a), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing the provision and maintenance of plant and systems of work that are related to the entry of workers into confined spaces. RM5,000
SAPOR SHIPBUILDING INDUSTRIES SDN. BHD. 2019-11-26 Manufacturing Sesssions Court Sibu Section 15(2)(b), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing the making of arrangements for ensuring, so far as is practicable, safety and absence of risks to health related to the entry of workers into confined spaces. RM5,000
SAPOR SHIPBUILDING INDUSTRIES SDN. BHD. 2019-11-26 Manufacturing Sesssions Court Sibu Section 15(2)(c), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing the provision of such information, instruction, training and supervision as is necessary to ensure, so far as is practicable, the safety and health related to the entry of workers into confined spaces. RM5,000
SAPOR SHIPBUILDING INDUSTRIES SDN. BHD. 2019-11-26 Manufacturing Sesssions Court Sibu Section 15(2)(a), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing the provision and maintenance of plant and systems of work. RM5,000
SAPOR SHIPBUILDING INDUSTRIES SDN. BHD. 2019-11-26 Manufacturing Sesssions Court Sibu Section 15(2)(b), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing the making of arrangements for ensuring, so far as is practicable, safety and absence of risks to health. RM5,000
SAPOR SHIPBUILDING INDUSTRIES SDN. BHD. 2019-11-26 Manufacturing Sesssions Court Sibu Section 19, FMA 1967. Failure to obtain certificate fitness before operate any machinery including crawler crane, unless there is in force in relation to the operation of the machinery valid certificate of fitness issued under this Act. RM10,000
GSB Summit CD (M) S/B. 2019-11-26 Manufacturing Magistrate Criminal Court 8 Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickly means available. RM6,000
SOONHUP LICHANG SDN. BHD. 2019-11-24 Manufacturing Magistrate Court Johor Bahru Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickly means available. RM3,000
AHMAD ZAKI SDN. BHD. 2019-11-22 Construction Sesssions Court 12 Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing pedestrian access to workers resulting in fatal accidents. RM15,000
AROMA DEVELOPMENT SDN. BHD. 2019-11-21 Construction Sesssions Court Kulim Reg. 25(1), FM (BOWEC) Regulations 1986, FMA 1967. Failure to appoint site safety supervisor who shall spend at least fifteen hours per week exclusively on safety supervision and on promoting the safe conduct of work generally within the site. RM1,500
AROMA DEVELOPMENT SDN. BHD. 2019-11-21 Construction Sesssions Court Kulim Reg. 73(1), FM (BOWEC) Regulations 1986, FMA 1967. No scaffold shall be erected or be substantially altered or be dismantled except under the direct supervision of a designated person. RM1,500
AROMA DEVELOPMENT SDN. BHD. 2019-11-21 Construction Sesssions Court Kulim Section 10(c), FMA 1967. Failure to ensure all working levels for working platform shall be of safe construction so as to prevent a risk of persons falling. RM6,000
MAGJAYARESOURCES (M) SDN. BHD. 2019-11-21 Construction Sesssions Court Kulim Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM3,000
NAGOYA PLASTIC INDUSTRY SDN. BHD. 2019-11-21 Manufacturing Sesssions Court Kulim Reg. 27(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to carry out a health surveillance programme. RM6,000
PAN ASEL CHEMICALS (M) SDN. BHD. 2019-11-21 Manufacturing Magistrate Criminal Court 8 Reg. 4(2), OSH (CLASS) Regulations 2013, OSHA 1994. Failure to classify chemical as hazardous chemicalin accordance with the physical, health and environmental hazard of the chemical. RM4,000
PAN ASEL CHEMICALS (M) SDN. BHD. 2019-11-21 Manufacturing Magistrate Criminal Court 9 Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM4,000
SOONHUP LICHANG SDN. BHD. 2019-11-20 Manufacturing Sesssions Court (2) Johor Bahru Sek. 17(1), AKKP 1994. Failure to ensure, so far as is practicable, that he and other persons, not being his employees, who may be affected thereby are not thereby exposed to risks to their safety or health. RM20,000
ML SEPAKAT SDN. BHD. 2019-11-20 Construction Magistrate Court One (1), Kajang Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickly means available. RM5,000
ML SEPAKAT SDN. BHD. 2019-11-20 Construction Magistrate Court One (1), Kajang Reg. 9, OSH (NADOPOD) Regulations 2004, OSHA 1994. Interference at accident scene that causes death of worker. RM5,000
CHEC CONSTRUCTION (M) SDN. BHD. 2019-11-20 Construction Magistrate Court One (1), Kajang Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickly means available. RM5,000
CHEC CONSTRUCTION (M) SDN. BHD. 2019-11-20 Construction Magistrate Court One (1), Kajang Reg. 9, OSH (NADOPOD) Regulations 2004, OSHA 1994. Interference at accident scene that causes death of worker. RM5,000
M.E POLYURETHONE INDUSTRY SDN. BHD. 2019-11-18 Manufacturing Sesssions Court Muar Sek. 17(1), AKKP 1994. Failure to ensure, so far as is practicable, that he and other persons, not being his employees, who may be affected thereby are not thereby exposed to risks to their safety or health. RM15,000
SP TUBE ICE MALAYSIA SDN. BHD. 2019-11-18 Manufacturing Sesssions Court Sungai Petani Section 49(1), OSHA 1994. Failure to comply with improvement notice issued. RM25,000
SP TUBE ICE MALAYSIA SDN. BHD. 2019-11-18 Manufacturing Sesssions Court Sungai Petani Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM25,000
SM MASMAJU RESOURCE 2019-11-18 Business Services Sesssions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating system causing a fatal accident. RM30,000
KERJAYA PROPSEK SDN. BHD. 2019-11-15 Construction Sesssions Court 12 Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating system causing a fatal accident. RM20,000
ATLAS EDIBLE ICE SDN. BHD. (CAWANGAN SENAWANG) 2019-11-14 Manufacturing Sesssions Court Seremban Reg. 26(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure that the exposure of employees to chemicals hazardous to health is monitored in accordance with an approved method of monitoring and analysis. RM3,000
ST PALM OIL MILL SDN. BHD. 2019-11-14 Manufacturing Sesssions Court Teluk Intan Sec. 15, FMA 1967. Failure to ensure every dangerous part of any machinery shall be securely fenced. RM40,000
PESONA METRO SDN. BHD. 2019-11-14 Construction Magistrate Court Three (3), Shah Alam Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickly means available. RM2,000
EKOVEST CONSTRUCTION SDN. BHD. 2019-11-11 Construction Sesssions Court 12 Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM13,000
CHINA STATE CONSTRUCTION ENGINEERING SDN. BHD. 2019-11-07 Construction Sesssions Court Kuantan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing barriers to prevent people from falling. RM25,000
CHINA STATE CONSTRUCTION ENGINEERING SDN. BHD. 2019-11-07 Construction Sesssions Court Kuantan Section 48(1), OSHA 1994. Failure to comply with improvement notice issued. RM15,000
ASTA CHEMICAL SDN. BHD. 2019-11-07 Manufacturing Sesssions Court Kuantan Reg. 14(1), OSH (CIMAH) Regulations 1996, OSHA 1994. Failure to sent a copy of the report on industrial activity to the Director General at least three months before commencing the activity. RM12,000
GEMENCHEH GRANITE SDN. BHD. 2019-11-06 Quarrying Sesssions Court Seremban Sec. 15, FMA 1967. Failure to ensure every dangerous part of any machinery shall be securely fenced. RM12,000
GO AUTOMOBILE MANUFACTURING SDN. BHD. 2019-11-05 Manufacturing Sesssions Court Sungai Petani Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM7,000
LITA FINEMESH INDUSTRIES SDN. BHD. 2019-11-05 Manufacturing Sesssions Court Sungai Petani Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM30,000
TIMOR ENTERPRISE SDN. BHD. 2019-11-04 Manufacturing Sesssions Court Bintulu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating system for safe driving a vehicle in an oil palm field. RM12,000
BUMI GT SDN. BHD. 2019-11-01 Manufacturing Sesssions Court Five (5), Klang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating system for working at height. RM30,000
LOW'S CAP SEAL SDN BHD 2019-10-30 Manufacturing Sesssions Court Three (3), Klang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP) for work on manual punching machine. RM15,000
LOW'S CAP SEAL SDN BHD 2019-10-30 Manufacturing Sesssions Court Three (3), Klang Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM5,000
AFTER IMAGE SDN BHD 2019-10-28 Construction Sessions Court Pasir Mas Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP) on working at height. RM10,000
RAKAN RANGKAIAN (PHG) SDN BHD 2019-10-23 Communication Sessions Court Raub Section 17(1), OSHA 1994. Failure to ensure, so far as is practicable, that he and other persons, not being his employees, who may be affected thereby are not thereby exposed to risks to their safety or health by following to safe operating procedures (SOP) working on the road for optical cable installation RM30,000
SAMLING PLYWOOD (BINTULU) SD. BHD. 2019-10-23 Manufacturing Sessions Court Bintulu Section 15(2)c, OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP) RM15,000
ZEDTEE PLYWOOD SDN. BHD. 2019-10-23 Manufacturing Sessions Court Bintulu Section 15(2)c, OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP) RM20,000
ZEDTEE PLYWOOD SDN. BHD. 2019-10-23 Manufacturing Sessions Court Bintulu Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM2,000
FAMILY PRODUCTS SDN BHD 2019-10-22 Manufacturing Magistrate Court Sg. Siput Reg. 17(1)(b), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure engineering control equipment be examined and tested for its effectiveness by a hygiene technician at appropriate intervals, each interval being no longer than twelve months. RM5,000
PERUSAHAAN MEKASSAR (M) SDN. BHD. 2019-10-21 Manufacturing Sessions Court Kuantan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP) on repair of cages off the runway. RM15,000
SAG MANUFACTURING SDN. BHD. 2019-10-21 Manufacturing Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by performing inspection on iron pallet. RM20,000
API (TERENGGANU) SDN BHD 2019-10-21 Manufacturing Magistrate Court Besut Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP) on installation of vibrator. RM8,000
ISHARP SDN BHD 2019-10-20 Fishing Magistrate Court Setiu Reg. 5(1)(b)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify to the nearest DOSH office by the quickly means available within 7 days about accident arising out of or in connection with work, send a report thereof in an approved form. RM5,500
ANOPOKKU NIAGA 2019-10-20 Manufacturing Magistrate Court Setiu Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM6,000
TAIKO ALUMINA SDN BHD 2019-10-17 Manufacturing Sessions Court Taiping Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP) on roofing replacement work activities. RM40,000
SAPURA FABRICATION SDN BHD 2019-10-17 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by performing inspection on webbing sling. RM30,000
WONG FORKLIFT HIRE & SERVICES SDN. BHD. 2019-10-17 Business Services Magistrate Court Five (5), Klang Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickly means available. RM2,000
BURNMARK INDUSTRIES SDN BHD (198480-A) 2019-10-17 Manufacturing Magistrate Court Two (2), Selayang Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM2,000
CHUAN UN CHYE (M) SDN. BHD. 2019-10-15 Construction Sessions Court Eight (8), Shah Alam Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP) for spun pile transfer work activities that lead to cause of death. RM50,000
SAMLING HOUSING PRODUCT SDN BHD 2019-10-14 Manufacturing Sessions Court Miri Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM7,000
NOBLE DISTINCTION (M) SDN BHD 2019-10-10 Quarrying Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP) for supervison work while on stone filling in the quarry. RM40,000
TELAGA SETIA SDN. BHD. 2019-10-10 Business Services Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP) for solar system installation work on the roof. RM40,000
SUNGEI BONGKOH ESTATE SDN. BHD. 2019-10-09 Agriculture Magistrate Court Gurun Reg. 11, OSH (SHC) Regulations 1996, OSHA 1994. Failure to perform functions of safety and health committee in place of work, RM2,500
SUNGEI BONGKOH ESTATE SDN. BHD. 2019-10-09 Agriculture Magistrate Court Gurun Reg. 21(1), OSH (SHC) Regulations 1996, OSHA 1994. Failure to perform by safety and health committee shall meet as often as may be necessary commensurate with the risks attendant on the nature of work at the place of work but shall not meet less than once in three months. RM2,500
KRISCON BUILDERS SDN BHD 2019-10-09 Business Services Sessions Court Seremban Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing any risk assesment for his works. RM13,000
SENTORIA RESORT SDN. BHD. 2019-10-07 Business Services Sessions Court Kuantan Section 48(1), OSHA 1994. Failure to take measures to remove the danger or rectify any defect within such period as he shall therein specify in an imporvement notice. RM8,000
SENTORIA RESORT SDN. BHD. 2019-10-07 Business Services Sessions Court Kuantan Section 48(1), OSHA 1994. Failure to take measures to remove the danger or rectify any defect within such period as he shall therein specify in an imporvement notice. RM8,000
E-CAST INDUSTRIES SDN. BHD. 2019-10-07 Manufacturing Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP) on handling of die casting machine control that lead to cause of death. RM20,000
GIFUTEC (M) SDN BHD 2019-10-03 Manufacturing Magistrate Court Ipoh Reg. 17(1)(b), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure engineering control equipment be examined and tested for its effectiveness by a hygiene technician at appropriate intervals, each interval being no longer than twelve months. RM3,500
SELAMAT JAYA ENTERPRISE 2019-10-03 Construction Criminal Magistrate Court (8) Section 17(1), OSHA 1994. Failure to ensure, so far as is practicable, that he and other persons, not being his employees, who may be affected thereby are not thereby exposed to risks to their safety or health that lead to death. RM10,000
E-CAST INDUSTRIES SDN. BHD 2019-10-02 Manufacturing Magistrate Court Jawi Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM1,000
E-CAST INDUSTRIES SDN. BHD 2019-10-02 Manufacturing Magistrate Court Jawi Reg. 10(3), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send to the Director General before 31 January of each year, such extracts from the registry for a period of 12 months ending on 31 December of each year. RM2,000
MA NAZIRUDEEN ENTERPRISE 2019-10-01 Business Services Magistrate Court Georgetown Reg. 5(1)(b)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify to the nearest DOSH office by the quickly means available within 7 days about accident arising out of or in connection with work, send a report thereof in an approved form. RM5,000
RAKYAT KETENGAH PERWIRA SDN BHD 2019-09-30 Manufacturing Magistrate Court Kemaman Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM5,000
LIEW BROTHERS CONSTRUCTION CO. 2019-09-26 Construction Sessions Court Kuching Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing supervision at workplace. RM40,000
LIEW BROTHERS CONSTRUCTION CO. 2019-09-26 Construction Sessions Court Kuching Section 10(e), FMA 1967. Failure to ensure all opening on working levels securely covered so as to prevent risk of persons falling. RM40,000
MIN FONG QUARRY SDN BHD 2019-09-25 Quarrying Sessions Court Batu Pahat Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing a safe work handling. RM15,000
LY FURNITURE SDN BHD 2019-09-25 Manufacturing Sessions Court Batu Pahat Section 10(c), FMA 1967. Failure to ensure all working levels shall be of safe construction so as to prevent a risk of persons falling. RM40,000
SYARIKAT SIN KWANG PLASTIC 2019-09-25 Manufacturing Sessions Court Batu Pahat Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM20,000
SYARIKAT SIN KWANG PLASTIC 2019-09-25 Manufacturing Sessions Court Batu Pahat Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM20,000
LADANG SERASA SDN BHD 2019-09-25 Agriculture Sessions Court Kota Bharu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing a safe work path. RM10,000
RD RESOURCES SDN BHD 2019-09-25 Construction Sessions Court Labuan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM10,000
TIANG GUAN RUBBER ESTATE 2019-09-24 Agriculture Magistrate Court Alor Gajah Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to any person which prevents the person from following his normal occupation for more than four (4) calendar days. RM2,000
MAXTER GLOVE MANUFACTURING SDN BHD 2019-09-24 Manufacturing Sessions Court Alor Gajah Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing a safe plant system. RM20,000
FORTRESS MINING SDN BHD 2019-09-23 Mining Sessions Court Kuala Terengganu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM40,000
QUALITY FURNITURE SDN BHD 2019-09-19 Manufacturing Magistrate Court Jasin Reg. 5(1)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify to the nearest DOSH office by the quickly means available within 7 days about accident arising out of or in connection with work, send a report thereof in an approved form. RM2,800
S.P. MEGA INDUSTRIES SDN. BHD. 2019-09-18 Manufacturing Magistrate Court Kulim Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assesment to health any worker that exposes or likely to expose to chemicals hazardous to health. RM5,000
LUM MAH PLASTIC & PRINTING SDN BHD 2019-09-13 Manufacturing Magistrate Court (3) Ayer Keroh Reg. 10(b), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to review trisk assesment to health any worker that exposes or likely to expose to chemicals hazardous to health more than five years have elapsed since the last assessment. RM4,000
BIONIC VISION SDN BHD 2019-09-12 Construction Sessions Court Kota Tinggi Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premise. RM38,000
LADANG PETRI TENGGARA SDN BHD (SUNGAI KACHUR PALM OIL MILL) 2019-09-12 Agriculture Sessions Court Kota Tinggi Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM40,000
SABAHMAS SDN BHD 2019-09-12 Manufacturing Sessions Court Lahad Datu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM12,500
PERUNDING KAA SDN BHD 2019-09-11 Construction Sessions Court Georgetown Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing engineering calculations for slopes while causing landslides. RM40,000
KHOO KOON TAI 2019-09-11 Construction Sessions Court Georgetown Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing engineering calculations for slopes while causing landslides. RM40,000
ORIGINAL CLAY INDUSTRIES SDN BHD 2019-09-10 Manufacturing Magistrate Court (3) Ayer Keroh Section. 35, FMA 1967. Failure to ensure maintain all safety appliances and machinery at all times. RM18,000
LUMSON BINA ENGINEERING SDN BHD 2019-09-10 Construction Sessions Court Butterworth Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM5,000
SYARIKAT PERNIAGAAN PERABOT NURI SDN BHD 2019-09-04 Business Services Sessions Court Kota Kinabalu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM12,000
RAHMAN HYDRAULIC TIN SDN BHD 2019-09-03 Quarrying Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing supervision at workplace. RM40,000
EL ALUMINIUM BILLET (M) SDN BHD 2019-08-30 Manufacturing Magistrate Court (3) Ayer Keroh Reg. 26, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure that the exposure of employees to chemicals hazardous to health is monitored in accordance with an approved method of monitoring and analysis. RM2,000
EL ALUMINIUM BILLET (M) SDN BHD 2019-08-30 Manufacturing Magistrate Court (3) Ayer Keroh Reg. 17(1)(b), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure engineering control equipment be examined and tested for its effectiveness by a hygiene technician. RM2,000
OSK CONSTRUCTION SDN. BHD. 2019-08-29 Construction Magistrate Court Sungai Petani Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM4,000
WEGO MALAYSIA CONSTRUCTION SDN. BHD. 2019-08-29 Construction Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM40,000
SEDIA EGINEERING WORKS SDN BHD 2019-08-29 Construction Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM40,000
CEW SIN PLASTIC PIPE SDN BHD 2019-08-29 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM20,000
JEJAKA TIMBER SDN BHD 2019-08-27 Manufacturing Magistrate Court Gerik Reg. 5(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to record in a register chemicals hazardous to health used in the place of work. RM3,000
JEJAKA TIMBER SDN BHD 2019-08-27 Manufacturing Magistrate Court Gerik Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM3,500
EIK ENGINEERING SDN BHD 2019-08-26 Manufacturing Sessions Court (2) (2) Johor Bahru Reg. 26, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure that the exposure of employees to chemicals hazardous to health is monitored in accordance with an approved method of monitoring and analysis. RM8,000
SCEC GROUP (MALAYSIA) SDN BHD 2019-08-25 Construction Sessions Court (2) (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing supervision at workplace.. RM18,000
MZA INTERGRATED 2019-08-25 Construction Sessions Court (2) (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe workplace. RM15,000
BEMC CORPORATION 2019-08-25 Construction Sessions Court (2) (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing supervision at workplace. RM20,000
SCEC GROUP (MALAYSIA) SDN BHD 2019-08-25 Construction Sessions Court (2) (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing supervision at workplace. RM18,000
SHUNTO STEEL INDUSTRIES SDN BHD 2019-08-23 Manufacturing Sessions Court Kuching Reg. 27, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to carry out a health surveillance programme. RM5,000
SHUNTO STEEL INDUSTRIES SDN BHD 2019-08-23 Manufacturing Sessions Court Kuching Section 49(1), OSHA 1994. Failure to comply with improvement notice issued. RM62,000
ECOOILS SDN BHD 2019-08-22 Manufacturing Sessions Court (2) Johor Bahru Reg. 26, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure that the exposure of employees to chemicals hazardous to health is monitored in accordance with an approved method of monitoring and analysis. RM8,000
ECOOILS SDN BHD 2019-08-22 Manufacturing Sessions Court (2) Johor Bahru Reg. 26, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure that the exposure of employees to chemicals hazardous to health is monitored in accordance with an approved method of monitoring and analysis. RM8,000
ECOOILS SDN BHD 2019-08-22 Manufacturing Sessions Court (2) Johor Bahru Reg. 17(1)(b), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure engineering control equipment be examined and tested for its effectiveness by a hygiene technician., AKKP 1994. Gagal mengadakan kelengkapan kawalan kejuruteraan. RM8,000
HAILY CONSTRUCTION SDN BHD 2019-08-22 Construction Sessions Court (2) Johor Bahru Reg. 5(1)(a), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickly means available. RM5,000
ECA C & E SDN BHD 2019-08-22 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing supervision at workplace.. RM15,000
HAILY CONSTRUCTION SDN BHD 2019-08-22 Construction Sessions Court (2) Johor Bahru Reg. 5(1)(a), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickly means available. RM5,000
KOH GAI YUN (T/A LIP SIN RED TEA TRADING) 2019-08-22 Restaurant Magistrate Court Georgetown Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM5,000
SPECTRON 2019-08-21 Utilities Gas Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM30,000
GEIGER (M) SDN. BHD. 2019-08-20 Manufacturing Sessions Court Sungai Petani Reg. 5(1)(b)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify to the nearest DOSH office by the quickly means available within 7 days about accident arising out of or in connection with work, send a report thereof in an approved form. RM9,000
GEIGER (M) SDN. BHD. 2019-08-20 Manufacturing Sessions Court Sungai Petani Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM9,000
GEIGER (M) SDN. BHD. 2019-08-20 Manufacturing Sessions Court Sungai Petani Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM4,000
BELTON SPRINGS SDN.BHD 2019-08-20 Manufacturing Magistrate Court Sungai Siput Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to any person which prevents the person from following his normal occupation for more than four (4) calendar days. RM4,500
EVERZINC MALAYSIA SDN BHD 2019-08-19 Manufacturing Sessions Court (2) Johor Bahru Section 17(1), OSHA 1994. Failure to ensure, so far as is practicable, that he and other persons, not being his employees, who may be affected thereby are not thereby exposed to risks to their safety or health. RM10,000
CGPV INDUSTRIAL BUILDING SYSTEM SDN BHD 2019-08-19 Manufacturing Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe connection of wire. RM10,000
AKSESORI SETIA SDN BHD 2019-08-19 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing engineering control on machinery. RM15,000
ZENBES SDN BHD 2019-08-19 Manufacturing Magistrate Court Batu Gajah Reg. 26, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure that the exposure of employees to chemicals hazardous to health is monitored in accordance with an approved method of monitoring and analysis. RM2,500
TYREOIL (M) SDN BHD 2019-08-19 Manufacturing Magistrate Court Batu Gajah Reg. 5, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to identify and record in a register all chemicals hazardous to health used in the place of work. RM3,000
TYREOIL (M) SDN BHD 2019-08-19 Manufacturing Magistrate Court Batu Gajah Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assesment to health any worker that exposes or likely to expose to chemicals hazardous to health. RM2,500
RAUB SAWMILLS SDN BHD 2019-08-19 Manufacturing Criminal Magistrate Court Reg. 10, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct review risk assesment to health any worker that exposes or likely to expose to chemicals hazardous to health for more than five years have elapsed since the last assessment. RM6,500
TRIENEKENS (SARAWAK) SDN BHD 2019-08-15 Sanitary Services Sessions Court Kuching Reg. 28, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to remove employee from any work that exposes or likely to expose him to chemicals hazardous to health. RM3,000
TRIENEKENS (SARAWAK) SDN BHD 2019-08-15 Sanitary Services Sessions Court Kuching Reg. 28, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to remove employee from any work that exposes or likely to expose him to chemicals hazardous to health. RM3,000
TRIENEKENS (SARAWAK) SDN BHD 2019-08-15 Sanitary Services Sessions Court Kuching Reg. 28, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to remove employee from any work that exposes or likely to expose him to chemicals hazardous to health. RM3,000
REVENUE MOMENTUM SDN BHD 2019-08-14 Manufacturing Magistrate Court Ipoh Reg. 5, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to identify and record in a register all chemicals hazardous to health used in the place of work. RM3,000
GEBENG QUARRY SDN BHD 2019-08-13 Mining Sessions Court Kuantan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM15,000
ENRICH UNION SDN BHD 2019-08-13 Construction Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work when handling scaffold. RM30,000
SABAH OXYGEN SDN BHD 2019-08-13 Manufacturing Magistrate Court Kota Kinabalu Reg. 14(1), OSH (CLASS) Regulations 2013, OSHA 1994. Failure to prepare an inventory of hazardous chemicals consisting of information on each hazardouschemical. RM800
SABAH OXYGEN SDN BHD 2019-08-13 Manufacturing Magistrate Court Kota Kinabalu Reg. 14(1), OSH (CLASS) Regulations 2013, OSHA 1994. Failure to prepare an inventory of hazardous chemicals consisting of information on each hazardouschemical. RM800
SABAH OXYGEN SDN BHD 2019-08-13 Manufacturing Magistrate Court Kota Kinabalu Reg. 14(1), OSH (CLASS) Regulations 2013, OSHA 1994. Failure to prepare an inventory of hazardous chemicals consisting of information on each hazardouschemical. RM800
SABAH OXYGEN SDN BHD 2019-08-13 Manufacturing Magistrate Court Kota Kinabalu Reg. 14(1), OSH (CLASS) Regulations 2013, OSHA 1994. Failure to prepare an inventory of hazardous chemicals consisting of information on each hazardouschemical. RM800
SABAH OXYGEN SDN BHD 2019-08-13 Manufacturing Magistrate Court Kota Kinabalu Reg. 14(1), OSH (CLASS) Regulations 2013, OSHA 1994. Failure to prepare an inventory of hazardous chemicals consisting of information on each hazardouschemical. RM800
SABAH OXYGEN SDN BHD 2019-08-13 Manufacturing Magistrate Court Kota Kinabalu Reg. 14(1), OSH (CLASS) Regulations 2013, OSHA 1994. Failure to prepare an inventory of hazardous chemicals consisting of information on each hazardouschemical. RM800
SABAH OXYGEN SDN BHD 2019-08-13 Manufacturing Magistrate Court Kota Kinabalu Reg. 14(1), OSH (CLASS) Regulations 2013, OSHA 1994. Failure to prepare an inventory of hazardous chemicals consisting of information on each hazardouschemical. RM800
CHANGANN INDUSTRIES SDN BHD 2019-08-07 Manufacturing Magistrate Court Ipoh Reg. 17(1)(b), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure engineering control equipment be examined and tested for its effectiveness by a hygiene technician. RM3,500
GB KUARI SDN BHD 2019-08-07 Quarrying Sessions Court Ipoh Sec. 15, FMA 1967. Failure to ensure every dangerous part of any machinery shall be securely fenced. RM15,000
WZR PROPERTY SDN BHD 2019-08-06 Construction Magistrate Court Kuala Terengganu Section 17(1), OSHA 1994. Failure to ensure, so far as is practicable, that he and other persons, not being his employees, who may be affected thereby are not thereby exposed to risks to their safety or health. RM10,000
A.A.H ENTERPRISE 2019-08-06 Business Services Magistrate Court Kuala Terengganu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM10,000
YA LOK INDUSTRIAL (M) SDN BHD 2019-08-05 Construction Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM30,000
TAN CHONG MOTOR ASSEMBLIES SDN BHD 2019-08-05 Manufacturing Criminal Magistrate Court Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM4,000
GEOHARBOUR SDN BHD 2019-08-05 Pembinaan Criminal Magistrate Court Section 17(1), OSHA 1994. Failure to ensure, so far as is practicable, that he and other persons, not being his employees, who may be affected thereby are not thereby exposed to risks to their safety or health. RM12,000
UUM ENGINEERING SDN BHD 2019-08-02 Construction Sessions CourtGeorgetown Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing fenced at opening edge as to prevent risk of persons falling. RM28,000
PRESS METAL BINTULU SDN BHD 2019-08-02 Manufacturing Sessions Court Bintulu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM15,000
IMPERIAL GARMENTS SDN BHD 2019-08-01 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM15,000
UNITED PLANTATIONS BERHAD, UIE ESTATES 2019-08-01 Agriculture Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM15,000
SIRIJAYA INDUSTRIES SDN BHD 2019-08-01 Manufacturing Sessions Court Ipoh Sec. 15, FMA 1967. Failure to ensure every dangerous part of any machinery shall be securely fenced. RM17,000
LYSAGHT GALVANIZED STEEL BHD 2019-08-01 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM35,000
ONDULINE BUILDING MATERIALS (M) SDN BHD 2019-08-01 Manufacturing Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure (SOP). RM30,000
PMI-TECHNOLOGY SDN BHD 2019-07-31 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe way of working on handling self-align rotator. RM30,000
PETROGAZ ENGINERRING SDN BHD 2019-07-31 Construction Sessions Court Ipoh Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickest means available within 7 days.. RM5,000
PETROGAZ ENGINERRING SDN BHD 2019-07-31 Construction Sessions Court Ipoh Section 10(c), FMA 1967. Failure to ensure all working levels with opening edge is safely constructed so as to prevent risk of persons falling. RM30,000
ACME FERRITE PRODUCTS SDN BHD 2019-07-31 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing fence around the machine's spare part store located on the first floor (1) of the R&D office resulting in accident to employee. RM15,000
PMI-TECHNOLOGY SDN BHD 2019-07-31 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe way of working on handling self-align rotator. RM30,000
PETROGAZ ENGINERRING SDN BHD 2019-07-31 Construction Sessions Court Ipoh Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickest means available within 7 days.. RM5,000
PETROGAZ ENGINERRING SDN BHD 2019-07-31 Construction Sessions Court Ipoh Section 10(c), FMA 1967. Failure to ensure all working levels with opening edge is safely constructed so as to prevent risk of persons falling. RM30,000
ACME FERRITE PRODUCTS SDN BHD 2019-07-31 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing fence around the machine's spare part store located on the first floor (1) of the R&D office resulting in accident to employee. RM15,000
SLEI SDN BHD 2019-07-29 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on lifting and loading work using the overhead traveling crane (OTC). RM10,000
BOUSTED NAVAL SHIPYARD 2019-07-29 Manufacturing Sessions Court Ipoh Section 10(e), FMA 1967. Failure to ensure all opening on working levels securely covered so as to prevent risk of persons falling. RM35,000
SLEI SDN BHD 2019-07-29 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on lifting and loading work using the overhead traveling crane (OTC). RM10,000
BOUSTED NAVAL SHIPYARD 2019-07-29 Manufacturing Sessions Court Ipoh Section 10(e), FMA 1967. Failure to ensure all opening on working levels securely covered so as to prevent risk of persons falling. RM35,000
Saleswide Sdn Bhd 2019-07-26 Manufacturing Criminal Magistrate Court Eight (8) Reg. 4(2), OSH (CLASS) Regulations 2000, OSHA 1994. Failure to classify chemical as a hazardous chemical accordance with the physical, health and environmental hazard of the chemical. RM2,700
Saleswide Sdn Bhd 2019-07-26 Manufacturing Criminal Magistrate Court Eight (8) Reg. 8(3), OSH (CLASS) Regulations 2000, OSHA 1994. Failure to label packaging of hazardous chemical accordance to the hazard pictogram, signal word and hazard statement as specified in the First Schedule. RM2,700
Saleswide Sdn Bhd 2019-07-26 Manufacturing Criminal Magistrate Court Eight (8) Reg. 4(2), OSH (CLASS) Regulations 2000, OSHA 1994. Failure to classify chemical as a hazardous chemical accordance with the physical, health and environmental hazard of the chemical. RM2,700
Saleswide Sdn Bhd 2019-07-26 Manufacturing Criminal Magistrate Court Eight (8) Reg. 8(3), OSH (CLASS) Regulations 2000, OSHA 1994. Failure to label packaging of hazardous chemical accordance to the hazard pictogram, signal word and hazard statement as specified in the First Schedule. RM2,700
LEBTECH CONSTRUCTION SDN. BHD 2019-07-25 Construction Magistrate Court Ipoh Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer for building operation where the total contract price of the project exceeds twenty million ringgit. RM3,000
ECONSAVE CASH&CARRY (KLE) SDN BHD 2019-07-25 Manufacturing Magistrate Court Ipoh Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to any person which prevents the person from following his normal occupation for more than four (4) calendar days. RM3,300
LEBTECH CONSTRUCTION SDN. BHD 2019-07-25 Construction Magistrate Court Ipoh Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer for building operation where the total contract price of the project exceeds twenty million ringgit. RM3,000
ECONSAVE CASH&CARRY (KLE) SDN BHD 2019-07-25 Manufacturing Magistrate Court Ipoh Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to any person which prevents the person from following his normal occupation for more than four (4) calendar days. RM3,300
PGS CONSTRUCTION SDN BHD 2019-07-24 Construction Sessions Court Three (3) Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing supervision working at height (WAH) on his worker. RM15,000
SAN MIGUEL YAMAMURA PRODUCTS SDN BHD 2019-07-24 Manufacturing Sessions Court Three (3) Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing a guard on rotary machine. RM15,000
LAI PAU CONSTRUCTION SDN BHD 2019-07-24 Construction Sessions Court Three (3) Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing training on lifting of bricks activities. RM20,000
PGS CONSTRUCTION SDN BHD 2019-07-24 Construction Sessions Court Three (3) Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing supervision working at height (WAH) on his worker. RM15,000
SAN MIGUEL YAMAMURA PRODUCTS SDN BHD 2019-07-24 Manufacturing Sessions Court Three (3) Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing a guard on rotary machine. RM15,000
LAI PAU CONSTRUCTION SDN BHD 2019-07-24 Construction Sessions Court Three (3) Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing training on lifting of bricks activities. RM20,000
TANLOON PLANTATION SDN BHD 2019-07-23 Manufacturing Magistrate Court Teluk Intan Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM800
HUM BURG (M) SDN BHD 2019-07-23 Manufacturing Magistrate Court Ipoh Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to a person which prevents the person from following his normal occupation for more than four (4) calendar days. RM3,300
TANLOON PLANTATION SDN BHD 2019-07-23 Manufacturing Magistrate Court Teluk Intan Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM800
HUM BURG (M) SDN BHD 2019-07-23 Manufacturing Magistrate Court Ipoh Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to a person which prevents the person from following his normal occupation for more than four (4) calendar days. RM3,300
KILANG MAKANAN MAMEE SDN. BHD. (51103-K) 2019-07-22 Manufacturing Magistrate Court Five (5), Petaling Jaya Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM4,000
KILANG MAKANAN MAMEE SDN. BHD. (51103-K) 2019-07-22 Manufacturing Magistrate Court Five (5), Petaling Jaya Reg. 5(1)(b)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify to the nearest DOSH office by the quickest means available within 7 days about accident arising out of or in connection with work, send a report thereof in an approved form. RM6,000
S 2 R Bizz Enterprise 2019-07-22 Business Services Perniagaan Sessions Court Kuala Terengganu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe way of working on cutting a used drum barrel resulted in a fatal accident to his employee. RM8,000
KILANG MAKANAN MAMEE SDN. BHD. (51103-K) 2019-07-22 Manufacturing Magistrate Court Five (5), Petaling Jaya Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM4,000
KILANG MAKANAN MAMEE SDN. BHD. (51103-K) 2019-07-22 Manufacturing Magistrate Court Five (5), Petaling Jaya Reg. 5(1)(b)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify to the nearest DOSH office by the quickest means available within 7 days about accident arising out of or in connection with work, send a report thereof in an approved form. RM6,000
S 2 R Bizz Enterprise 2019-07-22 Business Services Perniagaan Sessions Court Kuala Terengganu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe way of working on cutting a used drum barrel resulted in a fatal accident to his employee. RM8,000
BERJAYA HILLS RESORT BERHAD 2019-07-19 Hotel Sessions Court Raub Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing a safe working system on entry into confined spaces resulting in accident to employee. RM20,000
BERJAYA HILLS RESORT BERHAD 2019-07-19 Hotel Sessions Court Raub Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing a safe working system on entry into confined spaces resulting in accident to employee. RM20,000
KIM LOONG PALM OIL MILL SDN BHD 2019-07-17 Manufacturing Sessions Court Kota Tinggi Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing training on fiber bundle compressor machine. RM30,000
KIM LOONG PALM OIL MILL SDN BHD 2019-07-17 Manufacturing Sessions Court Kota Tinggi Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing training on fiber bundle compressor machine. RM30,000
BINA SEPAKAT SELATAN 2019-07-16 Construction Sessions Court Kluang Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premise. RM10,000
BOWLMAN FURNITURE SDN BHD 2019-07-16 Manufacturing Sessions Court Kluang Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct review risk assesment to health for more than five years have elapsed since the last assessment. RM7,000
BOWLMAN FURNITURE SDN BHD 2019-07-16 Manufacturing Sessions Court Kluang Reg. 17(b), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure engineering control equipment be examined and tested for its effectiveness by a hygiene technician. RM7,000
BOWLMAN FURNITURE SDN BHD 2019-07-16 Manufacturing Sessions Court Kluang Reg. 26, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure that the exposure of employees to chemicals hazardous to health is monitored in accordance with an approved method of monitoring and analysis. RM7,000
BOWLMAN FURNITURE SDN BHD 2019-07-16 Manufacturing Sessions Court Kluang Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM2,500
KAHANG PALM OIL MILL SDN BHD (LADANG BUKIT CANTIK) 2019-07-16 Agriculture Sessions Court Kluang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe way of working on roof drainage works. RM5,000
BINA SEPAKAT SELATAN 2019-07-16 Construction Sessions Court Kluang Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premise. RM10,000
BOWLMAN FURNITURE SDN BHD 2019-07-16 Manufacturing Sessions Court Kluang Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct review risk assesment to health for more than five years have elapsed since the last assessment. RM7,000
BOWLMAN FURNITURE SDN BHD 2019-07-16 Manufacturing Sessions Court Kluang Reg. 17(b), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure engineering control equipment be examined and tested for its effectiveness by a hygiene technician. RM7,000
BOWLMAN FURNITURE SDN BHD 2019-07-16 Manufacturing Sessions Court Kluang Reg. 26, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to ensure that the exposure of employees to chemicals hazardous to health is monitored in accordance with an approved method of monitoring and analysis. RM7,000
BOWLMAN FURNITURE SDN BHD 2019-07-16 Manufacturing Sessions Court Kluang Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM2,500
KAHANG PALM OIL MILL SDN BHD (LADANG BUKIT CANTIK) 2019-07-16 Agriculture Sessions Court Kluang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe way of working on roof drainage works. RM5,000
VERMI INDUSTRIES SDN BHD 2019-07-15 Manufacturing Sessions Court Two (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe way of working for steamer and cutter machines. RM12,000
CEDY THIRD CONSTRUCTION AND TRADING SDN BHD 2019-07-15 Manufacturing Sessions Court Two (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe plant on cleaning activities. RM20,000
Imbangan Juara 2019-07-15 Construction Sessions Court Butterworth Section. 35, FMA 1967. Failiure to notify in written notice in the prescribed form not later than seven (7) days from the commencement of works of engineering construction on projects of upgrading irrigation systems and agricultural drainage. RM8,000
Imbangan Juara 2019-07-15 Construction Sessions Court Butterworth Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM3,000
VERMI INDUSTRIES SDN BHD 2019-07-15 Manufacturing Sessions Court Two (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe way of working for steamer and cutter machines. RM12,000
CEDY THIRD CONSTRUCTION AND TRADING SDN BHD 2019-07-15 Manufacturing Sessions Court Two (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe plant on cleaning activities. RM20,000
Imbangan Juara 2019-07-15 Construction Sessions Court Butterworth Section. 35, FMA 1967. Failiure to notify in written notice in the prescribed form not later than seven (7) days from the commencement of works of engineering construction on projects of upgrading irrigation systems and agricultural drainage. RM8,000
Imbangan Juara 2019-07-15 Construction Sessions Court Butterworth Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM3,000
SUNGAI BURUNG INDUSTRIES SDN BHD 2019-07-11 Manufacturing Sessions Court Tawau Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by ensuring safety of workers during grading of oil palm fruits. RM50,000
SUNGAI BURUNG INDUSTRIES SDN BHD 2019-07-11 Manufacturing Sessions Court Tawau Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by ensuring safety of workers during grading of oil palm fruits. RM50,000
Syarqiah Holdings Sdn. Bhd. 2019-07-04 Construction Magistrate Court Kangar Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM5,000
Syarqiah Holdings Sdn. Bhd. 2019-07-04 Construction Magistrate Court Kangar Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM5,000
K-LANGAT CONSTRUCTION SDN. BHD. (927236-D) 2019-07-03 Construction Magistrate Court Kajang Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM3,000
Tuju Setia Sdn Bhd 2019-07-03 Construction Mahkamah Sesyen Jenayah 12 Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing competent scaffolder as mentioned in Safe Operating Procedure (SOP) that resulting in fatal accident to employee. RM40,000
K-LANGAT CONSTRUCTION SDN. BHD. (927236-D) 2019-07-03 Construction Magistrate Court Kajang Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM3,000
Tuju Setia Sdn Bhd 2019-07-03 Construction Mahkamah Sesyen Jenayah 12 Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing competent scaffolder as mentioned in Safe Operating Procedure (SOP) that resulting in fatal accident to employee. RM40,000
AMPLE LAND SDN. BHD. 2019-06-27 Agriculture Sessions Court Lahad Datu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on handling of pole sickle in farm. RM15,000
AMPLE LAND SDN. BHD. 2019-06-27 Agriculture Sessions Court Lahad Datu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on handling of pole sickle in farm. RM15,000
Kilang Batu Tampin 2019-06-26 Quarrying Sessions Court Tampin Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) training to his employee. RM13,000
SEMANTRA NO-DIG ENGINEERING SDN BHD 2019-06-26 Construction Sessions Court Three (3) Ayer Keroh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing supervision working in confined space (CS). RM20,000
Kilang Batu Tampin 2019-06-26 Quarrying Sessions Court Tampin Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) training to his employee. RM13,000
SEMANTRA NO-DIG ENGINEERING SDN BHD 2019-06-26 Construction Sessions Court Three (3) Ayer Keroh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing supervision working in confined space (CS). RM20,000
Restoran Jaya 2019-06-25 Restaurant Magistrate Court Georgetown Section 19, FMA 1967. Failure to obtain certificate fitness before operate any machinery including electric hoist, unless there is in force in relation to the operation of the machinery valid certificate of fitness issued under this Act. RM10,000
Restoran Jaya 2019-06-25 Restaurant Magistrate Court Georgetown Section 19, FMA 1967. Failure to obtain certificate fitness before operate any machinery including electric hoist, unless there is in force in relation to the operation of the machinery valid certificate of fitness issued under this Act. RM10,000
HSL DMIA JV Sdn Bhd 2019-06-24 Construction Sessions Court Sibu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work on electrical wiring system during performed electric welding joint for extension of balance cantilever. RM20,000
Billion Cherish Sdn Bhd 2019-06-24 Forestry Sessions Court Sibu Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickest means available. RM5,000
Plustage Sdn Bhd 2019-06-24 Construction Sessions Court Sibu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing secure access to work site resulting in accident. RM20,000
KERIS SUCCESS TRANSPORT SDN. BHD. 2019-06-24 Storage Sessions Court Tawau Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on stacking fertilizer bags. RM25,000
KERIS SUCCESS TRANSPORT SDN. BHD. 2019-06-24 Storage Sessions Court Tawau Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickest means available. RM4,000
Chew See Peng Construction Sdn Bhd 2019-06-24 Construction Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on installing a 'c-channel' on the building's roof structure resulting in fatal accident to three (3) employees. RM27,000
HSL DMIA JV Sdn Bhd 2019-06-24 Construction Sessions Court Sibu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work on electrical wiring system during performed electric welding joint for extension of balance cantilever. RM20,000
Billion Cherish Sdn Bhd 2019-06-24 Forestry Sessions Court Sibu Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickest means available. RM5,000
Plustage Sdn Bhd 2019-06-24 Construction Sessions Court Sibu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing secure access to work site resulting in accident. RM20,000
KERIS SUCCESS TRANSPORT SDN. BHD. 2019-06-24 Storage Sessions Court Tawau Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on stacking fertilizer bags. RM25,000
KERIS SUCCESS TRANSPORT SDN. BHD. 2019-06-24 Storage Sessions Court Tawau Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickest means available. RM4,000
Chew See Peng Construction Sdn Bhd 2019-06-24 Construction Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on installing a 'c-channel' on the building's roof structure resulting in fatal accident to three (3) employees. RM27,000
PEMBINAAN HOMEWISE (MALAYSIA) SDN BHD 2019-06-21 Construction Magistrate Court Three (3) Ayer Keroh Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickest means available. RM3,000
PEMBINAAN HOMEWISE (MALAYSIA) SDN BHD 2019-06-21 Construction Magistrate Court Three (3) Ayer Keroh Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickest means available. RM3,000
JUTA TARAF CONCRETE PRODUCTS SDN BHD 2019-06-20 Manufacturing Magistrate Court Tg Malim Reg. 5(1)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to nearest DOSH office in an approved form about dangerous occurrences which causes serious bodily injury as specified in Second Schedule. RM6,000
JUTA TARAF CONCRETE PRODUCTS SDN BHD 2019-06-20 Manufacturing Magistrate Court Tg Malim Reg. 9, OSH (NADOPOD) Regulations 2004, OSHA 1994. Interference at dangerous occurrence scene. RM6,000
Southland Tatt Win Rubber Sdn Bhd 2019-06-20 Manufacturing Magistrate Court Jelebu Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to any person which prevents the person from following his normal occupation for more than four (4) calendar days. RM7,000
CF Jaya Construction 2019-06-20 Construction Magistrate Court Alor Setar Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO) for building operation where the total contract price of the project exceeds twenty million ringgit. RM3,000
JUTA TARAF CONCRETE PRODUCTS SDN BHD 2019-06-20 Manufacturing Magistrate Court Tg Malim Reg. 5(1)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to nearest DOSH office in an approved form about dangerous occurrences which causes serious bodily injury as specified in Second Schedule. RM6,000
JUTA TARAF CONCRETE PRODUCTS SDN BHD 2019-06-20 Manufacturing Magistrate Court Tg Malim Reg. 9, OSH (NADOPOD) Regulations 2004, OSHA 1994. Interference at dangerous occurrence scene. RM6,000
Southland Tatt Win Rubber Sdn Bhd 2019-06-20 Manufacturing Magistrate Court Jelebu Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to any person which prevents the person from following his normal occupation for more than four (4) calendar days. RM7,000
CF Jaya Construction 2019-06-20 Construction Magistrate Court Alor Setar Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO) for building operation where the total contract price of the project exceeds twenty million ringgit. RM3,000
Kehzen Engineering Sdn Bhd 2019-06-18 Construction Sessions Court Georgetown Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing any risk assesment for installation of cage platform activities resulting in fatal accident to employee due to working at height (WAH). RM15,000
Taiko Marketing Sdn Bhd 2019-06-18 Manufacturing Magistrate Court Bukit Mertajam Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to health (hydrogen peroxide, nitric acid and calcium chloride) of the employee. RM5,000
Taiko Marketing Sdn Bhd 2019-06-18 Manufacturing Magistrate Court Bukit Mertajam Reg. 5(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to record in a register chemicals hazardous to health (hydrogen peroxide, nitric acid and calcium chloride) used in the place of work. RM3,000
TUNAS GEMILANG TKK ENTERPRISE 2019-06-18 Construction Sessions Court Ipoh Section 10(e), FMA 1967. Failure to ensure lift pit is securely fenced so as to prevent risk of persons falling. RM30,000
WIM AUTOMATION & JIG SDN. BHD 2019-06-18 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on mould lifting activities that lead to accident of right index finger reattached. RM25,000
RIPCOL INDUSTRIES SDN BHD 2019-06-18 Manufacturing Sessions Court Ipoh Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM3,300
SYARIKAT PUKIN LADANG KELAPA SAWIT 2019-06-18 Manufacturing Sessions Court Kuantan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by closing sampling point destoner air lock kernel plant that cause fingers reattached. RM12,000
Kehzen Engineering Sdn Bhd 2019-06-18 Construction Sessions Court Georgetown Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing any risk assesment for installation of cage platform activities resulting in fatal accident to employee due to working at height (WAH). RM15,000
Taiko Marketing Sdn Bhd 2019-06-18 Manufacturing Magistrate Court Bukit Mertajam Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to health (hydrogen peroxide, nitric acid and calcium chloride) of the employee. RM5,000
Taiko Marketing Sdn Bhd 2019-06-18 Manufacturing Magistrate Court Bukit Mertajam Reg. 5(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to record in a register chemicals hazardous to health (hydrogen peroxide, nitric acid and calcium chloride) used in the place of work. RM3,000
TUNAS GEMILANG TKK ENTERPRISE 2019-06-18 Construction Sessions Court Ipoh Section 10(e), FMA 1967. Failure to ensure lift pit is securely fenced so as to prevent risk of persons falling. RM30,000
WIM AUTOMATION & JIG SDN. BHD 2019-06-18 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on mould lifting activities that lead to accident of right index finger reattached. RM25,000
RIPCOL INDUSTRIES SDN BHD 2019-06-18 Manufacturing Sessions Court Ipoh Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM3,300
SYARIKAT PUKIN LADANG KELAPA SAWIT 2019-06-18 Manufacturing Sessions Court Kuantan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by closing sampling point destoner air lock kernel plant that cause fingers reattached. RM12,000
CKS SUPERMARKET SDN BHD 2019-06-13 Retail Trades Magistrate Court kota Kinabalu Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to a person which prevents the person from following his normal occupation for more than four (4) calendar days. RM1,500
Asia Plywood Company Sdn. Bhd. 2019-06-13 Manufacturing Sessions Court Sg. Petani Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM10,000
Asia Plywood Company Sdn. Bhd. 2019-06-13 Manufacturing Sessions Court Sg. Petani Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) that lead to accident to the worker. RM40,000
Asia Plywood Company Sdn. Bhd. 2019-06-13 Manufacturing Sessions Court Sg. Petani Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM5,000
CKS SUPERMARKET SDN BHD 2019-06-13 Retail Trades Magistrate Court kota Kinabalu Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to a person which prevents the person from following his normal occupation for more than four (4) calendar days. RM1,500
Asia Plywood Company Sdn. Bhd. 2019-06-13 Manufacturing Sessions Court Sg. Petani Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM10,000
Asia Plywood Company Sdn. Bhd. 2019-06-13 Manufacturing Sessions Court Sg. Petani Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) that lead to accident to the worker. RM40,000
Asia Plywood Company Sdn. Bhd. 2019-06-13 Manufacturing Sessions Court Sg. Petani Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer (SHO). RM5,000
Tan Kang Hai Transport Company Sdn Bhd 2019-06-12 Manufacturing Sessions Court Seremban Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM3,000
Tan Kang Hai Transport Company Sdn Bhd 2019-06-12 Manufacturing Sessions Court Seremban Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) for cleaning and general maintanence of lorry. RM5,000
Tan Kang Hai Transport Company Sdn Bhd 2019-06-12 Manufacturing Sessions Court Seremban Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM3,000
Tan Kang Hai Transport Company Sdn Bhd 2019-06-12 Manufacturing Sessions Court Seremban Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) for cleaning and general maintanence of lorry. RM5,000
Evergreen Rubberwood Sdn Bhd 2019-05-30 Manufacturing Magistrate Court Tanah Merah Reg. 5(1)(b)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to nearest DOSH office in an approved form about dangerous occurrences which causes serious bodily injury as specified in Second Schedule. RM1,000
Evergreen Rubberwood Sdn Bhd 2019-05-30 Manufacturing Magistrate Court Tanah Merah Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) for rubber wood cutting activities. RM3,000
Evergreen Rubberwood Sdn Bhd 2019-05-30 Manufacturing Magistrate Court Tanah Merah Reg. 5(1)(b)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to nearest DOSH office in an approved form about dangerous occurrences which causes serious bodily injury as specified in Second Schedule. RM1,000
Evergreen Rubberwood Sdn Bhd 2019-05-30 Manufacturing Magistrate Court Tanah Merah Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) for rubber wood cutting activities. RM3,000
MALINDO AIRWAYS SDN BHD (1018546-W) 2019-05-28 Transportation Magistrate Court Sepang Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to a person which prevents the person from following his normal occupation for more than four (4) calendar days. RM5,000
MALINDO AIRWAYS SDN BHD (1018546-W) 2019-05-28 Transportation Magistrate Court Sepang Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to a person which prevents the person from following his normal occupation for more than four (4) calendar days. RM5,000
PANASONIC AVC NETWORKS JOJOR MALAYSIA SDN BHD 2019-05-27 Manufacturing Sessions Court Two (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on inspection of cooling tower pipe. RM30,000
PANASONIC AVC NETWORKS JOJOR MALAYSIA SDN BHD 2019-05-27 Manufacturing Sessions Court Two (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on inspection of cooling tower pipe. RM30,000
ALL COSMOS INDUSTRIES SDN BHD 2019-05-25 Manufacturing Sessions Court Two (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by adhere to work procedures. RM25,000
ALL COSMOS INDUSTRIES SDN BHD 2019-05-25 Manufacturing Sessions Court Two (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by adhere to work procedures. RM25,000
SERI MORIB PALM OIL MILL SDN BHD (1188831-U) 2019-05-24 Manufacturing Magistrate Court Teluk Datok, Banting Selangor Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM5,000
SERI MORIB PALM OIL MILL SDN BHD (1188831-U) 2019-05-24 Manufacturing Magistrate Court Teluk Datok, Banting Selangor Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM5,000
PKSJ FERTILIZERS SDN BHD (825614-D) 2019-05-23 Manufacturing Magistrate Court Five (5) Klang Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to any person which prevents the person from following his normal occupation for more than four (4) calendar days. RM1,000
FAIRMONT INDUSTRIES SDN BHD (464734-X) 2019-05-23 Manufacturing Magistrate Court Three (3) Klang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing maintenance on autoclave machine with registration number, PMT15873. RM25,000
GIESECKE & DEVRIENT MALAYSIA (573030-M) 2019-05-23 Manufacturing Magistrate Court Three (3) Shah Alam Reg. 5(1)(b)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to nearest DOSH office in an approved form about dangerous occurrences which causes serious bodily injury as specified in Second Schedule. RM7,000
CONCRETE ENGINEERING PRODUCT SDN BHD 2019-05-23 Manufacturing Sessions Court Two (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe plant for piling spinnning work. RM40,000
PKSJ FERTILIZERS SDN BHD (825614-D) 2019-05-23 Manufacturing Magistrate Court Five (5) Klang Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH which causes bodily injury to any person which prevents the person from following his normal occupation for more than four (4) calendar days. RM1,000
FAIRMONT INDUSTRIES SDN BHD (464734-X) 2019-05-23 Manufacturing Magistrate Court Three (3) Klang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing maintenance on autoclave machine with registration number, PMT15873. RM25,000
GIESECKE & DEVRIENT MALAYSIA (573030-M) 2019-05-23 Manufacturing Magistrate Court Three (3) Shah Alam Reg. 5(1)(b)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to nearest DOSH office in an approved form about dangerous occurrences which causes serious bodily injury as specified in Second Schedule. RM7,000
CONCRETE ENGINEERING PRODUCT SDN BHD 2019-05-23 Manufacturing Sessions Court Two (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe plant for piling spinnning work. RM40,000
Alpha Precision Turning Engineering Sdn. Bhd. 2019-05-22 Manufacturing Sessions Court Kulim Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM2,000
Alpha Precision Turning Engineering Sdn. Bhd. 2019-05-22 Manufacturing Sessions Court Kulim Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM2,000
SABAH SOFTWOODS BERHAD 2019-05-21 Agriculture Sessions Court Tawau Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on handling and cutting of plam fronds. RM20,000
SABAH SOFTWOODS BERHAD 2019-05-21 Agriculture Sessions Court Tawau Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on handling and cutting of plam fronds. RM20,000
Evergreen Rubberwood Sdn Bhd 2019-05-20 Manufacturing Magistrate Court Pasir Mas Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on rubber wood cutting activities. RM6,000
Evergreen Rubberwood Sdn Bhd 2019-05-20 Manufacturing Magistrate Court Pasir Mas Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on rubber wood cutting activities. RM6,000
Starton Industrial (M) Sdn. Bhd. 2019-05-16 Manufacturing Magistrate Court Sungai Petani Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM3,900
Starton Industrial (M) Sdn. Bhd. 2019-05-16 Manufacturing Magistrate Court Sungai Petani Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM3,900
CLW Builders Sdn Bhd 2019-05-15 Construction Criminal Magistrate Court Eight (8) Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM5,000
MUARA HARTAMAS SDN. BHD. 2019-05-15 Quarrying Magistrate Court Ipoh Reg. 5, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to identify and record in a register chemicals hazardous to health used in the place of work. RM2,800
SMT Resources 2019-05-15 Construction Sessions Court Seremban Section 35, FMA 1967. Failure to notify any building operations not later than seven days from the commencement of those operations serve on the Inspector written in the prescribed form. RM3,000
Diyou Fibre (M) Sdn Bhd 2019-05-15 Manufacturing Sessions Court Seremban Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM3,000
Diyou Fibre (M) Sdn Bhd 2019-05-15 Manufacturing Sessions Court Seremban Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) for 'bundle opener' machine. RM5,000
Boon Hin Eng. & Cons. Sdn. Bhd. 2019-05-15 Manufacturing Sessions Court Sungai Petani Section 34(2)(a), FMA 1967. Failure to obtain written permission of the Inspector begin to use any premises as a factory until one month after he has served on the Inspector a written notice in the prescribed form. RM20,000
Boon Hin Eng. & Cons. Sdn. Bhd. 2019-05-15 Manufacturing Sessions Court Sungai Petani Section 36(1), FMA 1967. Failure to obtain written approval from the Inspector on install machinery of TMT Spiral Duct Machine in factory. RM30,000
Lek Sun Manufacturing Sdn. Bhd. 2019-05-15 Manufacturing Sessions Court Sungai Petani Reg. 5(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to record in a register chemicals hazardous to health used in the place of work. RM8,000
Lek Sun Manufacturing Sdn. Bhd. 2019-05-15 Manufacturing Sessions Court Sungai Petani Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM7,000
CLW Builders Sdn Bhd 2019-05-15 Construction Criminal Magistrate Court Eight (8) Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM5,000
MUARA HARTAMAS SDN. BHD. 2019-05-15 Quarrying Magistrate Court Ipoh Reg. 5, OSH (USECHH) Regulations 2000, OSHA 1994. Failure to identify and record in a register chemicals hazardous to health used in the place of work. RM2,800
SMT Resources 2019-05-15 Construction Sessions Court Seremban Section 35, FMA 1967. Failure to notify any building operations not later than seven days from the commencement of those operations serve on the Inspector written in the prescribed form. RM3,000
Diyou Fibre (M) Sdn Bhd 2019-05-15 Manufacturing Sessions Court Seremban Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM3,000
Diyou Fibre (M) Sdn Bhd 2019-05-15 Manufacturing Sessions Court Seremban Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) for 'bundle opener' machine. RM5,000
Boon Hin Eng. & Cons. Sdn. Bhd. 2019-05-15 Manufacturing Sessions Court Sungai Petani Section 34(2)(a), FMA 1967. Failure to obtain written permission of the Inspector begin to use any premises as a factory until one month after he has served on the Inspector a written notice in the prescribed form. RM20,000
Boon Hin Eng. & Cons. Sdn. Bhd. 2019-05-15 Manufacturing Sessions Court Sungai Petani Section 36(1), FMA 1967. Failure to obtain written approval from the Inspector on install machinery of TMT Spiral Duct Machine in factory. RM30,000
Lek Sun Manufacturing Sdn. Bhd. 2019-05-15 Manufacturing Sessions Court Sungai Petani Reg. 5(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to record in a register chemicals hazardous to health used in the place of work. RM8,000
Lek Sun Manufacturing Sdn. Bhd. 2019-05-15 Manufacturing Sessions Court Sungai Petani Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM7,000
WZR Property Sdn Bhd 2019-05-14 Construction Criminal Sessions Court Twelve (12) Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing fencing on lift shaft opening that cause Total Permanent Disability (TPD) to his worker. RM20,000
Syarikat Muhibah Perniagaan dan Pembinaan Sdn Bhd 2019-05-14 Construction Criminal Magistrate Court Eight (8) Reg. 5(1)(b)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to nearest DOSH office in an approved form about dangerous occurrences which causes serious bodily injury as specified in Second Schedule. RM4,500
Syarikat Muhibah Perniagaan dan Pembinaan Sdn Bhd 2019-05-14 Construction Criminal Magistrate Court Eight (8) Reg. 9, OSH (NADOPOD) Regulations 2004, OSHA 1994. Interference at dangerous occurrence scene. RM4,500
ENGTEX STEEL INDUSTRIES SDN BHD 2019-05-14 Manufacturing Sessions Court Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on inpsection and measurement of roll gap at roller stand. RM10,000
WINENRICH ENTERPRISE SDN BHD 2019-05-14 Construction Sessions Court Three (3) Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing training for working at height (WAH) to their employees. RM20,000
ALLIED PRECISION TECHNOLOGIES (M) SDN BHD 2019-05-14 Manufacturing Sessions Court Three (3) Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) for oil cleaning activities on component frame. RM10,000
ALLIED PRECISION TECHNOLOGIES (M) SDN BHD 2019-05-14 Manufacturing Sessions Court Three (3) Ayer Keroh Melaka Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM3,000
ALLIED PRECISION TECHNOLOGIES (M) SDN BHD 2019-05-14 Manufacturing Sessions Court Three (3) Ayer Keroh Melaka Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM2,000
WZR Property Sdn Bhd 2019-05-14 Construction Criminal Sessions Court Twelve (12) Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing fencing on lift shaft opening that cause Total Permanent Disability (TPD) to his worker. RM20,000
Syarikat Muhibah Perniagaan dan Pembinaan Sdn Bhd 2019-05-14 Construction Criminal Magistrate Court Eight (8) Reg. 5(1)(b)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to nearest DOSH office in an approved form about dangerous occurrences which causes serious bodily injury as specified in Second Schedule. RM4,500
Syarikat Muhibah Perniagaan dan Pembinaan Sdn Bhd 2019-05-14 Construction Criminal Magistrate Court Eight (8) Reg. 9, OSH (NADOPOD) Regulations 2004, OSHA 1994. Interference at dangerous occurrence scene. RM4,500
ENGTEX STEEL INDUSTRIES SDN BHD 2019-05-14 Manufacturing Sessions Court Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on inpsection and measurement of roll gap at roller stand. RM10,000
WINENRICH ENTERPRISE SDN BHD 2019-05-14 Construction Sessions Court Three (3) Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing training for working at height (WAH) to their employees. RM20,000
ALLIED PRECISION TECHNOLOGIES (M) SDN BHD 2019-05-14 Manufacturing Sessions Court Three (3) Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) for oil cleaning activities on component frame. RM10,000
ALLIED PRECISION TECHNOLOGIES (M) SDN BHD 2019-05-14 Manufacturing Sessions Court Three (3) Ayer Keroh Melaka Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM3,000
ALLIED PRECISION TECHNOLOGIES (M) SDN BHD 2019-05-14 Manufacturing Sessions Court Three (3) Ayer Keroh Melaka Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM2,000
IKATAN GEMAJAYA SDN BHD (595641-A) 2019-05-13 Construction Sessions Court Four (4), Klang Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. RM50,000
Minebea Electronics Motor (M) Sdn. Bhd. 2019-05-13 Manufacturing Sessions Court Sungai Petani Reg. 7(1), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to submit reporting of cases of occupational poisoning and occupational disease within 7 days, to the nearest DOSH office in an approved form. RM7,000
Minebea Electronics Motor (M) Sdn. Bhd. 2019-05-13 Manufacturing Sessions Court Sungai Petani Reg. 7(1), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to submit reporting of cases of occupational poisoning and occupational disease within 7 days, to the nearest DOSH office in an approved form. RM7,000
Minebea Electronics Motor (M) Sdn. Bhd. 2019-05-13 Manufacturing Sessions Court Sungai Petani Reg. 7(1), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send reporting of cases of occupational poisoning and occupational disease within 7 days, to the nearest DOSH office in an approved form. RM7,000
Teguh Harian Build-Tech Sdn. Bhd. 2019-05-13 Construction Sessions Court Four (4), Alor Setar Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM20,000
Teguh Harian Build-Tech Sdn. Bhd. 2019-05-13 Construction Sessions Court Four (4), Alor Setar Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM20,000
Teguh Harian Build-Tech Sdn. Bhd. 2019-05-13 Construction Sessions Court Four (4), Alor Setar Reg. 16(7), FM (BOWEC)(SAFETY) Regulations 1986, FMA 1967. Failure to ensure no wiring shall be left on the ground or the floor of a building. RM1,000
IKATAN GEMAJAYA SDN BHD (595641-A) 2019-05-13 Construction Sessions Court Four (4), Klang Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. RM50,000
Minebea Electronics Motor (M) Sdn. Bhd. 2019-05-13 Manufacturing Sessions Court Sungai Petani Reg. 7(1), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to submit reporting of cases of occupational poisoning and occupational disease within 7 days, to the nearest DOSH office in an approved form. RM7,000
Minebea Electronics Motor (M) Sdn. Bhd. 2019-05-13 Manufacturing Sessions Court Sungai Petani Reg. 7(1), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to submit reporting of cases of occupational poisoning and occupational disease within 7 days, to the nearest DOSH office in an approved form. RM7,000
Minebea Electronics Motor (M) Sdn. Bhd. 2019-05-13 Manufacturing Sessions Court Sungai Petani Reg. 7(1), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send reporting of cases of occupational poisoning and occupational disease within 7 days, to the nearest DOSH office in an approved form. RM7,000
Teguh Harian Build-Tech Sdn. Bhd. 2019-05-13 Construction Sessions Court Four (4), Alor Setar Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM20,000
Teguh Harian Build-Tech Sdn. Bhd. 2019-05-13 Construction Sessions Court Four (4), Alor Setar Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM20,000
Teguh Harian Build-Tech Sdn. Bhd. 2019-05-13 Construction Sessions Court Four (4), Alor Setar Reg. 16(7), FM (BOWEC)(SAFETY) Regulations 1986, FMA 1967. Failure to ensure no wiring shall be left on the ground or the floor of a building. RM1,000
TERUSAN BARU SDN BHD 2019-05-08 Agriculture Sessions Court Sandakan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing risk assesment on roofing work. RM2,000
LADANG SABAH SDN BHD 2019-05-08 Manufacturing Sessions Court Sandakan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work on conveyor cleaning work. RM2,000
SUNGAI RUKU OIL PALM PLANTATION 2019-05-08 Manufacturing Sessions Court Sandakan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM2,000
NOAH ARK BUILDERS SDN BHD 2019-05-08 Construction Sessions Court Ipoh Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM10,000
NOAH ARK BUILDERS SDN BHD 2019-05-08 Construction Sessions Court Ipoh Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM10,000
Besgrade Plywood Sdn. Bhd. 2019-05-08 Manufacturing Sessions Court Five (5), Alor Setar Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM4,000
Besgrade Plywood Sdn. Bhd. 2019-05-08 Manufacturing Sessions Court Five (5), Alor Setar Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM4,000
Besgrade Plywood Sdn. Bhd. 2019-05-08 Manufacturing Sessions Court Five (5), Alor Setar Reg. 9, OSH (NADOPOD) Regulations 2004, OSHA 1994. Interference at accident scene that causes death of worker. RM4,000
TERUSAN BARU SDN BHD 2019-05-08 Agriculture Sessions Court Sandakan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing risk assesment on roofing work. RM2,000
LADANG SABAH SDN BHD 2019-05-08 Manufacturing Sessions Court Sandakan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work on conveyor cleaning work. RM2,000
SUNGAI RUKU OIL PALM PLANTATION 2019-05-08 Manufacturing Sessions Court Sandakan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM2,000
NOAH ARK BUILDERS SDN BHD 2019-05-08 Construction Sessions Court Ipoh Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM10,000
NOAH ARK BUILDERS SDN BHD 2019-05-08 Construction Sessions Court Ipoh Section 49(1), OSHA 1994. Failure to comply with prohibition notice issued. RM10,000
Besgrade Plywood Sdn. Bhd. 2019-05-08 Manufacturing Sessions Court Five (5), Alor Setar Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM4,000
Besgrade Plywood Sdn. Bhd. 2019-05-08 Manufacturing Sessions Court Five (5), Alor Setar Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM4,000
Besgrade Plywood Sdn. Bhd. 2019-05-08 Manufacturing Sessions Court Five (5), Alor Setar Reg. 9, OSH (NADOPOD) Regulations 2004, OSHA 1994. Interference at accident scene that causes death of worker. RM4,000
DIPSOL (M) SDN BHD (85327-T) 2019-05-07 Manufacturing Sessions Court (5) Klang Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. RM30,000
Genting Ehsan (SP) Sdn. Bhd. 2019-05-07 Manufacturing Sessions Court Sungai Petani Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH dangerous occurrences which causes serious bodily injury as specified in Second Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM5,000
Genting Ehsan (SP) Sdn. Bhd. 2019-05-07 Manufacturing Sessions Court Sungai Petani Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM3,000
Permata Makmur Sdn. Bhd. 2019-05-07 Manufacturing Sessions Court Kulim Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on wood transfer work. RM10,000
RMN Foundry Enterprise 2019-05-07 Construction Sessions CourtAlor Setar Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM5,000
Zheng Guan Industries Sdn. Bhd. 2019-05-07 Manufacturing Sessions Court Kulim Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM10,000
DIPSOL (M) SDN BHD (85327-T) 2019-05-07 Manufacturing Sessions Court (5) Klang Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. RM30,000
Genting Ehsan (SP) Sdn. Bhd. 2019-05-07 Manufacturing Sessions Court Sungai Petani Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH dangerous occurrences which causes serious bodily injury as specified in Second Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM5,000
Genting Ehsan (SP) Sdn. Bhd. 2019-05-07 Manufacturing Sessions Court Sungai Petani Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM3,000
Permata Makmur Sdn. Bhd. 2019-05-07 Manufacturing Sessions Court Kulim Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP) on wood transfer work. RM10,000
RMN Foundry Enterprise 2019-05-07 Construction Sessions CourtAlor Setar Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickest means available. RM5,000
Zheng Guan Industries Sdn. Bhd. 2019-05-07 Manufacturing Sessions Court Kulim Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work. RM10,000
SUNLIGHT INNO SEAFOOD S/B 2019-05-06 Fishing Sessions Court Kota Kinabalu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work due to inadequate harvesting system that lead to death by an electric shock. RM20,000
SUNLIGHT INNO SEAFOOD S/B 2019-05-06 Fishing Sessions Court Kota Kinabalu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work due to inadequate harvesting system that lead to death by an electric shock. RM20,000
Pedati Teguh Sdn. Bhd. 2019-05-02 Construction Sessions Court Kangar Section 49(2), OSHA 1994. Failure to comply with prohibition notice issued. RM15,000
Pedati Teguh Sdn. Bhd. 2019-05-02 Construction Sessions Court Kangar Section 49(2), OSHA 1994. Failure to comply with prohibition notice issued. RM15,000
Syarikat Penanaman Bukit Senorang Sdn Bhd 2019-04-26 Agriculture Magistrate Court Temerloh Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. 7000
United Goh Brothers Trading Sdn Bhd 2019-04-25 Construction Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing risk analysis for the lifting forklift by using mobile crane resulting in fatal accident to employee. 10000
Kasatani Advance Technology Sdn. Bhd. 2019-04-25 Manufacturing Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing practical safety device to operate power press machine resulting in accident to employee. 8000
WHC Construction Sdn Bhd 2019-04-24 Construction Magistrate Court Bukit Mertajam Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. 3800
RCI LIME SDN BHD 2019-04-24 Manufacturing Magistrate Court Kampar Reg. 17(1)(b), OSH (USECHH) Regulations 2000, OSHA1994. Failure to ensure engineering control equipment examined and tested for its effectiveness by a hygiene technician at appropriate intervals, each interval being no longer than twelve months. 2300
MULTI DISCOVERY SDN. BHD. 2019-04-23 Construction Sessions Court Raub Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. 10000
PERCETAKAN PMI 2019-04-22 Manufacturing Magistrate Court Parit Buntar Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. 4000
Osaka Plastics (M) Sdn. Bhd. 2019-04-22 Manufacturing Sessions Court Sungai Petani Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes bodily injury, which prevents the person from following his normal occupation for more than four (4) calender days. 5000
EKA Food Stuff Sdn. Bhd. 2019-04-17 Manufacturing Sessions Court Sg. Petani Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM4,000
EKA Food Stuff Sdn. Bhd. 2019-04-17 Manufacturing Sessions Court Sg. Petani Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM4,000
EKA Food Stuff Sdn. Bhd. 2019-04-17 Manufacturing Sessions Court Sg. Petani Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM4,000
EKA Food Stuff Sdn. Bhd. 2019-04-17 Manufacturing Sessions Court Sg. Petani Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. RM4,000
KUNTUM RESTU SDN BHD 2019-04-11 Storage Sessions Court Ipoh Reg. 10 - OSH (Control of Industrial Major Accident Hazard) Regulations 1996, OSHA 1994. Failure to provide a complete documents of demonstration safe operation. 10000
HUAT LAI RESOURCES BERHAD 2019-04-11 Agriculture Magistrate Court Jasin Reg. 5(1)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes bodily injury, which prevents the person from following his normal occupation for more than four (4) calender days. 4200
Ocean Hardware Paint Trading Sdn. Bhd. 2019-04-10 Manufacturing Magistrate Court Kulim Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. 5000
SHANGHAI BAOYE (M) SDN BHD 2019-04-08 Construction Sessions Court Kuantan Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. 10000
Teik Joo Chan Sdn Bhd 2019-04-03 Manufacturing Magistrate Court Kampar Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994.Failure to notify death to the nearest DOSH office by the quickly means available. 2000
SRI MARTEK MARBLE 2019-04-02 Manufacturing Magistrate Court Ipoh Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes bodily injury, which prevents the person from following his normal occupation for more than four (4) calender days. 2000
INDAHPACK (PK) SDN BHD 2019-04-02 Manufacturing Magistrate Court Ipoh Reg. 17(1), OSH (USECHH) Regulations 2000, OSHA1994. Failure to ensure engineering control equipment examined and tested for its effectiveness by a hygiene technician at appropriate intervals, each interval being no longer than twelve months. 3000
Soon Guan Engineering works 2019-04-02 Manufacturing Magistrate Court Ipoh Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes bodily injury, which prevents the person from following his normal occupation for more than four (4) calender days. 2000
OSK Construction Sdn Bhd 2019-03-28 Construction Sessions Court Raub Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. 20,000.00
Unicolour Printing Ink Manufacturer 2019-03-25 Manufacturing Magistrate Court Criminal 8 Reg. 5(1), OSH (CLASS) Regulations 2013, OSHA1994. Failure to record the classification of chemicals. 6,000.00
Unicolour Printing Ink Manufacturer 2019-03-25 Manufacturing Magistrate Court Criminal 8 Reg. 5(2), OSH (CLASS) Regulations 2013, OSHA1994. Failure to record of the classification of chemicals as hazardous chemicals available for inspection by an officer. 6,000.00
TENG YUE OVERSEAS CONSTRUCTION SDN BHD 2019-03-25 Construction Sessions Court Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe working platform. RM30,000
ASIAMOST SDN BHD 2019-03-25 Construction Sessions Court Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by ensuring the aerial platform is operated safely. RM10,000
TENG YUE OVERSEAS CONSTRUCTION SDN BHD 2019-03-25 Construction Sessions Court Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe working platform. RM30,000
ASIAMOST SDN BHD 2019-03-25 Construction Sessions Court Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by ensuring the aerial platform is operated safely. RM10,000
MARUWA (MALAYSIA) SDN BHD 2019-03-21 Manufacturing Magistrate Court Ayer Keroh Melaka Reg. 4(2), OSH (CLASS) Regulations 2013, OSHA1994. Failure to classified chemical not listed in Part 1 of the Industry Code of Practice and with the physical, health and environment hazard of chemical as specified in Part 2 of the Industry Code of Practice. 4,500.00
MARUWA (MALAYSIA) SDN BHD 2019-03-21 Manufacturing Magistrate Court Ayer Keroh Melaka Reg. 5(1), OSH (CLASS) Regulations 2013, OSHA1994. Failure to record the classification of chemicals. 4,500.00
MARUWA (MALAYSIA) SDN BHD 2019-03-21 Manufacturing Magistrate Court Ayer Keroh Melaka Reg. 14(2), OSH (CLASS) Regulations 2013, OSHA1994. Failure to submit the inventory of hazardous chemical for each calender year to the Director General not later than 31 March of the following year. 4,500.00
ZHONGHE HUAXING DEVELOPMENT (M) SDN BHD 2019-03-21 Construction Sessions Court Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work on high slope of the ditch is done safely. RM40,000
ZHONGHE HUAXING DEVELOPMENT (M) SDN BHD 2019-03-21 Construction Sessions Court Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work on high slope of the ditch is done safely. RM40,000
MENAWAN WOOD SDN BHD 2019-03-18 Manufacturing Sessions Court Bintulu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedures (SOP) for the operational shovel resulting in fatal accident to employee. 40,000.00
MENAWAN WOOD SDN BHD 2019-03-18 Manufacturing Sessions Court Bintulu Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickly means available within 7 days. 5,000.00
SAKURA FERROALLOYS SDN BHD 2019-03-18 Manufacturing Sessions Court Bintulu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedures (SOP) for GCP cleaning activities resulting in fatal accident. 10,000.00
HARBOUR SERVICES COPERATION SDN BHD 2019-03-18 Business Services Sessions Court Bintulu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing a safe walkway at workplace resulting in fatal accident to employee. 40,000.00
WAWASAN SEDAR SDN BHD 2019-03-18 Manufacturing Sessions Court Bintulu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedures (SOP) for sterillizer activities resulting in fatal accident to employee. 40,000.00
HCE (M) SDN BHD 2019-03-18 Construction Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by properly install the ladder on the jacking cage platform for tower crane installation. 30,000.00
KILANG KELAPA SAWIT LEKIR SDN BHD 2019-03-18 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing proper Safe Operating Procedures (SOP) to open chute digester door resulting in accident to employee. 30,000.00
Gold Coin Feedmill (Sabah) Sdn Bhd 2019-03-18 Manufacturing Sessions Court Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premise. RM3,000
Gold Coin Feedmill (Sabah) Sdn Bhd 2019-03-18 Manufacturing Sessions Court Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premise. RM3,000
Tenaga Nasional Berhad 2019-03-15 Electricity Utilities Magistrate Court Criminal 8 Reg.7(1), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify accident and dangerous occurence to the nearest DOSH by the quickly means available within 7 day. 8,000.00
Tenaga Nasional Berhad 2019-03-15 Electricity Utilities Magistrate Court Criminal 8 Reg.7(1), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify accident and dangerous occurence to the nearest DOSH by the quickly means available within 7 day. 8,000.00
Tenaga Nasional Berhad 2019-03-15 Electricity Utilities Magistrate Court Criminal 8 Reg.7(1), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify accident and dangerous occurence to the nearest DOSH by the quickly means available within 7 day. 8,000.00
VESTECH ENGINEERING SDN BHD 2019-03-13 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedures (SOP) resulting in accident to employee. 10,000.00
TAN KOK MENG 2019-03-12 Construction Sessions Court Ayer Keroh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedures (SOP) for construction of a alkaline acid chemicals pool resulting in fatal accident to employee. 2,500.00
MODELTECH SDN BHD 2019-03-11 Manufacturing Sessions Court Ayer Keroh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedures (SOP) at working at height activities resulting in fatal accident to employee. 20,000.00
RETUS PLANTATION SN BHD 2019-03-07 Manufacturing Sessions Court Sibu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing secure machine guarding resulting in accident to employee. 20,000.00
VICTORY PELITA KAABAH SDN BHD 2019-03-07 Agriculture Sessions Court Sibu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work to provide road barrrier on each side of the steep slope for the lorry route resulting in fatal accident to employee. 20,000.00
Seni Kenanga Sdn Bhd 2019-03-06 Construction Sessions Court Criminal 12 Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. 6,000.00
Infra Segi Sdn Bhd 2019-03-06 Construction Sessions Court Criminal 12 Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickly means available within 7 days. 3,000.00
LEAN TECH SDN BHD 2019-03-04 Construction Magistrate Court Samarahan Section 10(e), FMA 1967. Failure to ensure that the hole is close or firmly fenced to prevent the occurrence of the person falling. 5,000.00
GEOSPEC ENGINEERING SDN BHD 2019-02-28 Construction Sessions Court Kuching Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work of employee by providing Safe Operating Procedures (SOP) for the hammer rod connecting on the micropiling machine resulting in accident to employee. 20,000.00
Nuhaf enterprise 2019-02-25 Construction Sessions Court Criminal 12 Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work to ensure the temporary work platforms connected to the mast climbing platform are firmly fixed resulting in fatal accident to employee. 10,000.00
EAST COAST MANUFACTURING SDN BHD 2019-02-21 Manufacturing Sessions Court Kuantan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safety control measure to prevent workers from touching dangerous machinery parts resulting in fatal accident to employee. 12,000.00
QUANTUM STRIVE SDN. BHD. (1157885-U) 2019-02-19 Business Services Magistrate Court Kota Kinabalu Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to DOSH. 4,000.00
LING KAM LAN (720301-12-5380) 2019-02-19 Business Services Magistrate Court Kota Kinabalu Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to DOSH. 5,000.00
HL Rubber Industries Sdn Bhd 2019-02-13 Manufacturing Sessions Court Kuala Pilah Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing secure machine guarding. 10,000.00
Seremban Furniture Ind. Sdn Bhd 2019-02-13 Manufacturing Magistrate Court Seremban Reg. 17(1)(b), OSH (USECHH) Regulations 2000, OSHA1994. Failure to ensure engineering control equipment examined and tested for its effectiveness by a hygiene technician at appropriate intervals, each interval being no longer than twelve months. 2,000.00
ELONG CONSTRUCTION SDN BHD 2019-02-10 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe transportation. RM18,000
ELONG CONSTRUCTION SDN BHD 2019-02-10 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe transportation. RM18,000
WHC Construction Sdn Bhd 2019-02-07 Construction Magistrate Court Butterworth Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. 3,000.00
Evergreen Fibreboard (Nilai) Sdn Bhd 2019-01-31 Manufacturing Sessions Court Seremban Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. 20,000.00
GD CAPITAL HOLDINGS SDN. BHD. (508107-V) 2019-01-30 Construction Magistrate Court (5) Petaling Jaya Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. 2,000.00
SOTHISCON SDN. BHD. (1113646-D) 2019-01-30 Construction Sessions Court Kota Kinabalu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing working platform resulting in fatal accident. 15,000.00
ALAM KOTAMAS SDN. BHD. (687530-P) 2019-01-30 Construction Sessions Court Kota Kinabalu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing working platform resulting in fatal accident. 15,000.00
TERUSAN BARU SDN BHD 2019-01-30 Agriculture Magistrate Court Kota Kinabalu Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM4,000
TERUSAN BARU SDN BHD 2019-01-30 Agriculture Magistrate Court Kota Kinabalu Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. RM4,000
KUNTUM KENCANA SDN BHD (No Syarikat : 1177539-D) 2019-01-29 Construction Sessions Court (2) Ampang Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. 18,000.00
Armcon Engineering Sdn Bhd 2019-01-29 Manufacturing Magistrate Court Ipoh Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes bodily injury, which prevents the person from following his normal occupation for more than four (4) calender days. 3000
IJM CONSTRUCTION SDN. BHD. (195650-H) 2019-01-28 Construction Sessions Court (4) Klang Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. 50,000.00
PECK CHEW PILING (M) SDN. BHD. (672065-K) 2019-01-28 Construction Sessions Court (4) Klang Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. 50,000.00
INGRAND SDN. BHD. (290754-A) 2019-01-25 Construction Sessions Court Kajang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work in accordance with design drawings for the falsework installation resulting in the collapse of the falsework and accident to victim. 10,000.00
KUAN BOON CHYE BACKHOE SERVICE 2019-01-23 Construction Magistrate Court Balik Pulau Reg. 5(1)(a)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify accident to the nearest DOSH office by the quickly means available within 7 days. 3,000.00
PAMIR DEVELOPMENT SDN BHD 2019-01-17 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP). RM14,000
PAMIR DEVELOPMENT SDN BHD 2019-01-17 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing Safe Operating Procedure (SOP). RM14,000
LT Link Technology Aluminium Sdn Bhd 2019-01-16 Manufacturing Magistrate Court Ipoh Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. 3000
Micromac Engineering And Trading Sdn Bhd 2019-01-11 Manufacturing Magistrate Court Criminal 8 Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct risk assessment created by hazardous chemical to the health of the employee. 3,500.00
PEMBINAAN IKHASAS- MERAK SDN BHD (No. Syarikat: 398778-H) 2019-01-11 Construction Sessions Court Kajang Section 49(1), OSHA 1994. Failure to comply with notice issued. 10,000.00
YP PLANTATION HOLDINGS SDN BHD 2019-01-08 Agriculture Sessions Court Kuantan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing tractor training courses. 10,000.00
Sin Harp Enterprise Sdn Bhd 2019-01-08 Manufacturing Magistrate Court Ipoh Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. 3500
Rong Hua Shoe Ind Sdn Bhd 2019-01-08 Manufacturing Magistrate Court Ipoh Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. 3500
Kin Heng Timber Industries Sdn. Bhd. 2019-01-08 Manufacturing Magistrate Court Ipoh Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes bodily injury, which prevents the person from following his normal occupation for more than four (4) calender days. 2500
Yi Dah Xing Food Factory (M) Sdn. Bhd. 2019-01-08 Manufacturing Magistrate Court Ipoh Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. 2500
KILANG KELAPA SAWIT BUKIT PASIR SDN BHD 2019-01-08 Manufacturing Sessions Court Section 18, OSHA 1994. Failure to ensure, an occupier of a place of work to person other than his employees is safe and without risks to health. RM10,000
KILANG KELAPA SAWIT BUKIT PASIR SDN BHD 2019-01-08 Manufacturing Sessions Court Section 18, OSHA 1994. Failure to ensure, an occupier of a place of work to person other than his employees is safe and without risks to health. RM10,000
MSHK Engineering Sdn. Bhd. 2019-01-04 Manufacturing Magistrate Court Batu Gajah Reg. 28(1) - OSH (USECHH) Regulations 2000, OSHA 1994. Failure to remove him from any work that expose him to chemicals hazardous (manganese) to health ocasion that the medical opinion expressed by an Occupational Health Doctor (OHD). 4500
PEMBINAAN BINA BUMI SDN. BHD. (No. Syarikat: 854736-K)? 2019-01-03 Construction Sessions Court Criminal (2) Selayang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe working floor for working at height activities. 30,000.00
Chip Bee Steel Sdn. Bhd. 2019-01-02 Manufacturing Magistrate Court Ipoh Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. 3000
Chip Bee Steel Sdn. Bhd. 2019-01-02 Manufacturing Magistrate Court Ipoh Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to the DOSH about accident or dangerous occurrences which causes serious bodily injury as specified in First Schedule, which prevents the person from following his normal occupation for more than four (4) calender days. 3000
CMNM Mining Group Sdn Bhd 2019-01-01 Manufacturing Sessions Court Pasir Mas Section 10(C), FMA 1967. Failure to provide safe working platform. 6,000.00
Swee Hoe Brick Works Sdn Bhd 2018-12-26 Manufacturing Sessions Court Kota Bharu Section 19(1), FMA 1967. Handling machinery without a valid certificate of fitness RM1,500
Fero Maltech Industries Sdn Bhd 2018-12-26 Manufacturing Sessions Court Kota Bharu Section 19(1), FMA 1967. Handling machinery without a valid certificate of fitness RM1,500
Hartalega NGC Sdn Bhd (984586 ? P), 2018-12-20 Manufacturing Sessions Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure which is failure to supervise during the works of sampling of clorine mixture. RM40,000
BRIDGEX SDN. BHD. (260833-A) 2018-12-20 Construction Sessions Section 17(1), OSHA 1994. Failure to provide means to prevent other person not being his employees from going into premis. RM30,000
AXVENTURE SDN. BHD. (798020-T) 2018-12-20 Construction Magistrate Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM3,000
SRI BINARAYA SDN. BHD. (56384-V) 2018-12-19 Construction Sessions Section 19(1), FMA 1967. Failure to handle cranes with a valid certificate of fitness. RM50,000
SQA BUILDERS SDN. BHD. (455815-D) 2018-12-19 Construction Sessions Section 19(1), FMA 1967. Failure to handle cranes with a valid certificate of fitness. RM20,000
INFRA SEGI SDN. BHD. (351111-W) 2018-12-17 Construction Sessions Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify accident and dangerous occurence to the nearest DOSH office within 7 days. RM3,000
GLOBALCON HOLDING (M) SDN. BHD. (853165-K) 2018-12-13 Construction Magistrate Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM2,500
CONTINENTAL RESOURCES SDN. BHD. (173543-U) 2018-12-12 Transportation Sessions Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickly means available within 7 days. RM8,000
BUMIRAYA SETIA SDN BHD 2018-12-11 Construction Sessions Court Kluang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work on cutter head removal process works. RM12,000
BUMIRAYA SETIA SDN BHD 2018-12-11 Construction Sessions Court Kluang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work on cutter head removal process works. RM12,000
EMPEROR?S KITCHEN SDN BHD (700643 - U) 2018-12-07 Manufacturing Sessions Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work of employee by providing safe operating procedures at cooking room. RM30,000
EMPEROR?S KITCHEN SDN BHD (700643 - U) 2018-12-07 Manufacturing Sessions Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickly means available within 7 days. RM5,000
EMPEROR?S KITCHEN SDN BHD (700643 - U) 2018-12-07 Manufacturing Sessions Reg. 9, OSH (NADOPOD) Regulations 2004, OSHA 1994. Interface at accident or dangerous occurance scene. RM5,000
Syarikat Peladang dan Perusahaan Minyak Sdn. Bhd. 2018-12-07 Manufacturing Sessions Court Teluk Intan Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare of employee at work by providing safe operating procedure for fencing of nut cracker machine. RM10,000
TECK GUAN STEEL SDN. BHD. 2018-12-03 Manufacturing Sessions Court Kota Kinabalu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work of employee by providing safe operating procedures for conducting welding machine. RM20,000
Tulangis Sdn. Bhd. 2018-11-29 Construction Magistrate Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM4,000
PEW Industry Sdn Bhd 2018-11-28 Manufacturing Magistrate Court Kuala Kangsar Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days. RM3,000
PEW Industry Sdn Bhd 2018-11-28 Manufacturing Magistrate Court Kuala Kangsar Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days. RM2,000
Hoong Cheong Timber 2018-11-28 Manufacturing Sessions Court Gua Musang Section 17(1), OSHA 1994. Failure to provide means to prevent other than employees from going into premis. RM10,000
Bina Maju Sdn. Bhd. 2018-11-28 Construction Magistrate Reg. 16(7), Factory and Machinery (BOWEC)(Safety) Regulations 1986, FMA 1967. Failure to manage electrical wirings safetly. RM2,000
MOEM HOLDINGS SDN. BHD. (17369-K) 2018-11-27 Manufacturing Sessions Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work of employee bt providing safe operating procedures for bending machine adjustment. RM40,000
Ehsan Bina Sdn. Bhd. 2018-11-23 Construction Magistrate Court Batu Gajah Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM4,000
Ipoh Diamond Piling Sdn. Bhd. 2018-11-22 Construction Magistrate Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work resulting in the fatality of employee. RM30,000
Asiatic Plastic Packaging Industries Sdn. Bhd. 2018-11-22 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work resulting in the accident of employee. RM25,000
Kelington Technologies Sdn. Bhd. 2018-11-22 Construction Magistrate Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM3,200
G.C. Timur Sdn. Bhd. 2018-11-22 Construction Magistrate Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM3,200
G-Shank Enterprise (M) Sdn Bhd 2018-11-21 Manufacturing Magistrate Court Balik Pulau Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM2,000
Yew Lean Foundry & Co Sdn Bhd 2018-11-21 Manufacturing Magistrate Court Bukit Mertajam Reg. 10(3), OSH (NADOPOD), Regulations 2004, OSHA 1994. Failure to send extract of JKKP 8 report to Director General before 31 January of each year. RM4,500
IKHMAS JAYA SDN. BHD 2018-11-16 Construction Sessions Section 49(1), OSHA 1994. Failure to comply with notice issued. RM45,000
Oro Safety Glass Sdn. Bhd. 2018-11-15 Manufacturing Magistrate Reg. 8(2), Factory and Machinery (Noise Exposure) Regulations 1989, FMA 1967. Failure to conduct initial noise employee exposure monitoring. RM1,000
Central Aluminium Manufactory Sdn. Bhd. 2018-11-14 Manufacturing Magistrate Court Teluk Intan Reg. 34(5)(a), Factory and Machinery (Fencing of Machinery and Safety) Regulations 1970, FMA 1967. Failure to fence hand fed power press machines. RM1,000
Kilang Bot Kok Wai 2018-11-14 Manufacturing Magistrate Court Teluk Intan Reg. 5(3), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify accident within 7 days to the nearest DOSH by the quickest means availablery which causes death within one month of the date of that accident. RM2,000
KAYANGAN JITU TEGUH SDN BHD (408066-W) 2018-11-14 Construction Sessions Section 49(1), OSHA 1994. Failure to comply with notice issued. RM30,000
Premium Flame Sdn Bhd 2018-11-14 Construction Magistrate Court Balik Pulau Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report to the nearest DOSH office within 7 days. RM6,000
ZHANG AGRICULTURE DEVELOPMENT (SABAH) SDN BHD 2018-11-13 Agriculture Magistrate Court Kota Kinabalu Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to DOSH. RM4,500
Hen Ye Recycle Industry Sdn. Bhd. 2018-11-13 Manufacturing Magistrate Reg. 8(2), Factory and Machinery (Noise Exposure) Regulations 1989, FMA 1967. Failure to conduct initial noise employee exposure monitoring. RM1,000
KAYANGAN JITU TEGUH SDN BHD (408066-W) 2018-11-13 Construction Sessions Section 49(1), OSHA 1994. Failure to comply with notice issued. RM33,000
LMC ENGINEERING SDN BHD 2018-11-12 Manufacturing Sessions Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work of employee by providing safe operating procedures for extraction aluminium fin. RM45,000
ALFORM SYSYTEM SDN BHD 2018-11-12 Manufacturing Sessions Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work of employee to provide safe operating procedures for installing aluminium mole. RM30,000
KILANG MAKANAN MAMEE SDN. BHD. (51103-K) 2018-11-07 Manufacturing Magistrate Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickly means available within 7 days. RM3,000
Mentari Utara Sdn. Bhd. 2018-11-02 Construction Magistrate Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work resulting in the fatality of employee. RM5,000
Lim Chin Joo Sawmill 2018-11-02 Manufacturing Sessions Court Butterworth Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work of employee by providing safe operating procedures for wood cutting. RM8,000
GOLDEN PHAROS GLASS SDN BHD (265409-W) 2018-11-01 Manufacturing Magistrate Reg. 5(1)(a)(aa), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to notify death to the nearest DOSH office by the quickly means available within 7 days. RM1,500
ALS TECHNICHEM (MALAYSIA) SDN. BHD. (117964-P) 2018-11-01 Business Services Magistrate Reg. 17(1)(b), OSH (USECHH) Regulations 2000, OSHA1994. Failure to ensure engineering control equipment examined and tested for its effectiveness by a hygiene technician at appropriate intervals, each interval being no longer than twelve months. RM5,500
Nova Loyal Construction Sdn Bhd 2018-10-31 Construction Sessions Section 10(e), FMA 1967. Failure to securely cover and fence opening in a working level so as to prevent risk of persons falling. RM5,000
Tulangis Maju Sdn. Bhd. 2018-10-29 Construction Magistrate Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM3,000
Asas Bina Enterprise Sdn. Bhd. 2018-10-25 Construction Magistrate Court Manjung Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM1,500
MJC Precision (M) Sdn. Bhd. 2018-10-24 Manufacturing Sessions Section 49(1), OSHA 1994. Failure to comply with notice issued. RM30,000
Nibong Tebal Personal Care Sdn. Bhd. 2018-10-22 Manufacturing Magistrate Court Parit Buntar Reg. 17(1)(b), OSH (USECHH) Regulations 2000, OSHA1994. Failure to ensure engineering control equipment be examined and tested for its effectiveness by a hygiene technician at appropriate intervals, each interval being no longer than twelve months. RM5,000
WALSIN PRECISION TECHNOLOGY SDN BHD 2018-10-22 Manufacturing Sessions Court 3 Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work of employee by providing safe automatic stopper system for slitting machine. RM20,000
F.W. Furniture Industries Sdn. Bhd. 2018-10-19 Manufacturing Magistrate Court Batu Gajah Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to DOSH. RM2,500
Watanabe Metal Industries Sdn. Bhd. 2018-10-19 Manufacturing Magistrate Court Batu Gajah Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days. RM3,000
Fonco Engineering CorporationSdn. Bhd. 2018-10-19 Manufacturing Magistrate Court Batu Gajah Reg. 9(1), OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct Chemical Hazardous Risk Assessment (CHRA) RM3,500
T.J Pottery Sdn Bhd 2018-10-18 Manufacturing Magistrate Court Ipoh Reg.21(1), OSH (Safety and Health Committee) Regulations 1996, OSHA 1994. Failure to conduct Safety Health Committee meeting not less than once in three months. RM1,500
T.J Pottery Sdn Bhd 2018-10-18 Manufacturing Magistrate Court Ipoh Reg. 26(1) OSH (USECHH) Regulations 2000, OSHA 1994. Failure to conduct chemical exposure monitoring. RM3,500
GALAXY STONE GALLERY SDN BHD 2018-10-18 Manufacturing Sessions Court 3 Ayer Keroh Melaka Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work of employee by providing safe working procedures for the extraction of marbles from containers. RM20,000
Rik Construction Sdn. Bhd. 2018-10-18 Construction Sessions Section 49(1), OSHA 1994. Failure to comply with notice issued. RM15,000
Rik Construction Sdn. Bhd. 2018-10-18 Construction Sessions Reg. 10(2), Factory and Machinery (BOWEC)(Safety) Regulations 1986, FMA 1967. Failure to provide adequate overhead protective cover for persons entering or leaving the building. RM1,000
Rik Construction Sdn. Bhd. 2018-10-18 Construction Sessions Reg. 12, Factory and Machinery (SHW) Regulations 1970, FMA 1967. Failure to ensure safety of employees to use PPE for working at height. RM500
Arena Kerjaya Sdn. Bhd. 2018-10-17 Construction Magistrate Section 29(2), OSHA 1994. Failure to employ Safety and Health Officer. RM1,500
Ripcol Industries Sdn Bhd 2018-10-16 Manufacturing Magistrate Court Ipoh Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to DOSH. RM2,000
Hume Roofing Products Sdn. Bhd. 2018-10-16 Manufacturing Magistrate Court Ipoh Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days. RM3,500
Wai How Enterprise Sdn. Bhd. 2018-10-16 Construction Magistrate Court Ipoh Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days. RM4,500
IOI Achidchem Sdn Bhd 2018-10-12 Manufacturing Magistrate Court Bukit Mertajam Section 15(1), OSHA 1994. Failure to provide safe operating procedure for removing soap from screw feeder. RM6,000.00
Tazel Global Sdn Bhd 2018-10-10 Contruction Magistrate Court Criminal 8 Regulation 12, Factories And Machinery (Building Operations and Works of Engineering Construction) (Safety) Regulations 1986, FMA 1967. Failure to provide a belt for more than ten feet of work. RM2,000.00
Tazel Global Sdn Bhd 2018-10-10 Contruction Magistrate Court Criminal 8 Regulation 74(1), Factories And Machinery (Building Operations and Works of Engineering Construction) (Safety) Regulations 1986, FMA 1967. Failure to ensure erection of scaffold under the direct supervision of a designated person. RM1,000.00
Q-Fit Sdn. Bhd. 2018-10-10 Manufacturing Magistrate Court Ipoh Reg. 5(2), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days to DOSH. RM3,000
Soon Fatt Timber Sdn Bhd 2018-10-10 Manufacturing Magistrate Court Kuala Krai Reg. 5(1)(b)(bb), OSH (NADOPOD) Regulations 2004, OSHA 1994. Failure to send accident report within 7 days. RM8,000
GCH RETAIL (MALAYSIA) SDN BHD 2018-10-09 Retail Trade Magistrate Court Kota Kinabalu Regulation 5(2), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Occupational Safety and Health Act 1994. Failure to notify accident to DOSH . RM8,000.00
New World Construction Sdn. Bhd 2018-10-08 Agriculture Sessions Court Section 17(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety of other people by providing safe operating procedure of road construction activity. RM30,000.00
Uniplaster Industries Sdn. Bhd. 2018-10-08 Manufacturing Magistrate Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work of employee by installing secure guarding at rotary machine parts. RM15,000
MINTYE INDUSTRIES SDN BHD 2018-10-05 Manufacturing Magistrate Court Ayer Keroh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety and health at work of employee by providing safe working procedure of repairing roof activity while working at height. RM10,000.00
YEONG CHAUR SHING PAPER MILL SDN BHD 2018-10-05 Manufacturing Magistrate Court Ayer Keroh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety and health at work of employee by installing guarding at rotary machine parts. RM8,000.00
FETTA AUTO PART INDUSTRIES SDN BHD 2018-10-05 Manufacturing Magistrate Court Ayer Keroh Section 29(2)3g, Occupational Safety and Health (OSHA 1994) read with order 1997. Failure to employ Safety and Health Officer. RM1,000.00
RUBBER TIMBER MELAKA 2018-10-05 Manufacturing Magistrate Court Ayer Keroh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety and health information and training for handling double side planer machine. RM8,000.00
Dongwha Malaysia Sdn. Bhd. 2018-10-03 Manufacturing Sessions Court Section 15(1). OSHA 1994. Failure to provide safe operating procedure for switch board cleaning activities resulting in accident to contractor employees RM30,000.00
TI Metal Forgings Sdn. Bhd. 2018-10-02 Manufacturing Magistrate Court Ipoh Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994. Failure to notify accident within 7 days. RM4,000.00
Asiatic Plastic Packaging Industries Sdn. Bhd. 2018-10-02 Manufacturing Magistrate Court Ipoh Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994. Failure to notify accident within 7 days. RM3,000.00
Foo Wan Marketing Sdn. Bhd. 2018-10-02 Manufacturing Magistrate Court Ipoh Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994. Failure to notify accident within 7 days. RM4,000.00
Wei Dat Steel Wire Sdn. Bhd. 2018-10-02 Manufacturing Magistrate Court Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994. Failure to notify accident within 7 days. RM4,000.00
Wei Dat Steel Wire Sdn. Bhd. 2018-10-02 Manufacturing Magistrate Court Ipoh Regulation 5(2), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994. Failure to notify accident within 7 days. RM4,000.00
TENG PILING & CONSTRUCTION 2018-09-28 Contruction Magistrate Court Ayer Keroh Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994.Failure to notify accident. RM4,000.00
XINYI ENERGY SMART (M) SDN BHD 2018-09-27 Manufacturing Magistrate Court Jasin Section 15(1). OSHA 1994. Failure to provide training for greasing work activity. RM6,000.00
Chong Ah Kow Pottery Sdn Bhd 2018-09-25 Manufacturing Sessions Court Ipoh Section 15(1). OSHA 1994. Failure to provide Hazard identification, risk accessment and risk control (HIRARC) for conveyor machine cleaning activities. RM20,000.00
Lhoist SPN 2018-09-25 Manufacturing Sessions Court Ipoh Section 15(1). OSHA 1994. Failure to provide safe operating procedure for hydrator machine cleaning work activities. RM25,000.00
Perusahaan Kosinar Sdn Bhd 2018-09-24 Manufacturing Sessions Court Kota Kinabalu Section 15(1). OSHA 1994.Failure to provide guarding for dangerous machinery. RM10,000.00
Alumtan Union Metal Sdn. Bhd. 2018-09-20 Manufacturing Magistrate Court Regulation 12 - Factrories and Machinery (Noise Exposure) Regulation 1989. FMA 1967. Failure to conduct additional noise monitoring. RM500.00
Alumtan Union Metal Sdn. Bhd. 2018-09-20 Manufacturing Magistrate Court Regulation 34 - Factrories and Machinery (Noise Exposure) Regulation 1989. FMA 1967. Failure to provide training and to ensure the participation of employess exposed to noise level at or above the action level. RM500.00
Tong Sheng Wood Sdn Bhd 2018-09-19 Manufacturing Sessions Court Pasir Mas Section 15(1). OSHA 1994. Failure to provide safe operating procedures for wood cutting. RM6,000.00
Tong Sheng Wood Sdn Bhd 2018-09-19 Manufacturing Sessions Court Pasir Mas Regulation 5(b)(bb), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994. Failure to notify accident within 7 days. RM3,000.00
BAR FORMULA SDN BHD 2018-09-13 Agriculture Sessions Court Section 15(1), OSHA 1994. Failure to ensure safety and health of employee. RM10,000.00
Pintaras Geotechnics Sdn Bhd 2018-09-04 Construction Magistrate Court 8 Regulation 134 - Factories and machinery (Building Operations and Works of Engineering Construction)(Safety) Regulations 1986- FMA 1967. Failure to ensure the ground is inspected by a designated person before the piling machine is placed. RM2,000.00
Pintaras Geotechnics Sdn Bhd 2018-09-04 Construction Magistrate Court 8 Regulation 118- Factories and machinery (Building Operations and Works of Engineering Construction)(Safety) Regulations 1986- FMA 1967. Failure to ensure piling machine is placed or operated in a safe manner to avoid danger to himself or to others in the workplace area. RM2,000.00
MM Hotels Sdn Bhd 2018-08-30 Hotel Magistrate Court Regulation 5(2), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994. Failure to send accident report in the approved form to DOSH within seven days. RM5,000.00
Karas Timbertech Engineering Sdn Bhd 2018-08-23 Manufacturing Magistrate Court Kuala Berang Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety and health at work of employee by providing safe working procedure for the selection and preparation of overhanged timber resulting in a permanent disability accident to the employee. RM3,000.00
Jyoto Work (M) Sdn. Bhd. 2018-08-19 Manufacturing Sessions Court Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994.Failure to notify permenant disability accident involving power press machine. RM8,000.00
Shiuh Sheng Technology Sdn. Bhd. 2018-08-19 Manufacturing Sessions Court Regulation 5(1)(b)(bb), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994. Failure to report immediately for accidents involves fingers while cutting cone speakers. RM4,000.00
U-Sonics Power Cone Sdn. Bhd. 2018-08-19 Manufacturing Sessions Regulation 5(1)(b)(bb), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994. Failure to report immediately for accidental fingers when lifting molding. RM4,000.00
Lypometal Sdn. Bhd. 2018-08-19 Manufacturing Sessions Court Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. OSHA 1994.Failure to notify permenant disability accident involving power press machine. RM8,000.00
UAC Berhad 2018-08-16 Manufacturing Sessions Court Ipoh Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the accident of employee. Failure to provide a safe working procedure for cleaning activities in the "Sheet Machine 1 - Machine cone tank" section. RM15,000.00
Tenaga Nasional Berhad 2018-08-15 Utilities - Electricity Sessions Court Kuala Terengganu Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety and health at work of employee by providing safe working procedure of repairing the damage electrical poles resulting in an accident of employee. RM10,000.00
Antah Schindler 2018-08-13 Business Trade Criminal Sessions Court 12 Section 15(1), OSHA 1994. Failure to update HIRARC for governor rope replacement work. RM15,000.00
Nippon Egalv Steel Sdn Bhd 2018-08-06 Manufacturing Sessions Court Bukit Mertajam Section 15 (1) Occupational Safety and Health Act 1994. Failure to provide Safe Work Procedures for roller-washing activities. RM15,000.00
Temperate Garden Produce Sdn Bhd 2018-08-06 Agriculture Sessions Court Kota Kinabalu Section15 (1) of the Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee during the operation of machinery operations. RM10,000.00
NVM Scaffold Sdn Bhd 2018-08-06 Construction Criminal Sessions Court 12 Section 15(1), OSHA 1994. Failure to ensure that the work platforms on the project site are safe to use resulting in a fatal accident. RM20,000.00
Miyao-Toki Sdn. Bhd. 2018-08-02 Manufacturing Sessions Court Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Occupational Safety and Health Act 1994. Failure to notify accident. RM2,000.00
Casa Hartamas Sdn. Bhd. 2018-08-02 Construction Magistrate Court Kuala Berang Section 29(2), Occupational Safety and Health (Safety and Health Officer) Regulations 1997. Failure to employ Safety and Health Officer. RM4,000.00
Feiti (M) Sdn. Bhd. 2018-07-23 Manufacturing Sessions Court Regulation 26 (1) - Occupational Safety and Health (Use and Standard of Exposure of Hazardous Chemicals to Health) 2000, Occupational Safety and Health Act 1994. Failure to conduct exposure monitoring to employees for chemicals. RM8,000.00
Feiti (M) Sdn. Bhd. 2018-07-23 Manufacturing Sessions Court Regulation 26 (1) - Occupational Safety and Health (Use and Standard of Exposure of Hazardous Chemicals to Health) 2000, Occupational Safety and Health Act 1994. Failure to send exposed employees with chemical for medical surveillance. RM8,000.00
Yanox Malaysia Sdn Bhd 2018-07-19 Manufacturing Magistrate Court Section 10 (e) Read together with Section 51 (2) of the Factories and Machinery Act 1967. Failure to ensure the platform is built safely. RM10,000.00
Keller Sdn Bhd 2018-07-18 Construction Sessions Court J12 Kuala Lumpur Section 15(1), Occupational Safety and Health Act 1994.Failure to comply with a safe working procedure related to the load test preparation work activity resulting in a dangerous incident involving the fall of mobile crane RM30,000.00
Eleplas Wood Technology Sdn Bhd 2018-07-18 Manufacturing Magistrate Court Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Occupational Safety and Health Act 1994.Failure to notify accident. RM2,000.00
Maxiwealth Holdings Sb 2018-07-17 Manufacturing Sessions Court Mukah Section 15 (1) of the Occupational Safety and Health Act 1994.Failure to provide a strong barrier on the floor hole of a platform at height of 3 meters resulting in death. RM25,000.00
Leisure Ventures Langkawi Sdn. Bhd. 2018-07-16 Hotel Sessions Court Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Occupational Safety and Health Act 1994.Failure to notify accident. RM3,000.00
LTH Enterprise Sdn Bhd 2018-07-16 Manufacturing Sessions Court Kota Samarahan Section 19 (1) of the Factories and Machinery Act 1967. Failure to handle cranes with a valid certificate of fitness. RM10,000.00
Pembinaan Daya Teknik Sdn Bhd 2018-07-09 Construction Sessions Court (2) Johor Bahru Section 15 (1), Occupational Safety and Health Act 1994. Failure to provide safe working procedures. RM12,000.00
C.C.L (M) Engineering Sdn Bhd 2018-07-09 Construction Sessions Court (2) Johor Bahru Section 15 (1), Occupational Safety and Health Act 1994. Failure to provide safe working procedures. RM11,000.00
Pgeo Edible Oils Sdn Bhd 2018-07-09 Construction Sessions Court (2) Johor Bahru Section 17 (1). Occupational Safety and Health Act 1994. Failure to perform supervision of roofing work. RM10,000.00
Gan Fatt Forklift Machinery Sdn Bhd 2018-07-09 Business Trade Sessions Court (2) Johor Bahru Section 15 (1). Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work. RM10,000.00
Malaysia Smelting Corporation Bhd. 2018-07-09 Manufacturing Magistrate Court Butterwort Rgulation 28 (1) Occupational Safety and Health Regulations (Use and Standard of Exposure of Chemicals Hazardous to Health) 2000, Occupational Safety and Health Act 1994. Failure to remove employee from the Furnace section who an exposed to harmful chemicals such as Arsenic as recommended by Occupational Health Doctor (OHD) . RM7,500.00
Resin Foam Industry Sdn Bhd 2018-07-09 Manufacturing Sessions Court Kota Kinabalu Section 49 (2) of the Occupational Safety and Health Act 1994. Failure to comply with the notice issued by DOSH. RM7,500.00
Resin Foam Industry Sdn Bhd 2018-07-06 Manufacturing Sessions Court Kota Kinabalu Regulation10 (b) of the Occupational Safety and Health Act 1994. Failure to review written assessments of the risks arising from Chemical Hazardous to Health after 5 years. RM8,000.00
Hoe Heng Engineering Sdn. Bhd. 2018-07-04 Manufacturing Sessions Court Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Occupational Safety and Health Act 1994.Failure to notify accident. RM5,000.00
Ann Joo Integrated Sdn Bhd 2018-07-02 Manufacturing Sessions Court Bukit Mertajam Occupational Safety and Health (Notification of Accident, Dangerous Occurrence, Occupational Poisoning and Occupational Disease) 2004, Occupational Safety and Health Act 1994. Failure to comply with instructions by removing and using lorry machinery at Pig Iron Loading Bay which was involved with a fatal accident RM8,000.00
Eurosaga Sdn Bhd 2018-06-28 Construction Magistrate Court Jenayah 8 Section 29(2), Occupational Safety and Health (Safety and Health Officer) Regulations 1997. Failure to employ Safety and Health Officer. RM2,000.00
Star Dream Informative 2018-06-27 Transport sessions Kuala Terengganu Section 15(1),Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee. . RM8,000.00
Sama Kenangan Sdn Bhd 2018-06-27 Construction Magistrate Court Section 15 (1), Occupational Safety and Health Act 1994. Failed to provide training related to forklift driving. RM5,000.00
Sunbay Resources Sdn. Bhd. 2018-06-26 Mining sessions Gua Musang Section 17(1),Occupational Safety and Health Act 1994. Failure to provide a safe working place resulting in the death of 2 sub contractors. RM10,000.00
Hwa Thye Mining Sdn. Bhd 2018-06-26 Mining sessions Gua Musang Section 15(1),Occupational Safety and Health Act 1994.failure to provide a safe working procedure for the maintenance work resulting in the death of 2 workers. RM10,000.00
OSJ Development Sdn. Bhd 2018-06-25 construction sessions Kemaman Section 35(1) Factory dan machinery Act 1967. Failure to deliver a written notice to the Inspoector in the prescribed form. RM10,000.00
OSJ Development Sdn. Bhd 2018-06-25 construction sessions Kemaman Section 35(1) Factory dan machinery Act 1967. Failure to deliver a written notice to the Inspoector in the prescribed form. RM10,000.00
MF Teknik Sdn. Bhd. 2018-06-25 construction sessions Kemaman Section 35(1) Factory dan machinery Act 1967. Failure to deliver a written notice to the Inspoector in the prescribed form. RM10,000.00
First Class Protocol Sdn. Bhd. 2018-06-25 Construction Sessions Court Jenayah 12 Section 49 (2) of the Occupational Safety and Health Act 1994. Failure to comply with the notice issued by DOSH. RM10,000.00
Pembinaan Jaya Zira Sdn. Bhd. 2018-06-07 construction magistrate Section 15(1), Occupational Safety and Health Act 1994. Failure to provide safe operating procedure to remove concrete mold and scaffolding activities resulting in an accident. RM5,000.00
Equator Engineering Sdn Bhd 2018-06-07 Storage Magistrate Court Regulation 5(1)(b)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Occupational Safety and Health Act 1994. Failure to notify accident. RM3,000.00
Pembinaan Jaya Zira Sdn. Bhd. 2018-06-07 Construction Magistrate Court Section 15(1), OSHA 1994. Failure to provide safe operating procedure, so far as is practicable, for work activity of removing concrete molds and scaffolding resulting in accident of employee. RM5,000.00
Sentienx Sdn. Bhd. 2018-06-06 Manufacturing sessions Section 29. Factory dan machinery Act 1967. Failure to employ certified boilerman. RM4,000.00
Ladang Muzwin 2018-06-05 Agriculture Magistrate Batu Gajah Reg.5(1)(a)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Failure to notify accident and dangerous occurence to the nearest DOSH office within 7 days. RM1,000.00
Suntech Precision Sdn. bhd. 2018-06-04 Manufacturing Sessions Bukit Mertajam Reg. 9(1), Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000. Failure to conduct Chemical Hazardous Risk Assessment (CHRA) RM5,000.00
Cymoo Plywood Sdn Bhd 2018-05-25 Manufacturing Sessions Court Section 10 (e) Read together with Section 51 (2) of the Factories and Machinery Act 1967. Failure to cover open pit. RM20,000.00
CERAH HARMONI SDN BHD 2018-05-21 construction sessions Section 49(1),Occupational Safety and Health Act 1994.Failure to comply with notice issued. RM15,000.00
HANSON INDUSTRIES SDN BHD 2018-05-21 Manufacturing Sesyen Section 15(1), Occupational Safety and Health Act 1994.Failure to conduct hazard identification risk assessment dan risk control. RM30,000.00
Taipan Focus Sdn Bhd 2018-05-18 Construction Sessions Court Petaling Jaya Section 49(1),Occupational Safety and Health Act 1994.Failure to comply with notice of prohibition notice issued to immediately discontinue unsafe working for the installation of molded plates without a secure working platform, unobstructed edges and no provision of personal protective equipment to employees which may cause fall injury RM25,000.00
Taipan Focus Sdn Bhd 2018-05-18 Construction Sessions Court Section 49 (2) of the Occupational Safety and Health Act 1994. Failure to comply with the notice issued by DOSH. RM25,000.00
Aik Joo Can Factory Sdn Bhd 2018-05-17 Manufacturing sessions Court Butterworth Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work causing loss of hearing. RM13,000.00
Aik Joo Can Factory Sdn Bhd 2018-05-17 Manufacturing sessions Court Butterworth Reg.7(1), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Failure to notify accident and dangerous occurence to the nearest DOSH by the quickest means available. RM2,000.00
Domain Resources Sdn Bhd 2018-05-16 construction sessions Court Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure safe pre concreating work resulting in a dangerous occurrence. RM40,000.00
Sapura Fabrication Sdn Bhd 2018-05-16 Manufacturing sessions Court Ipoh Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee. RM23,000.00
Muda Paper Converting Sdn. Bhd. 2018-05-16 Manufacturing Magistrate Court Jawi Section 15(1), Occupational Safety and Health Act 1994.Failure to provide machine guarding resulting accident of employee. RM8,000.00
TITAN RITZ SDN BHD 2018-05-15 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to provide supervision of plaster work. RM10,000.00
NKW CONSTRUCTION SDN BHD 2018-05-15 Construction Sessions Court (2) Johor Bahru Section 15(1),OSHA 1994. Failure to make necessary assessment for plaster plastering work at level 32. RM10,000.00
TITAN RITZ SDN BHD 2018-05-15 Construction Sessions Court (2) Johor Bahru Section 31(a), OSHA 1994. Failure to report accident. RM2,500.00
Dynaspan Furniture Sdn. Bhd. 2018-05-14 Manufacturing sessions Court Butterworth Section 15(1), Occupational Safety and Health Act 1994.Failure to provide machine guarding resulting accident of employee. RM10,000.00
Dynaspan Furniture Sdn. Bhd. 2018-05-14 Manufacturing sessions Court Butterworth Section 29(2), Occupational Safety and Health (Safety and Health Officer) Regulations 1997. Failure to employ Safety and Health Officer. RM3,000.00
Amphenol TCS Sdn Bhd 2018-05-14 Manufacturing Magistrate Court Bukit Mertajam Section 15(1), Occupational Safety and Health Act 1994. Failure to provide safe working procedures. RM8,000.00
IAV BUILDERS SDN BHD 2018-05-14 construction magistrate Reg.5(1)(a)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Failure to notify accident and dangerous occurence to the nearest DOSH office within 7 days. RM7,000.00
FELCRA URUS ESTATE SDN BHD 2018-05-11 Agriculture Magistrate Court Bentong Reg.5(1)(a)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Failure to notify accident and dangerous occurence to the nearest DOSH by the quickest means available. RM3,000.00
Ikhmas Jaya Sdn Bhd 2018-05-07 construction sessions Court Section 15(1), Occupational Safety and Health Act 1994. Failure to provide a safe working procedure for cranes handling resulting in a dangerous occurrence where a crane moved down the lifting of concrete barrels and almost excavates the operator in the area. RM25,000.00
Kreatiflex Construction Sdn Bhd 2018-05-07 construction sessions Court Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure safe pre concreating work resulting in a dangerous occurrence. RM30,000.00
Zubicon Construction Sdn. Bhd. 2018-05-04 construction Magistrate Court Georgetown Section 29(2), Occupational Safety and Health (Safety and Health Officer) Regulations 1997. Failure to employ Safety and Health Officer. RM3,500.00
Sungai Kerang Development Sdn Bhd 2018-05-03 Manufacturing sessions Court Ipoh Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure,so far as is practicable, the safety and health at work resulting in an accident of employee. RM10,000.00
DINATTY (MALAYSIA) SDN BHD 2018-04-30 transport sessions Court Butterworth Section 15(1), Occupational Safety and Health Act 1994.Failure to provide safe working procedures for forklift handling resulting accident of employee. RM10,000.00
SOUTHERN BUILDERS (J) SDN BHD 2018-04-30 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to provide safe access to and egress from the workplace. RM10,000.00
SF CONTRACTS SDN BHD 2018-04-30 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to hold supervision for casting work. RM10,000.00
INDUSTRIAL CONCRETE PRODUCTS SDN BHD 2018-04-30 Manufacturing Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to provide a safe work procedure. RM10,000.00
ARAMIJAYA SDN BHD 2018-04-30 Manufacturing Sessions Court (2) Johor Bahru Section 15(1), OSHA1994. Failure to provide safe plant RM8,000.00
CHINA CONSTRUCTION THIRD ENGINEERING GROUP SDN BHD 2018-04-30 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to supervise operation RM15,000.00
Malaysia Steel Works (Kl) Bhd 2018-04-24 Manufacturing Section 15 (1) of the Occupational Safety and Health Act 1994. Failure to provide safe working procedures for work with roller stand machine. RM10,000.00
TRI PACIFIC ENGINEERING SDN BHD 2018-04-23 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to provide safe working prosedur for panel installation work. RM12,000.00
WCT CONSTRUCTION SDN BHD 2018-04-23 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to provide supervision for panel installation work. RM10,000.00
MAJU METAL & IRON WORKS 2018-04-23 Manufacturing Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to maintain machinery. RM12,000.00
Matrix Excelcon Sdn Bhd 2018-04-20 Construction Sessions Court Section 10(c), OSHA 1994. Failure to provide secure passage. RM5,000.00
Sipro Plastic Industries Sdn. Bhd. 2018-04-19 Manufacturing Magistrate Court Reg.9(1), Factory and machinery (Noise Exposure) Regulations. Failure to conduct initial employee hearing monitoring. RM800.00
G-Pile System 2018-04-18 construction sessions Court Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fall of employee into the Pile Cap docking area. RM45,000.00
POWER BOOSTER ENGINEERING SDN BHD 2018-04-16 Facility - Gas sessions Court Butterworth Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in an accident of employee. RM10,000.00
Southern Cable Sdn. Bhd. 2018-04-15 Manufacturing sessions Court Section 15(1), Occupational Safety and Health Act 1994. Failure to provide HIRARC for bobbins lifting work. RM48,000.00
Southern Cable Sdn. Bhd. 2018-04-15 Manufacturing sessions Court Section 19(1), Factory and Machinery Act 1967. Failure to to have valid certificate for machinery handling . RM90,000.00
Jyoto Work (M) Sdn. Bhd. 2018-04-15 Manufacturing sessions Court Section 15(1), Occupational Safety and Health Act 1994.Failure to provide safe working procedures for working with machine Yoke 17. RM25,000.00
Jyoto Work (M) Sdn. Bhd. 2018-04-15 Manufacturing sessions Court Reg.5(1)(a)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Failure to notify accident and dangerous occurence to the nearest DOSH by the quickest means available. RM4,000.00
MYM Tok Pong Sdn Bhd 2018-04-15 Facility - Electric sessions Court Kuala Terengganu Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in an accident of employee. RM8,000.00
Nada Semaju 2018-04-13 construction sessions Court Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure that scaffolding is safe to use. RM5,000.00
Min Industries Sdn Bhd 2018-04-13 Manufacturing Sessions Court Section15 (1) of the Occupational Safety and Health Act 1994. Failure to perform Hazard Identification Risk Assessment and Risk Control (HIRARC) of machinery operation RM20,000.00
Shin Min Quarry Constructions 2018-04-13 Quarrying Sessions Court Section 15 (1) of the Occupational Safety and Health Act 1994. Failure to provide safe working procedures work activities of drilling holes to place explosives for quarry rock breaking. RM20,000.00
Eltramax Services Sdn Bhd 2018-04-13 Quarrying Sessions Court Section 17 (1) of the Occupational Safety and Health Act 1994. Failure to provide safe working procedures work activities of drilling holes to place explosives for quarry rock breaking. RM20,000.00
Pembinaan Kct Sdn Bhd 2018-04-13 Construction Sessions Court Section 49 (2) of the Occupational Safety and Health Act 1994. Failure to comply with the notice issued by DOSH. RM10,000.00
Packaging Centre Services Sdn Bhd 2018-04-12 Manufacturing Majistret Sek. 18 (1) (a) (b) - Occupational Safety and Health (Use and Standard of Exposure of Chemicals Hazardous to Health) 2000, Occupational Safety and Health Act 1994. Failure to ensure local exhaust ventilation equipment is designed according to design specifications and tested by professional engineers RM8,000.00
Flexi Components (Kedah) Sdn. Bhd. 2018-04-11 Manufacturing sessions Court Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure,so far as is practicable, the safety and health at work resulting in an accident of employee. RM30,000.00
Dingfeng Precision Technology Sdn. Bhd. 2018-04-11 Manufacturing sessions Court Section 15(1), Occupational Safety and Health Act 1994. Failure to provide safe working procedures for cleaning the roller of Mixing Mill Model L2-3. RM25,000.00
SHEN MAO SOLDER (M) SDN BHD 2018-04-10 Manufacturing Magistrate Court Reg. 5(1), Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000. Failure to ensure as a major supplier of chemicals to record the chemical classification of 'Lead Free Liquid Flux (SM815) as a hazardous chemical. RM7,000.00
SEOUL ELECTRONICS & TELECOMUNICATION (M) SDN BHD 2018-04-10 Manufacturing Magistrate Court Bukit Mertajam Reg. 5(1), Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000. Failure to conduct monitoring of hazardous chemicals ie: xylene, exposure to health. RM6,000.00
SEOUL ELECTRONICS & TELECOMUNICATION (M) SDN BHD 2018-04-10 Manufacturing Magistrate Court Bukit Mertajam Reg. 27(1), Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000. Failure to carry out health surveillance of workers exposed to chemicals that are harmful to health RM6,000.00
M&S Scaffolding 2018-04-10 Construction Sessions Court Section 15 (1) of the Occupational Safety and Health Act 1994. Failure to provide risk assessment for the installation of peripheral net on scaffolding. RM13,000.00
Z & L Construction & Trading 2018-04-10 Construction Sessions Court Sek. 15 of the Factory and Machinery Act 1967. Failure to arrange and maintain the means of entry into and out of it safely without risk to all employees resulting in death. RM37,000.00
Nissin Builders Sdn Bhd 2018-04-09 Construction Sessions Court Section 49 (2) of the Occupational Safety and Health Act 1994. Failure to comply with the notice issued by DOSH. RM20,000.00
Gs Paper And Packaging Sdn Bhd 2018-04-09 Manufacturing Sessions Court Section 17 (1) of the Occupational Safety and Health Act 1994. Failure to carry out supervision for the activity of patching and repairing a leaked roof resulting in fatality. RM35,000.00
Riverstone Resources Sdn Bhd 2018-04-05 Manufacturing Sessions Court The Occupational Safety and Health Regulations (Control of Industrial Accident Hazards Regulations) 1996, Occupational Safety and Health Act 1994. Failure to prepare and maintain an updated and adequate site emergency plan which details how to deal with major accidents on the site. RM35,000.00
Wct Berhad 2018-04-03 Construction Sessions Court Section 15 (1) of the Occupational Safety and Health Act 1994. Failure to provide risk assessment for the operation and use of piling machine at the construction site resulting in an accident. RM25,000.00
Fe Magnet Wire (Malaysia) Sdn Bhd 2018-04-03 Manufacturing Magistrate Court Regulation 26(1) Occupational Safety and Health (Use and Standard of Exposure of Hazardous Chemicals to Health) 2000, Occupational Safety and Health Act 1994. Failure to conduct chemical exposure monitoring. RM4,000.00
Nakagawa Rubber Industries Sdn Bhd 2018-04-02 Manufacturing Sessions Court Section 15 (1) of the Occupational Safety and Health Act 1994. Failure to provide safe working procedures for work activity of repairing rotating components in plastic rubber slicing machinery. RM20,000.00
Barcon Industries Sdn Bhd 2018-04-02 Construction Sessions Court Section 49 (2) of the Occupational Safety and Health Act 1994. Failure to comply with the notice issued by DOSH. RM15,000.00
Hab Construction Sdn Bhd 2018-04-02 Construction Sessions Court Section 19 (1) Factories And Machinery Act 1967. Failure to handles machinery with a valid certificate of fitness. RM12,000.00
Mal Profile Sdn Bhd 2018-04-02 Construction Sessions Court Section 49 (2) of the Occupational Safety and Health Act 1994. Failure to comply with the notice issued by DOSH. RM15,000.00
Ck Cheah Engineering Works Sdn Bhd 2018-04-02 Construction Sessions Court Section 49 (2) of the Occupational Safety and Health Act 1994. Failure to comply with the notice issued by DOSH. RM10,000.00
Pancaran Ilham Engineering Sdn Bhd 2018-03-28 Construction Magistrate Court Kuala Terengganu Regulation 74(1), Factories And Machinery (Building Operations and Works of Engineering Construction) (Safety) Regulations, FMA 1967. Failure to provide safe scaffolding installation measures as it was found that no maintenance was made and no periodic inspection of scaffolding. RM1,000.00
Jack In Pile (M) Sdn Bhd 2018-03-28 Construction Magistrate Court Kuala Terengganu Regulation 25(1), Factories And Machinery (Building Operations and Works of Engineering Construction) (Safety) Regulations, FMA 1967. Failure to appoint site safety supervisor. RM1,500.00
Egi Construction Sdn Bhd 2018-03-27 Business Trade Sessions Court Section 49 (2) of the Occupational Safety and Health Act 1994. Failure to comply with the notice issued by DOSH. RM35,000.00
LONGI (KUCHING) SDN BHD 2018-03-23 Manufacturing Sessions Court Kuching Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee. RM50,000.00
Thong Eik Masterbatch Industries (M) Sdn. Bhd. 2018-03-21 Manufacturing Magistrate Court Reg. 26(1), Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000. Failure to carry out health surveillance programme. RM2,000.00
Thong Eik Masterbatch Industries (M) Sdn. Bhd. 2018-03-21 Manufacturing Magistrate Court Reg. 26(1), Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000. Failure to carry out health surveillance programme. RM2,000.00
LONGI (KUCHING) SDN BHD 2018-03-19 Manufacturing Sessions Court Kuching Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee. RM25,000.00
JACK EDWARD JAUM (NO KPT: 520805-13-5551) 2018-03-19 Manufacturing Magistrate Court Kota Samarahan Section 24(1)(a), Occupational Safety and Health Act 1994. Failure as competence person of crane to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee. RM500.00
Besgrade Products Sdn. Bhd. 2018-03-15 Manufacturing Magistrate Court Section 29(2), Occupational Safety and Health (Safety and Health Officer) Regulations 1997. Failure to employ Safety and Health Officer. RM4,000.00
Domain Resources Sdn Bhd 2018-03-14 construction Magistrate Court 8 Reg.5(1)(a)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Failure to notify accident and dangerous occurence to the nearest DOSH by the quickest means available. RM5,000.00
Domain Resources Sdn Bhd 2018-03-14 construction Magistrate Court 8 Reg. 9, Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Interference at accident or dangerous occurrence scene. RM8,000.00
Syarikat Perusahaan Kelapa Sawit Sdn. Bhd. 2018-03-12 Manufacturing Sessions Court Batu Pahat Section 15(1), OSHA 1994. Failure to provide a safe work procedure. RM14,000.00
Mamee-Double Decker Distribution (M) Sdn. Bhd. 2018-03-12 Wholesale Trade Sessions Court Batu Pahat Section 15(1), OSHA 1994.Failure to provide training for moving of goods. RM8,000.00
SJ Classic Industries Sdn. Bhd. 2018-03-12 Manufacturing Sessions Batu Pahat Section 15(1), OSHA 1994. Failure to provide safe work procedure. RM10,000.00
Broadgate Engineering (M) Sdn. Bhd. 2018-03-09 construction Sessions Court Ipoh Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee. RM30,000.00
Soon Kitchen Equipment Sdn. Bhd. 2018-03-08 Retail Trade Sessions Segamat Section 15(1), OSHA 1994. Failure to ensure, so far as is practicable, the safety and health at work. RM15,000.00
Tower Regency Hotel & Apartments Sdn. Bhd. 2018-03-01 hotel Magistrate Court Reg.5(1)(a)(aa), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Failure to report accident within 7 days. RM1,000.00
Kuantan Port Consortium 2018-02-28 Storage Sessions Court Section 17(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work. RM18,000.00
Kuantan Port Consortium 2018-02-28 Storage Sessions Court Section 17 (1) OSHA 1994. Failure to ensure safety and health of non-employee at work. RM18,000.00
Kilang Sawit Muar Bhd 2018-02-21 Manufacturing Sessions Court Muar Section 15(1), OSHA 1994. Failure to provide a safe work procedure. RM20,000.00
HK GUA MUSANG SDN BHD 2018-02-20 Manufacturing Sessions Court Gua Musang Section 15(1), OSHA 1994. Failure to provide safe plant RM5,000.00
Shorubber (M) Sdn. Bhd. 2018-02-14 Manufacturing Magistrate Court Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee. RM10,000.00
Shorubber (M) Sdn. Bhd. 2018-02-14 Manufacturing Magistrate Court Section 15(1), OSHA 1994. Failure to provide safe operating procedure, so far as is practicable, for LPG tank dismentling work activity resulting in the accident of employee. RM10,000.00
Jala Emas Development 2018-02-14 Construction Magistrate Court Dungun Section 35(1) FMA 1967. Failure to submit to the Inspector a written notice in the prescribed form within not more than seven days from the commencement of the construction operation. RM2,500.00
Sungei Kahang Palm Oil Mill Sdn. Bhd. 2018-02-13 Manufacturing Sessions Kluang Section 15(1), OSHA 1994. Failure to provide safe work procedure. RM18,000.00
KILANG SAWIT MALPOM INDUSTRIES BHD 2018-02-07 Manufacturing Magistrate Court, Jawi Reg. 27(1), Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000. Failure to carry out health surveillance programme. RM5,000.00
KILANG SAWIT MALPOM INDUSTRIES BHD 2018-02-07 Manufacturing Magistrate Court Jawi Reg. 27(1), Occupational Safety and Health (Use and Standards of Exposure of Chemicals Hazardous to Health) Regulations 2000. Failure to prove in writing that health surveillance records are maintained. RM5,000.00
Syarikat Bernas 2018-02-06 Storage Sessions Court Reg. 10,Occupational Safety and Health (Control of Industrial major Accident Hazards) Regulations 1996. Failure to provide safe operating documents. RM20,000.00
Allied Precision Manufacturing (M) Sdn. Bhd. 2018-02-06 Manufacturing Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to maintain sensor receiver. RM6,000.00
Konsortium Ipmines Merz Sdn. Bhd. 2018-02-06 Construction Sessions Court (2) Johor Bahru Section 15(1),OSHA 1994. Failure to make necessary assessment for dismantling work platforms RM20,000.00
Bumi Hijau Food Industries Sdn Bhd 2018-02-06 Manufacturing Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to provide a Safe Work Procedure. RM10,000.00
Apollo Food Industries (M) Sdn. Bhd. 2018-02-06 Manufacturing Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to provide a Safe Work Procedure. RM10,000.00
Boon & Cheah Stell Pipes Sdn. Bhd. 2018-02-06 Manufacturing Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure to provide a safe work procedure. RM15,000.00
Santarli Sdn Bhd 2018-02-05 Construction Sessions Court (2) Johor Bahru Section 15(1), OSHA 1994. Failure supervise the workplace. RM15,000.00
Kiswire Cord Sdn Bhd 2018-02-05 Manufacturing Sessions Court (2) Johor Bahru Section 10f(a), OSHA 1994. Failure to ensure the boxes containing spools are stacked properly to prevents collapse in the storage space. RM15,000.00
SUNWAY IFM SDN BHD 2018-02-02 Manufacturing Sessions Court, Butterworth Reg. 7(1),Occupational Safety and Health (Control of Industrial major Accident Hazards) Regulations 1996. Failure to submit Notification of Industrial Activity Form. RM6,000.00
SUNWAY IFM SDN BHD 2018-02-02 Property sessions Court Butterworth Reg 7(1), Occupational Safey and Health (Control of Industrial Major Accident Hazards) Regulation 1996. Occupational Safety and Health Act 1994. Failure to submit JKKP 5 form. RM6,000.00
CDAH CONSTRUCTION SDN BHD 2018-02-01 Construction Sessions Court, Kota Bharu Section 15(1), Occupational Safety and Health Act 1994. Failure to provide safe operating procedures. RM5,000.00
CDAH CONSTRUCTION SDN BHD 2018-02-01 Construction Sessions Court Kota Bharu Section 15(1), OSHA 1994. Failure to provide a safe work procedure. RM5,000.00
Big Donutbaking 2018-01-26 Restaurant Magistrate Court 8 Reg.5(2), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Failure to report accident within 7 days. RM3,000.00
Big Donutbaking 2018-01-26 Restaurant Magistrate Court 8 Regulation 5 (2) - Occupational Safety and Health (Notification of Accident, Dangerous Occurrence, Occupational Poisoning And Occupational Disease) 2004. Occupational Safety and Health Act 1994. failure to send an accident report within 7 days to the Department of Occupational Safety and Health. RM3,000.00
HUHTAMAKI FOODSERVICES SDN BHD 2018-01-25 Manufacturing Sessions Court, Butterworth Section 15(1), Occupational Safety and Health Act 1994. Failure to provide safe operating procedures for froming cup machine. RM10,000.00
HUHTAMAKI FOODSERVICES SDN BHD 2018-01-25 Manufacturing sessions Court Butterworth Section 15(1), Occupational Safety and Health Act 1994.Failure to provide safe working procedures for handling of froming cup machine resulting accident of employee. RM10,000.00
Nei Yew Choi Trading 2018-01-24 Business Trade Magistrate Court 8 Reg.5(1)(a)(bb), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Failure to report accident within 7 days. RM6,000.00
Nei Yew Choi Trading 2018-01-24 Business Trade Magistrate Court 8 Regulation 5 (1) (a) (bb) - Occupational Safety and Health (Notification of Accident, Dangerous Occurrence, Occupational Poisoning And Occupational Disease) 2004. Occupational Safety and Health Act 1994. failure to send an accident report within 7 days to the Department of Occupational Safety and Health. RM6,000.00
Excellent Machinery & Auto Supplies (Senawang) Sdn Bhd 2018-01-19 Manufacturing Sessions Court Section 15(1), OSHA 1994. Failure to provide a safe work procedure. RM5,000.00
QL Poultry Farms 2018-01-19 Manufacturing Sessions Court Section 15(1), OSHA 1994. Failure to provide a Safe Work Procedure. RM10,000.00
Jejaka Timber Industries Sdn. Bhd. 2018-01-11 Manufacturing Magistrate Court, Grik Reg.5(1)(bb), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004. Failure to report accident within 7 days. RM500.00
TKN Calsium Industries (M) Sdn. Bhd. 2018-01-11 Manufacturing Magistrate Court, Batu Gajah Reg.21(1), Occupational Safety and Health (Occupational Safety and Health Committee) Regulations 1996. Failure to conduct SHC meeting once in three months. RM2,500.00
Loo Liong Tiam 2018-01-11 Manufacturing Magistrate Court Reg.9(1), Factory and machinery (Noise Exposure) Regulations. Failure to conduct initial employee exposure monitoring. RM400.00
Jejaka Timber Industries Sdn. Bhd. 2018-01-11 Manufacturing Magistrate Court Grik Regulation 5(1)(bb), Occupational Safety and Health (Notification of Accident, Dangerous Occurance, Occupational, Poisoning and Occupational Disease) Regulations 2004.Occupational Safety and Health Act 1994. Failure to notify accident. RM500.00
TKN Calsium Industries (M) Sdn. Bhd. 2018-01-11 Manufacturing Magistrate Court Batu Gajah Regulation 21 (1) - Occupational Safety and Health (Safety and Health Committee) Regulations 1996 Occupational Safety and Health Act 1994. Failure to carry out a meeting of the Safety and Health Committee within a fixed period of not less than 3 months. RM2,500.00
Loo Liong Tiam 2018-01-11 Manufacturing Magistrate Court Regulation 9(1), Factories and Machinery (Noise Exposure) Regulations. FMA 1967. Failure to conduct initial employee exposure noise monitoring. RM400.00
PETRONAS CARIGALI SDN. BHD. 2018-01-10 Manufacturing Sessions Court Kemaman Section 15(1), OSHA 1994. Failure to provide safe operating procedure, so far as is practicable, for work activity of grating removall and installation at the platform resulting in accident of employee. RM55,000.00
SYARIKAT SESCO BERHAD 2018-01-09 Facility - Electric Sessions Court, Sri Aman Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee. RM25,000.00
Syarikat Sesco Berhad 2018-01-09 Facility - Electric Sessions Court Sri Aman Section 15 (1) of the Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee. RM25,000.00
SAGEMAL TERAS SDN BHD 2018-01-08 Construction Magistrate Court, Jeli Section 15(1), Occupational Safety and Health Act 1994. Failure to provide safe operating procedures. RM8,000.00
SAGEMAL TERAS SDN BHD 2018-01-08 Construction Magistrate Court, Jeli Section 29(2), Occupational Safety and Health (Safety and Health Officer) Regulations 1997. Failure to employ Safety and Health Officer. RM4,000.00
WIJAYA DAYA SDN BHD 2018-01-08 Construction Sessions Court, Kota Kinabalu Section 49(2),Occupational Safety and Health Act 1994. Failure to comply with prohibition notice issued. RM15,000.00
METRO GLIDE SDN BHD 2018-01-08 Business Trade Sessions Court, Kuching Section 15(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety, health and welfare at work of employee. RM40,000.00
Wijaya Daya Sdn Bhd 2018-01-08 Construction Sessions Court Kota Kinabalu Section 49 (2) of the Occupational Safety and Health Act 1994. Failure to comply with the notice issued by DOSH. RM15,000.00
Metro Glide Sdn Bhd 2018-01-08 Business Trade Sessions Court Kuching Section 15 (1) of the Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee. RM40,000.00
SAGEMAL TERAS SDN BHD 2018-01-08 Construction Magistrate Court Jeli Section 15(1), OSHA 1994. Failure to provide personal protective equipment for employee. RM8,000.00
SAGEMAL TERAS SDN BHD 2018-01-08 Construction Magistrate Court Jeli Section 29(2), OSHA 1994, read together with Occupational Safety and Health (Safety and Health Officer) Regulations 1997. Failure to employ Safety and Health Officer. RM4,000.00
ZECON BHD 2018-01-04 Construction Sessions Court, Kuching Section 15(1), Occupational Safety and Health Act 1994. Fails to ensure, so far as is practicable, the safety, health at work. RM20,000.00
Zecon Bhd 2018-01-04 Construction Sessions Court Kuching Section 15 (1) of the Occupational Safety and Health Act 1994. Failure to ensure, so far as is practicable, the safety and health at work resulting in the fatality of employee. RM20,000.00
Langkasuka Point Sdn. Bhd. 2018-01-03 Construction Magistrate Court Reg. 24, Factory and machinery (Building Operations and work of engineering construction)(Safety) Regulations 1986. Failure to wear safety helmets. RM2,000.00
LINTASAN KORPORAT SDN BHD 2018-01-02 Construction Sessions Court, Kota Kinabalu Section 17(1), Occupational Safety and Health Act 1994. Failure to ensure, so far as ispracticable that person other employees from exposure to the risk of safety and health. RM40,000.00
OSCACOM SDN BHD 2018-01-02 Construction Sessions Court, Kota Kinabalu Section 15(1), Occupational Safety and Health Act 1994. Failure to provide information,instruction, training and safe operating procedures at work. RM25,000.00
Lintasan Korporat Sdn Bhd 2018-01-02 Construction Sessions Court Kota Kinabalu Section 17 (1) Occupational Safety and Health Act 1994. Failure to ensure safety and health of non-employee at work. RM40,000.00
Oscacom Sdn Bhd 2018-01-02 Construction Sessions Court Kota Kinabalu Section 15 (1) of the Occupational Safety and Health Act 1994. Failure to provide any information, instruction, and training as necessary to ensure the safety practices of employees RM25,000.00
Tastiway Sdn. Bhd. 2016-04-05 Manufacturing Peraturan 5(1)(b)(aa) dan (bb)- Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal dalam masa 7 hari menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. (Bal Bahadur Thapa). RM1,000.00
Tastiway Sdn. Bhd. 2016-04-05 Manufacturing Peraturan 5(1)(b)(aa) dan (bb)- Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal dalam masa 7 hari menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. (Mohd Nurizzat Bin Othman). RM1,000.00
Pancaran Ilham Engineering Sdn Bhd 2016-04-04 Construction Seksyen 35(1), Akta Kilang Dan Jentera 1967. Sebagai Kontraktor Di Cadangan Pembinaan Skim Bercampur Bagi Perumahan Teres Satu (1) Lapis Untuk Lot PT 5889 - PT 5901 & PT 5902 (26 Unit) Di Kampung Banggol Peradong, Mukim Belara, Daerah Kuala Terengganu, Terengganu Yang Melakukan Operasi Pembinaan, Dalam Tempoh Tidak Lebih Tujuh Hari Daripada Permulaan Operasi Berkenaan Telah Gagal Menyerahkan Kepada Pemeriksa Notis Bertulis Dalam Bentuk Yang Ditetapkan. RM2,500.00
SHORUBBER (M) SDN BHD 2016-04-04 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Telah gagal menyediakan peralatan Kelengkapan Pelindung Diri kepada pekerja dan telah melanggar Standard Operation Procedure (SOP) seperti yang yelah ditetapkan ketika melakukan kerja-kerja mengendalikan bahan kimia di tempat kerja. Telah gagal menyediakan peralatan Kelengkapan Pelindung Diri kepada pekerja dan telah melanggar Standard Operation Procedure (SOP) seperti yang yelah ditetapkan ketika melakukan kerja-kerja mengendalikan bahan kimia di tempat kerja. RM5,000.00
F.Y. Sdn. Bhd. 2016-04-01 Manufacturing Peraturan 5(2) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal menghantar laporan kepada pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan yang terdekat dalam tempoh 7 hari tentang kemalangan yang menyebabkan kecederaan yang berlaku ke atas pekerja kamu Gambhir Sing Dala (No. Pssport: 4245664). RM2,500.00
Daya CMT Sdn Bhd 2016-03-22 Construction Seksyen 17(1) -Akta Keselamatan dan Kesihatan Pekerjaan 1994. gagal mencegah berlakunya hentakan kepala pada slab sehingga menyebabkan kematian . RM15,000.00
SKB SHUTTERS MANUFACTURING SDN BHD 2016-03-21 Manufacturing Seksyen 29(2)- Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak Mengambil Kerja Sho. RM1,000.00
Sinora Sdn. Bhd. 2016-03-16 Manufacturing Peraturan 5(1)(a)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 . Gagal Melaporkan Kemalangan Maut Serta-Merta Kepada Jkkp. RM5,000.00
Sinora Sdn. Bhd. 2016-03-16 Manufacturing Peraturan 5(1)(a)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 . Gagal Dalam Masa 7hari Hantar Laporan Kemalangan. RM5,000.00
Rhong Khen Timbers Sdn Bhd 2016-03-16 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Sebagai majikan di Lot 5222, Kawasan Perindustrian Ajil, Fasa 2, Mukim Tanggal, 21800 Hulu Terengganu telah gagal memberitahu dan melaporkan kemalangan pekerjaan yang menimpa Mohd Zulkurnin Bin Sulong (No. K/p: 910326-11-5645) yang menghalang beliau menjalankan tugas selama lebih daripada empat hari kalendar pada tarikh pada tarikh 10/09/2015. RM1,800.00
Luster Precision Eng. Sdn. Bhd. 2016-03-15 Manufacturing Peraturan 5(1)(b)(aa) dan (bb)- Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal dalam masa 7 hari menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM1,500.00
Million Interwork Sdn. Bhd. 2016-03-15 Manufacturing Peraturan 5(1)(b)(aa) dan (bb)Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal dalam masa 7 hari menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM1,500.00
Wijaya Bandar Bina Sdn Bhd 2016-03-14 Construction Seksyen 10(e) - Akta Kilang dan Jentera 1967. Platform dibina dengan selamat bagi mengelak orang risiko terjatuh. RM8,000.00
Tiara Contours Sdn Bhd 2016-03-11 Construction Per 5(1)(aa)- Peraturan-Peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Tidak melaporkan kemalangan dengan serta-merta. RM3,000.00
Siab (M) Sdn Bhd 2016-03-11 Construction Seksyen 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mematuhi Notis (2a 009904) yang Dikeluarkan Pada 23/03/2016. RM20,000.00
MCB Industries Sdn. Bhd. 2016-03-11 Manufacturing Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 19941994. Gagal untuk memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya termasuklah Manbir Chaudhary (No. Passport: 05556277) terutamanya gagal menyediakan cara kerja selamat bagi proses kerja penukaran pisau di dalam jentera trapezium mill sehingga menyebabkan kecederaan badan yang serius. RM40,000.00Gagal untuk memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya termasuklah Manbir Chaudhary (No. Passport: 05556277) terutamanya gagal menyediakan cara kerja selamat bagi proses kerja penukaran pisau di dalam jentera trapezium mill sehingga menyebabkan kecederaan badan yang serius. RM40,000.00
Ladang Petri Tenggara Sdn Bhd 2016-03-10 Plantation Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Pengangkutan Yang Selamat Untuk Ke Tempat Kerja. RM10,000.00
Everwin Plastic Sdn. Bhd. 2016-03-10 Manufacturing Peraturan 10(b) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000 Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Di antara 16 Julai 2013 hingga 20 Oktober 2015 majikan telah gagal menjalankan kajian semula penaksiran risiko bahan kimia berbahaya kepada kesihatan setelah 5 tahun telah berlalu sejak penaksiran terakhir dilakukan pada 15 Julai 2008. RM3,000.00Di antara 16 Julai 2013 hingga 20 Oktober 2015 majikan telah gagal menjalankan kajian semula penaksiran risiko bahan kimia berbahaya kepada kesihatan setelah 5 tahun telah berlalu sejak penaksiran terakhir dilakukan pada 15 Julai 2008. RM3,000.00
Bumi Suria Ventures Sdn Bhd 2016-03-09 Agriculture Seksyen 15(2)(b) Akta Keselamatan dan Kesihatan Pekerjaan, 1994. Gagal utk menyediakan SOP sewaktu berlaku kerosakan pd jentera(lori pembawa buah sawit)(Wolf 21). RM5,000.00
Wawasan 33 Sdn Bhd 2016-03-09 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memastikan tempat kerja selamat hingga menyebabkan kematian. RM30,000.00
BM City Capital Sdn Bhd 2016-03-09 Construction Seksyen 19(1)- Akta Kilang dan Jentera 1967. Kendalikan jentera tanpa perakuan kelayakan yang sah. RM10,000.00
BM City Capital Sdn Bhd 2016-03-09 Construction Seksyen 10(e)- Akta Kilang dan Jentera 1967. Gagal ditutup dengan rapat-rapat batau dipagar dengan kukuh setiap tingkat. RM10,000.00
Era Alpha Sdn Bhd 2016-03-09 Construction Seksyen 15(1)- Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan prosedur penyelenggaraan kren bergerak. RM10,000.00
Chuan Un Chye Sdn Bhd 2016-03-09 Construction Seksyen 21- Akta Kilang dan Jentera 1967. Gagal meemriksa swing lock pin pada boom kren bergerak. RM10,000.00
RB City Sdn Bhd 2016-03-09 Construction Seksyen 29(2)- Akta Keselamatan dan Kesihatan Pekerjaan 1994. tiada pegawai keselamatan dan kesihatan yang kompeten. RM2,000.00
Akitiara Industri Sdn. Bhd. 2016-03-08 Manufacturing Peraturan 9(1),Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Menjalankan Penaksiran Risiko Kepada Kesihatan (Gagal Menjalankan Chra (Isoprophyl Alcohol - Cas #: 67-63-0). RM6,000.00 Penjara:6 Bulan
Laubros Holdings (M) Sdn Bhd 2016-03-07 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memastikan tempat kerja selamat hingga menyebabkan kematian. RM20,000.00
Siat Yun safety Glass Sdn Bhd 2016-03-05 Manufacturing Peraturan 9(1), Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Penggunaan dan Standard Pendedahan Bahan Kimia Berbahaya kepada Kesihatan) 2000Gagal menjalankan penaksiran bertulis mengenai risiko yang terhasil daripada bahan kimia. RM3,000.00
EVERGREEN RUBBERWOOD PRODUCTS SDN BHD 2016-03-03 Manufacturing Peraturan 5(1) - Peraturan-Peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal dalam masa 7 hari menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan berkaitan kemalangan RM2,000.00
Kilang Mee Lung Far Sdn Bhd 2016-03-03 Manufacturing Seksyen 19(1) Akta Kilang dan Jentera 1967. Mengendalikan Seunit Dandang Stim Tanpa Sijil Perakuan Kelayakan Yang Sah. RM15,000.00
Kilang Mee Lung Far Sdn Bhd 2016-03-03 Manufacturing Seksyen 29(1) Akta Kilang dan Jentera 1967. Seunit Dandang Stim Dikendalikan Oleh Drebar Tidak Kompeten. RM5,000.00
Comfort Rubber Gloves Industries 2016-03-02 Manufacturing Seksyen 29(2) dibaca bersama Perintah 3(j) Perintah Keselamatan dan Kesihatan (Pegawai Keselamatan dan Kesihatan) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal mengambil kerja seorang kompeten untuk bertindak sebagai Pegawai Keselamatan dan Kesihatan di tempat kerja. RM900.00
Riverstone Resources Sdn. Bhd. 2016-03-02 Manufacturing Seksyen 29(2) dibaca bersama Perintah 3(j) Perintah Keselamatan dan Kesihatan (Pegawai Keselamatan dan Kesihatan) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal mengambil kerja seorang orang kompeten untuk bertindak sebagai Pegawai Keselamatan dan Kesihatan di tempat kerja. RM1,000.00
Libaas Logistic Sdn. Bhd. 2016-03-02 Pengangkutan Seksyen 16 Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal menyediakan Dasar Keselamatan dan Kesihatan Pekerjaan di tempat kerja dan seberapa kerap yang sesuai mengkaji semula pernyataan bertulis dasar amnya berkenaan dengan keselamatan dan kesihatan pekerja-pekerjanya semasa bekerja. RM2,000.00
Lotte Chemical Titan (M) Sdn Bhd 2016-02-29 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengkoordinasi kerja-kerja penyelenggaraan. RM15,000.00
Lotte Chemical Titan (M) Sdn Bhd 2016-02-29 Manufacturing Peraturan 5(3)- Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal melaporkan kematian pekerja akibat kemalangan. RM5,000.00
Tenaga Nasional Berhad 2016-02-22 Kemudahan Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja pekerjanya. RM22,000.00
TH WOOD PRODUCTS TRADING 2016-02-22 Manufacturing Peraturan 5(1) - Peraturan-Peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, . Gagal dengan serta merta memberitahu pejabatJabatan Keselamatan dan Kesihatan Pekerjaan yang terdekat dengan cara yang paling cepat yang ada kaitan dengan kemalangan yang menyebabkan kecederaan serius RM1,000.00
YLI Industry Sdn. Bhd. 2016-02-22 Manufacturing Seksyen 29(2) dibaca bersama Perintah 3(g) Perintah Keselamatan dan Kesihatan (Pegawai Keselamatan dan Kesihatan) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Tidak mengambil kerja seorang orang kompeten sebagai pegawai keselamatan dan kesihatan di tempat kerja. RM4,500.00
ARGA BAHAGIA KUARI SDN BHD 2016-02-22 Quarry Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menyenggara loji dan sistem kerja yang setakat yang praktik,selamat dan tanpa risiko kepada kesihatan dan kebajikan pekerja. RM5,000.00
Aalborg Portland Malaysia 2016-02-19 Manufacturing Peraturan 7(1) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Di antara 14 Mei 2014 hingga 28 September 2015 sebagai majikan telah gagal dalam masa 7 hari menghantar laporan kepada Pejabat JKKP yang terdekat mengenai penyakit pekerjaan, kerosakan pendengaran disebabkan kebisingan yang berlaku ke atas pekerja kamu Ramesh Kumar a/l Gopalan (No. K/P: 670812-08-6245). RM9,000.00
Aalborg Portland Malaysia 2016-02-19 Manufacturing Peraturan 7(1) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Di antara 14 Mei 2014 hingga 28 September 2015 sebagai majikan telah gagal dalam masa 7 hari menghantar laporan kepada Pejabat JKKP yang terdekat mengenai penyakit pekerjaan, kerosakan pendengaran disebabkan kebisingan yang berlaku ke atas pekerja kamu Ahmad Zawari Bin Abdul Rahman (No. K/P: 631010-08-5679). RM9,000.00Di antara 14 Mei 2014 hingga 28 September 2015 sebagai majikan telah gagal dalam masa 7 hari menghantar laporan kepada Pejabat JKKP yang terdekat mengenai penyakit pekerjaan, kerosakan pendengaran disebabkan kebisingan yang berlaku ke atas pekerja kamu Ahmad Zawari Bin Abdul Rahman (No. K/P: 631010-08-5679). RM9,000.00
Perunding R & R Sepakat 2016-02-16 Construction Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1995. Gagal Menyediakan Tempat Kerja Yang Selamat Sehingga Pekerja Maut Di Tempat Kerja. RM2,500.00
Chee Kiang Crane Service 2016-02-16 Perkhidmatan perniagaan Sek. 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Tiada sop untuk kerja-kerja penyimpanan dan penyimpanan fly-jib crane. RM15,000.00
BENUA LIPUTAN SDN BHD 2016-02-15 Manufacturing Peraturan 5(1) - Peraturan-Peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal dengan serta merta memberitahu pejabat jabatan keselamatan dan kesihatan pekerjaan yang terdekat dengan cara yang paling cepat yang ada kaitan dengan kemalangan yang menyebabkan kecederaan serius. RM3,000.00
GTL Engineering & Piping 2016-02-07 Manufacturing Peraturan 5(1)(a)(bb), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan dan Kesihatan Pekerjaan 1994. gagal melaporkan kemalangan dengan borang ditetapkan dalam tempoh 7 hari. RM2,500.00
Adventist Hospital and Clinical Services 2016-02-01 Perkhidmatan Peraturan 7(1)(b)(ii) - Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Kawalan Terhadap Bahaya Kemalangan Besar Dalam perindustrian) 1996. Gagal mengemukakan Borang Pemberitahuan Industri bagi penyimpanan 2 tangki GPC. RM2,000.00
Kejuruteraan Kitaki Padu Sdn Bhd 2016-01-31 Construction Seksyen 35(1), Akta Kilang dan Jentera 1967. Sebagai kontraktor di Cadangan Kerja-Kerja Membaiki Kecacatan Pada ?UPVC Groove Line? di Dinding Luaran Kuarters Kelas F untuk Cadangan Pembangunan Kem Pasukan Simpanan Persekutuan (PSP6) di atas Lot PT7159, Mukim Alor Limbat, Pekan Wakaf Tapai, Daerah Marang, Terengganu Darul Iman (Pakej 1) yang melakukan operasi pembinaan, dalam tempoh tidak lebih tujuh hari daripada permulaan operasi berkenaan telah gagal menyerahkan kepada Pemeriksa notis bertulis dalam bentuk yang ditetapkan. RM2,500.00
Kejuruteraan Kitaki Padu Sdn Bhd 2016-01-31 Construction Peraturan 25 (1) Peraturan-Peraturan Kilang dan Jentera (Kendalian Bangunan dan Kerja-Kerja Binaan Kejuruteraan) (Keselamatan) 1986. Sebagai kontraktor utama tapak bina di Cadangan Kerja-Kerja Membaiki Kecacatan Pada ?UPVC Groove Line? di Dinding Luaran Kuarters Kelas F untuk Cadangan Pembangunan Kem Pasukan Simpanan Persekutuan (PSP6) di atas Lot PT7159, Mukim Alor Limbat, Pekan Wakaf Tapai, Daerah Marang, Terengganu Darul Iman (Pakej 1) telah gagal melantik seorang penyelia keselamatan tapak bina separuh masanya yang menghabiskan masanya sekurang-kurangnya lima belas jam seminggu khusus mengenai pengawasan keselamatan dan menggalakkan tatakerja yang selamat amnya di tapak bina. RM1,000.00Sebagai kontraktor utama tapak bina di Cadangan Kerja-Kerja Membaiki Kecacatan Pada ?UPVC Groove Line? di Dinding Luaran Kuarters Kelas F untuk Cadangan Pembangunan Kem Pasukan Simpanan Persekutuan (PSP6) di atas Lot PT7159, Mukim Alor Limbat, Pekan Wakaf Tapai, Daerah Marang, Terengganu Darul Iman (Pakej 1) telah gagal melantik seorang penyelia keselamatan tapak bina separuh masanya yang menghabiskan masanya sekurang-kurangnya lima belas jam seminggu khusus mengenai pengawasan keselamatan dan menggalakkan tatakerja yang selamat amnya di tapak bina. RM1,000.00
Segamat Panel Boards Sdn Bhd 2016-01-28 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memastikan tempat kerja selamat untuk pekerjanya sehingga menyebabkan kematian. RM20,000.00
Rjb Iskandar Enterprises 2016-01-27 Manufacturing Sek. 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal memastikan , setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya dengan tidak mengadakan pks bagi aktiviti penyusunan dan penyimpanan girder. RM15,000.00
Salini Malaysia Sdn. Bhd. 2016-01-26 Construction Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menjalankan pengusahaan kamu dengan cara memastikan, setakat yang praktik, bahawa orang-orang lain, yang bukan pekerja kamu, yang mungkin tersentuh oleh pengusahaan kamu itu tidak terdedah kepada risiko kepada keselamatan dan kesihatan mereka oleh sebab pengusahaan kamu itu termasuklah termasuk Md Ismail (No. Passport: F0093911) terutamanya gagal menyediakan cara kerja selamat bagi proses kerja scalling di dalam terowong di tapak bina Projek Hidroelektrik Ulu Jelai, Ringlet, 39200 Cameron Highlands, Pahang sehingga menyebabkan kemalangan maut. RM4,500.00
Salini Malaysia Sdn. Bhd. 2016-01-26 Construction Peraturan 5(1)(b)(aa)(bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal dengan serta merta memberitahu pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan yang terdekat dengan cara yang paling cepat yang ada dan dalam masa 7 hari menghantar leporan tentang kemalangan dalam boring yang diluluskan bagi pekerja Md Ismail (No. Passport: F0093911). RM25,000.00
Alumeco Sdn Bhd 2016-01-26 Construction Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Memastikan Setakat Yang Praktik Keselamatan Orang Lain . RM10,000.00
Keller (M) Sdn. Bhd. 2016-01-25 Construction Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal menyediakan perkiraan risiko terhadap tanah jerlus sehingga menyebabkan maut. RM35,000.00
Sabah Forest Industries Sdn Bhd 2016-01-25 Manufacturing Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak Menjalankan Penyeliaan Sebagaimana Yang Perlu Untuk Memastikan Setakat Yang Praktik Keselamatan Pekerjanya Yang Sedang Bekerja. RM25,000.00
Sabah Forest Industries Sdn Bhd 2016-01-25 Manufacturing Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada Pemasangan Pagar Kukuh Pada Jentera. RM25,000.00
Liftecmal Sdn Bhd 2016-01-24 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal menjalankan penyeliaan terhadap aktiviti kerja berkaitan penyelenggaraan ke atas mesin angkat penumpang sehingga membawa kemalangan maut. RM9,000.00
Mcc Overseas (M) Sdn Bhd 2016-01-23 Construction Seksyen 17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal menjalankan penyeliaan terhadap aktiviti kerja berkaitan penyelenggaraan ke atas mesin angkat penumpang sehingga membawa kemalangan maut
Bukit Tinggi Construction 2016-01-22 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja pekerjanya. RM8,000.00
Fine Rhythm Sdn Bhd 2016-01-21 Construction Peraturan 5(1)(b)(aa)(bb) - Peraturan-Peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal melaporkan kemalangan maut dalam tempoh 24 jam RM7,000.00
Guper Integrated Logistics Sdn. Bhd 2016-01-21 Perkhidmatan perniagaan Sek. 30, Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Gagal menubuhkan Jawatankuasa Keselamatan dan Kesihatan di tempat kerja
Ewe Lee Development Sdn. Bhd. 2016-01-20 Agriculture Peraturan 5(2) Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal menghantar laporan kepada pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan dalam boring yang diluluskan tentang kemalangan berbangkit daripada kerja yang melibatkan pekerja kamu Mohd Nor Nofiah (No. K/P: 550420-08-6039) yang menghalangnya mengikuti pekerjaan biasanya selama lebih daripada empat hari kalendar. RM1,200.00
Bras Ventures Sdn Bhd 2016-01-20 Construction Seksyen 17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal mengambil kira risikokerja dengan tidak membuat kawalanyang secukupnya semasa kerja penarikan kabel elektrik. RM6,000.00
Morisem Sdn Bhd 2016-01-19 Manufacturing Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak Menjalankan Penyeliaan Sebagaimana Yang Perlu Untuk Memastikan Setakat Yang Praktik Keselamatan Pekerjanya Yang Sedang Bekerja. RM20,000.00
United Plantations Berhad 2016-01-19 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua kamu termasuk Ramesh Bharti (No. Passport: L 1655053) terutamanya dengan tidak menyediakan tempat kerja selamat iaitu loose fruits return conveyor yang tidak diadang dengan sempurna sehingga menyebabkan kemalangan maut.
Vme Material Handling Sdn Bhd 2016-01-19 Manufacturing Sek. 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Gagal memastikan , setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja orang-orang lain yang bukan pekerjanya dengan tidak mengadakan pks bagi aktiviti penyusunan dan penyimpanan girder. RM20,000.00
Puspajaya Aluminium Sdn Bhd 2016-01-19 Manufacturing Peraturan 5(1)(b)(aa)(bb) - Peraturan-Peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal melaporkan kemalangan ke tasa pekerja yang berlaku di tempat kerja. RM3,500.00
Key Profile Sdn Bhd 2016-01-18 Construction Seksyen 29, Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal melantik seorang yang kompeten untuk bertindak sebagai pegawai keselamatan dan kesihatan. RM3,000.00
Ywc Engineers And Constructors Sdn Bhd 2016-01-17 Construction Sek. 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Gagal mematuhi nop - gagal mengadakan sistem kawalan, penyeliaan dan penguatkuasaan khususnya bekerja di tempat tinggi (kerja-kerja ikat besi, pemasangan acuan & perancah) RM25,000.00
Zfront Venture Sdn. Bhd. 2016-01-15 Construction Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya dengan tidak mematuhi Prosedur Kerja Selamat (SOP) bagi kerja rombakan kren menara bernombor pendaftaran PMA 17296 di tapak bina RM4,000.00
Interia Sdn Bhd 2016-01-11 Construction Seksyen 20(1)(b), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengenalpasti kerosakan load cell sehingga menyebabkan kemalangan maut. RM15,000.00
Innosin Technologies Sdn Bhd 2016-01-11 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan penaksiran risiko. RM20,000.00
OTIS Elevator Company (M) Sdn Bhd 2016-01-11 Construction Seskyen 15(1) , Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan cara kerja yang selamat. RM35,000.00
Aston Star Sdn Bhd 2016-01-11 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan penyeliaan untuk memastikan keselamatan dan kesihatan pekerjanya. RM30,000.00
Sabah Forest Industries Sdn Bhd 2016-01-11 Manufacturing Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Akkp Tidak Menjalankan Penyeliaan Sebagaimana Yang Perlu Untuk Memastikan Setakat Yang Praktik Keselamatan Pekerjanya Yang Sedang Bekerja. RM13,000.00
MCC Overseas (M) Sdn Bhd 2016-01-10 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menyelia kerja-kerja memindahkan hollow core slab sehingga menyebabkan kemalangan maut RM25,000.00
SsangYong Engineering & Construction Co. Ltd. 2016-01-07 Construction Per. 5(1)(a)(aa) dan (bb)- Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal dengan serta merta memberitahu mengenai kemalangan maut kepada pejabat JKKP yang terdekat dengan cara yang paling cepat yang ada RM1,500.00
Rimbaco Sdn Bhd 2016-01-07 Construction Per 5(1)(aa)- Peraturan-Peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal melaporkan kejadian berbahaya berkenaan cairan konkrit yang tumpah RM5,000.00
Rimbaco Sdn Bhd 2016-01-07 Construction Peraturan 29(1) Peraturan-Peraturan Kilang dan Jentera (Kendalian Bangunan dan Kerja-Kerja Binaan Kejuruteraan) (Keselamatan) 1986. Gagal memastikan acuan yang dibina dengan selamat RM1,000.00
Senga Bina Sdn Bhd 2016-01-06 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan tempat kerja selamat sehingga menyebabkan kematian. RM40,000.00
Senga Bina Sdn Bhd 2016-01-06 Construction Seksyen 29(2), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengambil orang kompiten sebagai pegawai keselamatan dan kesihatan di tempat kerja. RM5,000.00
NVM Safety & Health Consultancy Service 2016-01-06 Construction Seksyen 20(3), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memastikan perancah yang dipasang selamat digunakan sehingga menyebabkan kemalangan maut. RM15,000.00
Hab Construction Sdn Bhd 2016-01-06 Construction Sek. 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Tidak Mematuhi Arahan Di Dalam Notis Larangan. Notis Tidak Dibatalkan. RM15,000.00
Panzana Enterprise Sdn Bhd 2016-01-03 Construction Sek. 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Gagal mematuhi notis yang dikeluarkan pada 2/10/2014 - kerja di cs (hand-dug caisson). RM25,000.00
Syarikat Sribima Sdn Bhd 2016-01-03 Transportation Peraturan 5(1)(a)(bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan) . Gagal dalam masa 7 hari melapor kemalangan di dalam borang yg diluluskan. RM2,500.00
Ban Seng Lee Industries Sdn Bhd 2016-01-02 Manufacturing Sek. 29(2), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Tidak mengambil kerja sho. RM3,000.00
Sim Huat Mobile Crane Eng. Sdn. Bhd. 2015-12-24 Construction Per. 5(1)(a)(aa) dan (bb), NADOPOD 2004 AKKP 1994. Gagal dengan serta merta memberitahu mengenai kemalangan maut kepada pejabat JKKP yang terdekat dengan cara yang paling cepat yang ada. RM800.00
Masfloor Sdn Bhd 2015-11-27 Manufacturing Seksyen 15(1) AKKP 1994 . Gagal menyediakan maklumat berkaitan prosedur kerja selamat bagi kerja-kerja mengulung tikar getah kepada pekerjanya. RM7,000.00
Malaysia Steel Works (Kl) Bhd 2015-11-16 Manufacturing Sek. 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Gagal mewujudkan satu sistem kerja selamat dan penaksiran risiko bagi kerja-kerja membuka hose coupling. RM10,000.00
Salini Malaysia Sdn. Bhd. 2015-10-23 Construction Seksyen 17(1) AKKP 1994 . Gagal menjalankan pengusahaan kamu dengan cara memastikan, setakat yang praktik, bahawa orang-orang lain, yang bukan pekerja kamu, yang mungkin tersentuh oleh pengusahaan kamu itu tidak terdedah kepada risiko kepada keselamatan dan kesihatan mereka oleh sebab pengusahaan kamu itu termasuklah termasuk Md Ismail (No. Passport: F0093911) terutamanya gagal menyediakan cara kerja selamat bagi proses kerja scalling di dalam terowong di tapak bina Projek Hidroelektrik Ulu Jelai, Ringlet, 39200 Cameron Highlands, Pahang sehingga menyebabkan kemalangan maut. RM4,500.00
Salini Malaysia Sdn. Bhd. 2015-10-23 Construction Peraturan 5(1)(b)(aa)(bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) AKKP 1994. Gagal dengan serta merta memberitahu pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan yang terdekat dengan cara yang paling cepat yang ada dan dalam masa 7 hari menghantar leporan tentang kemalangan dalam boring yang diluluskan bagi pekerja Md Ismail (No. Passport: F0093911). RM25,000.00
Zfront Venture Sdn. Bhd. 2015-10-23 Construction Seksyen 15(1) AKKP 1994 . Gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya dengan tidak mematuhi Prosedur Kerja Selamat (SOP) bagi kerja rombakan kren menara bernombor pendaftaran PMA 17296 di tapak bina. RM40,000.00
Wellcall Hose (M) Sdn. Bhd. 2015-10-23 Manufacturing Peraturan 10(b) Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Penggunaan dan Standard Pendedahan Bahan Kimia Berbahaya kepada Kesihatan) 2000 AKKP 1994 . Gagal menjalankan kajian semula penaksiran risiko bahan kimia berbahaya kepada kesihatan setelah lima tahun berlalu sejak penaksiran terakhir dijalankan pada 22 Ogos 2008. RM5,000.00
ICA Plastic Industries Sdn. Bhd. 2015-10-23 Manufacturing Peraturan 26(1) Peraturan-peraturan Keselamatan dan kesihatan Pekerjaan (Penggunaan dan Standard Pendedahan Bahan Kimia Berbahaya kepada Kesihatan) 2000 AKKP 1994 . Gagal menjalankan permonitoran pendedahan bahan kimia berbahaya kepada kesihatan oleh juruteknik higen (HT1) jika dicadangkan oleh Pengapit dalam laporan penaksiran risiko kesihatan. RM10,000.00
MSBB Engineering Sdn. Bhd. 2015-10-23 Manufacturing Seksyen 29(2) dibaca bersama Perintah 3(g) Perintah Keselamatan dan Kesihatan (Pegawai Keselamatan dan Kesihatan) AKKP 1994 . Tidak mengambil kerja seorang orang kompeten sebagai pegawai keselamatan dan kesihatan di tempat kerja. RM4,000.00
F.Y. Sdn. Bhd. 2015-10-23 Manufacturing Reg 5(1)NADOPOD)2004 & Sek 15(2)(b) AKKP 1994 . Gagal menghantar laporan kepada pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan yang terdekat dalam tempoh 7 hari tentang kemalangan yang menyebabkan kecederaan yang berlaku ke atas pekerja kamu Gambhir Sing Dala (No. Pssport: 4245664). RM2,500.00
Ewe Lee Development Sdn. Bhd. 2015-10-22 Agriculture Peraturan 5(2) Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 AKKP 1994 . Gagal menghantar laporan kepada pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan dalam boring yang diluluskan tentang kemalangan berbangkit daripada kerja yang melibatkan pekerja kamu Mohd Nor Nofiah (No. K/P: 550420-08-6039) yang menghalangnya mengikuti pekerjaan biasanya selama lebih daripada empat hari kalendar. RM1,200.00
United Plantations Berhad 2015-10-22 Manufacturing Seksyen 15(1) AKKP 1994 . Gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua kamu termasuk Ramesh Bharti (No. Passport: L 1655053) terutamanya dengan tidak menyediakan tempat kerja selamat iaitu loose fruits return conveyor yang tidak diadang dengan sempurna sehingga menyebabkan kemalangan maut. RM20,000.00
Comfort Rubber Gloves Industries 2015-10-22 Manufacturing Seksyen 29(2) dibaca bersama Perintah 3(j) Perintah Keselamatan dan Kesihatan (Pegawai Keselamatan dan Kesihatan) AKKP 1994 . Gagal mengambil kerja seorang kompeten untuk bertindak sebagai Pegawai Keselamatan dan Kesihatan di tempat kerja.
YLI Industry Sdn. Bhd. 2015-10-22 Manufacturing Seksyen 29(2) dibaca bersama Perintah 3(g) Perintah Keselamatan dan Kesihatan (Pegawai Keselamatan dan Kesihatan) AKKP 1994 . Tidak mengambil kerja seorang orang kompeten sebagai pegawai keselamatan dan kesihatan di tempat kerja.
LCW Processing Sdn Bhd 2015-10-22 Manufacturing Reg 5(1)(a)(aa) NADOPOD)2004 & Sek 15(2)(b) AKKP 1994 . Gagal dgn serta-merta melapor kemalangan maut dan gagal utk menyediakan SOP utk aktiviti pemotongan logam dan penyelenggaraan. RM1,200.00
Hai Hup Cold Storage Sdn Bhd 2015-10-22 Manufacturing Peraturan 9(1) Pendedahan Bising Kilang & Jentera 1967 . Gagal menjalankan pemonitoran pendedahan awalan bunyi bising kepada pekerja. RM600.00
Syarikat IAMKO Metal Industry Sdn Bhd 2015-10-22 Manufacturing Peraturan 9(1) Pendedahan Bising Akta Kilang & Jentera 1967. Gagal menjalankan pemonitoran pendedahan awalan bunyi bising kepada pekerja. RM600.00
Lau Wah Heng Construction 2015-10-21 Construction Seksyen 29(2) dibaca bersama Perintah 3(a) Perintah Keselamatan dan Kesihatan (Pegawai Keselamatan dan Kesihatan) AKKP 1994 . Gagal mengambil kerja seorang orang kompeten untuk bertindak sebagai Pegawai Keselamatan dan Kesihatan di tempat kerja. RM2,500.00
J.K Wire Harness Sdn. Bhd. 2015-10-21 Manufacturing Seksyen 29(2) dibaca bersama Perintah 3(j) Perintah Keselamatan dan Kesihatan (Pegawai Keselamatan dan Kesihatan) AKKP 1994 . Tidak mengambil kerja seorang orang kompeten sebagai pegawai keselamatan dan sihatan di tempat kerja. . RM800.00
Scanwolf Plastics Industries Sdn. Bhd. 2015-10-21 Manufacturing Peraturan 26(1) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000 AKKP 1994. Gagal menjalankan pemantauan pendedahan pekerja terhadap bahan kimia berbahaya kepada kesihatan. RM5,000.00
MSHK Engineering Sdn. Bhd. 2015-10-21 Manufacturing Seksyen 15(1) AKKP 1994 Gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua kamu termasuk Mahendra Ram Chamar (No. Passport: 06682889) terutamanya dengan tidak memastikan pemakaian alat pelindung keselamatan diri iaitu kasut keselamatan semasa bekerja sehingga menyebabkan mangsa mengalami kemalangan hilang upaya kekal semasa pembersihan ?sand mould? di atas meja conveyor. RM9,000.00
MSBB Engineering Sdn. Bhd. 2015-10-21 Manufacturing Seksyen 17(1) AKKP 1994 . Gagal memastikan setakat yang praktik bahawa dia dan orang-orang lain yang bukan pekerjanya yang mungkin tersentuh oleh pengusahaan itu tidak terdedah keada risiko kepada keselamatan dan kesihatan mereka oleh sebab pengusahaan itu termasuklah Mahendra Ram Chamar (No. Passport: 06682889) terutamanya dengan tidak melakukan penyeliaan terhadap aktiviti kerja penyelenggaraan dan pembersihan ?sand mould? di atas meja conveyor sehingga menyebabkan kemalangan hilang upaya kekal. RM9,000.00
Yoonsteel (M) Sdn. Bhd. 2015-10-21 Manufacturing Peraturan 17(1)(a)(b) Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Penggunaan dan Standard Pendedahan Bahan Kimia Berbahaya kepada Kesihatan) 2000 AKKP 1994. Gagal menjalankan pemeriksaan dan pengujian keberkesanan ke atas system kawalan kejuruteraan iaitu ?fume extractor?. RM9,000.00
Mandrin Pavilion Sdn Bhd 2015-10-17 Construction Reg 5(1)(a)(aa) NADOPOD)2004 & Sek 15(2)(b) AKKP 1994 Gagal memberitahu kemalangan serta merta ke pejabat JKKP terdekat. RM9,000.00
Mandrin Pavilion Sdn Bhd 2015-10-17 Construction Reg 5(1)(a)(bb) (NADOPOD)2004 AKKP 1994 . Gagal memberitahu kemalangandalam masa 7 hari ke pejabat JKKP terdekat. RM6,000.00
Ann Fong Elevator Sdn Bhd 2015-10-17 Construction Seksyen 15(1) AKKP 1994 . Gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerja kamu terutama. RM10.00
Reltech Ventures Sdn Bhd 2015-10-06 Facility - Electric Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan pekerjanya dengan tidak memastikan aktiviti kerja baik pulih dilakukan dengan selamat sehingga menyebabkan kemalanagan maut terhadap pekerjanya RM2,500.00 Penjara: 2 Bulan
Crec (M) Sdn. Bhd 2015-10-04 Construction Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . gagal dalam memastikan menyelanggara loji yang selamat tanpa risiko kepada keselamatan iaitu jentera lori pengangkut RM15,000.00
A.M.1 Construction Sdn. Bhd 2015-10-04 Construction Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . gagal menyediakan SOP berkaitan kerja-kerja memunggah batuyang melibatkan penggnunaan jentera. RM15,000.00
Tekun Asas Sdn Bhd 2015-09-02 Manufacturing Seksyen 15(1) AKKP. Gagal memastikan keselamatan kepada pekerjanya. RM10.00
Eita Elevator (M) Sdn Bhd 2015-07-17 Real Estate Seksyen 17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal memastikan setakat yang praktik, bahawa dia dan orang lain, yang bukan pekerjanya, yang mungkin tersentuh oleh perusahaannya itu tidak terdedah kepada risiko RM2,000.00Penjara : 2 Bulan
Syarikat Perusahaan Kelapa Sawit Sdn Bhd 2015-07-01 Manufacturing Seksyen17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal mengadakan penghadang untuk menjalankan kerja-kerja penyelenggaraan thresher drum RM10,000.00
Keller (M) Sdn. Bhd. 2015-06-30 Construction Seksyen 17(1) AKKP 1994 . Gagal menyediakan perkiraan risiko terhadap tanah jerlus sehingga menyebabkan maut. . RM35,000.00
Masfloor Sdn. Bhd 2015-06-14 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal menyediakan kasut keselamatan kepada pekerja berkaitan kerja-kerja memindahkan `middle layer` ke atas meja troli sehingga berlakunya kemalangan ditempat kerja dan menyebabkan kecederaan patah pada ibu jari kaki kiri kepada mangsa. RM5,000.00
Pro Wijaya Sdn. Bhd 2015-06-05 Construction Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . gagal mengadakan peralatan keselamatan pelindungan diri bagi kerja-kerja di tempat tinggi sehingga menyebabkan seorang pekerja meninggal dunia akibat terjatuh dari tempat tinggi. RM10,000.00
EK BUILD SDN BHD 2015-05-19 Construction SEK. 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 . Gagal Mematuhi Nop - Gagal Mengadakan Sistem Kawalan, Penyeliaan Dan Penguatkuasaan Khususnya Bekerja Di Tempat Tinggi. RM20,000.00
SETIAKON BUILDERS SDN BHD NO. 13, JALAN CEMPAKA, SD 12/1, B 2015-05-18 Construction PER. 28(1), BOWEC, AKJ 1967. Sebagai Penghuni Telah Gagal Untuk Menjalankan Kerja-Kerja Acuan Dan Penyangga Semula Hendaklah Diperakui Sebagai Binaan Yang Selamat Oleh Jurutera Prfesional Dan Hendaklah Dirembat Atau Diikat Dengan Sempurna Supaya Dpt Mengekalkan Kedudukan Dan Bentuknya Semasa Kerja2konkrit Supaya Tidak Berlaku Runtuhan Di Gridline A22/B3-B5. RM1,600.00
Eastern Steel Sdn Bhd 2015-04-29 Manufacturing Pertuduhan: Seksyen 15(1) AKKP 1994 Gagal Untuk Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Dengan Gagal Mengadakan Sistem Kerja Selamat Bagi Kerja-Kerja Pengemasan (Housekeeping) Untuk Fuel Crusher Operator Sehingga Menyebabkan Kemalangan Maut.
Tech Art Sdn Bhd 2015-04-29 Manufacturing Pertuduhan:Peraturan 75 (1),BOWEC Perancah Tiada Kelulusan daripada PE
Kining Exeton 2015-04-24 Construction Seksyen 49 AKKP 1994 RM10,000.00
Prosper Palm Oil Mill Sdn Bhd 2015-04-24 Manufacturing Pertuduhan:Peraturan 21, Tidak Menjalankan Mesyuarat Jawatankuasa keselamatan dan kesihatan selepas kemalangan berlaku RM 5,000 @ 6 Bulan Penjara
Prosper Palm Oil Mill Sdn Bhd 2015-04-24 Manufacturing Pertuduhan: Peraturan 5(1)(b)(aa)(bb), Nadopod Tidak Melaporkan kemalangan RM 10,000 @ 1 Tahun Penjara
BBR CONSTRUCTION SYSTEMS (M) SDN. BHD. 2015-04-08 Construction Pertuduhan: Seksyen 15(1) AKKP 1994 Gagal Untuk Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Dengan Gagal Mengadakan Penyelenggaraan Ke Atas Sistem Over Boom Cut Off Bagi Crawler Crane Bernombor Pendaftaran SL PMA 9086 Di Tempat Kerja Dan Menyebabkan ?Lattice Boom? Putus.
Tech Art Sdn Bhd 2015-04-07 Manufacturing Pertuduhan: Peraturan 85 (1), BOWEC Perancah tiada pemeriksaan oleh scaffolder dalam masa 7 hari RM 2,000.00
Bintang Kencana Sdn Bhd 2015-03-31 Construction Seksyen17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal memastikan tempat kerja selamat untuk orang lain yang bukan pekerjanya RM10,000.00
Mahamurni Plantations Sdn Bhd 2015-03-28 Manufacturing Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal mengadakan tempat kerja selamat bagi kerja di tempat tinggi. RM25,000.00
Mahamurni Plantations Sdn Bhd 2015-03-28 Manufacturing Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal mengadakan tempat kerja selamat bagi kerja-kerja penyelenggaraan mesin. RM15,000.00
Pacific Oleo Chemical Sdn Bhd 2015-03-27 Construction Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Tiada penyeliaan untuk tempat kerja selamat RM20,000.00
Nuripac Sdn Bhd 2015-03-27 Construction Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal memastikan tempat kerja selamat untuk pekerjanya sehingga menyebabkan kematian RM20,000.00
Negeri Sembilan Cement Industries Sdn. Bhd 2015-03-24 Manufacturing peraturan 5(2)nadopod . gagal dalam masa 7 hari menghantar laporan tentang kemalangan dalam borang yang diluluskan kepada JKKP yang terdekat. RM2,000.00
Leong Hong Engineering 2015-03-24 Perkhidmatan Perniagaan peraturan 5(2)nadopod . gagal dalam masa 7 hari menghantar laporan tentang kemalangan dalam borang yang diluluskan kepada JKKP yang terdekat. RM2,000.00
Syarikat Yusof, Yasin Sdn. Bhd. 2015-03-18 Construction Pertuduhan: Seksyen 35(1) , Akta Kilang dan Jentera 1967Sebagai kontraktor di Cadangan Membina dan menyiapkan Sekolah Menengah Vokasional Kuala Berang serta kerja-kerja infrastruktur berkaitan, Lot 10062 (HSD 1188) Kampung Tajin, Mukim Kuala Berang, Hulu Terengganu, Terengganu yang melakukan operasi pembinaan, dalam tempoh tidak lebih tujuh hari daripada permulaan operasi berkenaan telah gagal menyerahkan kepada Pemeriksa notis bertulis dalam bentuk yang ditetapkan.
Spacious Structure Sdn Bhd 2015-03-18 Construction Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal menyediakan laluan keluar masuk yang selamat. RM25,000.00
NL Mechanical Engineering Sdn Bhd 2015-03-16 Manufacturing Seksyen15, Akta Kilang dan Jentera 1967 . Gagal memagar jentera hingga pekerja putus jari. RM15,000.00
NL Mechanical Engineering Sdn Bhd 2015-03-16 Manufacturing Seksyen19(1), Akta Kilang dan Jentera 1967 . Mengandalikan jentera bekas udara tanpa perakuan kelayakan yang sah. RM15,000.00
NL Mechanical Engineering Sdn Bhd 2015-03-16 Manufacturing Seksyen 29(2), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal mengambil kerja SHO. RM15,000.00
Borneo Samudera Sdn Bhd 2015-03-09 Plantation Pertuduhan: Seksyen 15(1) AKKP 1994 Gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya yang mana telah menyebabkan kematian ke atas seorang pekerja yang bernama Mogundili binti Magampun ( No. Kad Pengenalan : 620910-12-5484) RM12000.00
Felda Grains Teinal Sdn Bhd 2015-02-24 Manufacturing Seksyen17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal memastikan tempat kerja selamat untuk orang lain yang bukan pekerjanya sehingga ada kematian. RM20,000.00
Syarikat Agensi Simira 2015-02-24 Transportation Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal memastikan tempat kerja selamat untuk pekerjanya sehingga menyebabkan kematian. RM15,000.00
Syarikat Pemborong Jayabina Sdn Bhd 2015-02-12 Construction Pertuduhan: Sek.17(1), AKKP 1994 Gagal mengadakan susur tangan di tangga No.5 Blok B RM 10,000
Siraga Sdn Bhd 2015-02-11 Manufacturing Pertuduhan: Sek.15(1), AKKP1994 Gagal mengadakan cara kerja yang selamat untuk kerja-kerja penukaran tong-tong selinder LPG 50kg RM 15,000
Fujitec (M) Sdn Bhd 2015-02-10 Construction Pertuduhan: Sek.15(1), AKKP1994 Gagal mengadakan tempat kerja yang selamat untuk kerja-kerja pemasangan lif RM 20,000
United Sanoh Industries Sdn. Bhd 2015-02-05 Manufacturing Peraturan 5(1)(a)(aa) dan (bb) NODOPOD, AKKP 1994 gagal melaporkan kemalangan dengan serta merta dan hantar laporan dalam masa 7 hari. RM 4,000.00
United Sanoh Industries Sdn. Bhd. 2015-02-05 Manufacturing Peraturan 5(1)(a)(aa) dan (bb) NODOPOD, AKKP 1994 gagal melaporkan kemalangan dengan serta merta dan hantar laporan dalam masa 7 hari. RM 4,000.00
Felda Palm Industries Sdn Bhd 2015-02-04 Construction Pertuduhan: Sek.15(1), AKKP1994 Gagal mengadakan penyelenggaraan keatas pelantar kerja di kawasan "incline conveyor". RM 10,000
Hantong Metal Component Sdn Bhd 2015-01-26 Manufacturing Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal menyelenggara jentera himpit kuasa. RM20,000.00
Positive Platfo Sdn Bhd 2015-01-20 Construction Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Tidak memastikan penyediaan maklumat dan latihan yang perlu untuk kerja pemasangan perancah RM20,000.00
Metronium Engineering Sdn Bhd 2015-01-20 Construction Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Tidak menyediakan maklumat dan latihan yang perlu untuk kerja pemasangan perancah RM35,000.00
JIT Premier Construction Sdn Bhd 2015-01-12 Construction Peraturan 5(1)(a)(aa) NADOPOD , Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal melaporkan kemalangan. RM800.00
Paramount Bounty Sdn. Bhd 2015-01-06 Construction Pertuduhan: Seksyen 8(g), AKJ 1967 tidak mematuhi notis larangan yang telah dikeluarkan RM 8,000.00
KIM YI TRADING COMPANY 2014-12-30 Construction Sek. 29(2) Akta Keselamatan DanKesihatan Pekerjaan 1994 Dan Perintah 3(A) Perintah Keselamatan Dan Kesihatan Pekerjaan(Pegawai Keselamatan Dan Kesihatan) 2001
KIM YI TRADING COMPANY 2014-12-30 Construction Sek. 29(2) Akta Keselamatan DanKesihatan Pekerjaan 1994 Dan Perintah 3(A) Perintah Keselamatan Dan Kesihatan Pekerjaan(Pegawai Keselamatan Dan Kesihatan) 2000
EITA ELEVATOR (M) SDN BHD 2014-12-22 Gagal Memastikan Setakat Yang Praktik, Bahawa Dia Dan Orang-Orang Lain, Yang Bukan Pekerjanya, Yang Mungkin Tersentuh Oleh Perusahaannya Itu Tidak Terdedah Kepada Risiko Kepada Keselamatan Atau Kesihatan Mereka Oleh Sebab Perusahaan Itu. (Ppr Desa Tun Razak). RM2000 @Penjara 2 bln
EASTBOURNE CORPORATION BHD 2014-12-22 Construction Sek. 29(2) Akta Keselamatan DanKesihatan Pekerjaan 1994 Dan Perintah 3(A) Perintah Keselamatan Dan Kesihatan Pekerjaan(Pegawai Keselamatan Dan Kesihatan) 1999 RM10,000.00
DOMAIN RESOURCES SDN BHD 2014-12-22 Construction Gagal Mengambil Kerja Seorang Yang Kompeten Sebagai Sho RM2,500.00
Asian Resinated Sdn Bhd 2014-12-18 Manufacturing Seksyen 15, Akta Kilang dan Jentera . Bahagian jentera yang memberbahaya RM7,000.00
PRISMA DINAMIK SDN BHD 2014-12-16 Construction Sek. 29(2) Akta Keselamatan DanKesihatan Pekerjaan 1994 Dan Perintah 3(A) Perintah Keselamatan Dan Kesihatan Pekerjaan(Pegawai Keselamatan Dan Kesihatan) 1997 RM10,000.00
Prosper Palm Oil Mill Sdn Bhd 2014-12-16 Manufacturing Peraturan 5(1)(b)(aa)(bb), Nadopod . Tida Melaporan kemalangan RM3,000.00
Prosper Palm Oil Mill Sdn Bhd 2014-12-16 Manufacturing Peraturan 21, Peraturan JKK . Tidak melakukan mesyuarat jawatankuasa keselamatan dan kesihatan selepas kemalangan berlaku RM1,500.00
GLORIOUS BUILDER SDN BHD 2014-12-09 Construction Sek. 29(2) Akta Keselamatan DanKesihatan Pekerjaan 1994 Dan Perintah 3(A) Perintah Keselamatan Dan Kesihatan Pekerjaan(Pegawai Keselamatan Dan Kesihatan) 1998 RM15,000.00
Tesco Ambient Distribution Sdn. BHd. 2014-12-09 Perkhidmatan perniagaan Peraturan 5(1)(a)(bb) NODOPOD, AKKP 1994 gagal melaporkan kemalangan dengan serta merta dan hantar laporan dalam masa 7 hari. RM3,000.00
Tesco Ambient Distribution Sdn. BHd. 2014-12-09 Perkhidmatan perniagaan Peraturan 5(1)(a)(aa) NODOPOD, AKKP 1994 gagal melaporkan kemalangan dengan serta merta dan hantar laporan dalam masa 7 hari. RM3,000.00
TIMUR KAMI SDN BHD 2014-12-08 Agriculture Per.5(2),Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan,Kejadian Berbahaya,Keracunan Pekerjaan Dan Penyakit Pekerjaan)2007 RM4,000.00
Excellent Builders & Development Sdn. Bhd. 2014-12-08 Construction Seksyen 17(1), AKKP 1994 gagal mengadakan suatu sistem kerja selamat untuk memastikan "falsework system" adalah selamat RM20,000.00
Prinsiptek (M) Sdn. Bhd. 2014-12-08 Construction Seksyen 15(1), AKKP 1994 gagal mengadakan prosedur kerja selamat bagi aktiviti mengangkat menggunakan kren menara RM3,500.00
Tech Art Sdn Bhd 2014-11-24 Manufacturing Peraturan 85 (1), BOWEC . Perancah tiada pemeriksaan oleh scaffolder dalam masa 7 hari RM800.00
Tech Art Sdn Bhd 2014-11-24 Manufacturing Peraturan 75 (1),BOWEC . Perancah tiada Kelulusan daripada PE RM800.00
Forever Green Enterprise Sdn. Bhd 2014-11-20 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. gagal dalam pengadaan loji(mesin pengasingan) yang selamat bagi kerja-kerja memasukkan produk PVC ke dalam mesin tersebut. RM5,000.00
MSHK Engineering Sdn Bhd 2014-11-18 Construction Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menyediakan laluan keluar masuk yang selamat. RM30,000.00
Kuala Lumpur Kepong Berhad 2014-11-17 Manufacturing Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menyenlenggara steriliser dan pepasangan selamat. RM8,000.00
Nam Lee Pressed Metal Sdn Bhd 2014-11-12 Manufacturing Seksyen18(1), Akta Kilang dan Jentera1967. Menjalankan Pembaikan Jentera Dengan Tidak Mengikut Peraturan. RM20,000.00
Nam Lee Pressed Metal Sdn Bhd 2014-11-12 Manufacturing Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan latihan dan penyeliaan penyelarasan jentera power press. RM10,000.00
My Tech Global Sdn Bhd 2014-11-10 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 15,000.00
BOUSTEAD PELITA KANOWIT SDN BHD 2014-11-07 Agriculture Per.5(2),Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan,Kejadian Berbahaya,Keracunan Pekerjaan Dan Penyakit Pekerjaan)2004 RM5,000.00
BIHH SDN BHD 2014-11-04 Agriculture Per.5(2),Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan,Kejadian Berbahaya,Keracunan Pekerjaan Dan Penyakit Pekerjaan)2006 RM600.00
BIHH SDN BHD 2014-11-04 Agriculture Per.5(2),Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan,Kejadian Berbahaya,Keracunan Pekerjaan Dan Penyakit Pekerjaan)2005 RM3,000.00
Felda Palm Industries Sdn Bhd 2014-10-31 Manufacturing Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan tempat kerja yang selamat dan prosedur kerja selamat. RM8,000.00
PGEO Edible Oils Sdn Bhd 2014-10-28 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM20,000.00
FPM Sdn Bhd 2014-10-28 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM20,000.00
Mutiara Mahamas Sdn Bhd 2014-10-24 Manufacturing Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan latihan dan penyeliaan bagi kerja-kerja pemindahan barang ke dalam kontena. RM4,000.00
Kong Long Huat Chemicals Sdn. Bhd., 2014-10-17 Manufacturing Peraturan 14(3), CIMAH Gagal menghantar salinan Laporan Aktiviti Industri kepada Ketua Pengarah rm6,000.00
Kong Long Huat Chemicals Sdn. Bhd., 2014-10-17 Manufacturing Peraturan 8, CIMAH gagal mengemukakan pemberitahuan pertukaran kuantiti bahan berbahaya. RM5,000.00
Dayalam Venture Sdn. Bhd 2014-10-17 Quarry Peraturan 5(1)(a)(aa). gagal melaporkan kemalangan RM10,000.00
Dayalam Venture Sdn. Bhd 2014-10-17 Quarry Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. pertuduhan kedua iaitu gagal menyediakan SOP RM3,000.00
Aston Star Sdn Bhd 2014-10-16 Construction Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal membuat perkiraan bagi menjamin keselamatan dan ketiadaan risiko kepada kesihatan pekerjanya. RM15,000.00
Kimlun Sdn Bhd 2014-10-16 Construction Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan penyeliaan untuk memastikan keselamatan dan kesihatan pekerjanya. RM15,000.00
Kek Seng (M) Berhad 2014-10-12 Manufacturing Seksyen17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan sistem kawalan penggunaan forklift RM20,000.00
KERJAYA PROSPEK (M) SDN BHD 2014-10-03 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM5,000.00
FELT & RUGS SDN BHD 2014-10-03 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM5,000.00
Spacious Structure Sdn Bhd 2014-10-01 Construction Sek.29 AKKP 1994 gagal mengambil kerja seorang SHO RM1,800.00
RKVM Maju Resources, 2014-09-29 Construction Seksyen 15(1), AKKP 1994 gagal memastikan external perimeter scaffold working platform selamat digunakan RM20,000.00
HAB Construction Sdn. Bhd., 2014-09-29 Construction Seksyen 15(1), AKKP 1994 gagal mengadakan suatu sistem kerja selamat semasa kerja merombak "crawler crane". RM20,000.00
Syarikat Pembinaan Mak Wong Sdn Bhd 2014-09-28 Construction Seksyen 18, AKKP 1994 Tanggungjawab seorang penghuni tempat kerja kepada orang lain selain pekerjanya RM10,000.00
Syarikat Pembinaan Kian Hing Sdn Bhd 2014-09-28 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM10,000.00
BALFOUR BEATTY ANSLDO SYSTEMS JV SDN BHD 2014-09-26 Construction Seksyen 15(2)(C) Akta Keselamatan Dan Kesihatan Pekerjaan 1994gagal Memastikan Pembuatan Perkiraan Bagi Menjamin Setakat Yg Praktik,Keselamatan & Ketiadaan Risiko Kepada Kesihatan Berkaitan Penggunaan , Pengendalian Dan Pengangkutan Loji Dan Bahan ,Disebabkan Tiada Prosedur Kerja Selamat Yg Ditetapkan Bagi Kerja-Kerja Menaik,Menurunkan Dan Memindahkan Kenderaan Melibatkan Penggunaan Lori Pengangkut. RM12,000.00
Pentas Gaya Sdn Bhd 2014-09-25 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM30,000.00
Aramijaya Sdn Bhd 2014-09-22 Plantation Peraturan 5(1)(a)(aa) NADOPOD , Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal melaporkan kemalangan. 500
CTRM AERO COMPOSITED SDN.BHD 2014-09-18 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan
Syarikat Kemajuan Tanahan Sdn Bhd 2014-09-12 Manufacturing Seksyen18(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan safety line bagi kerja tempat tinggi. RM4,000.00
CUAYINI BTE KUNTAU (650322-12-5426) WAYINI ENTERPRISE 2014-09-12 TeleCommunication SEKSYEN 15 (1) AKKP 1994 Gagal untukmenjalankan tanggungjawab sebagai majikan untuk memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya. RM20,000 @ 6 bln penjara
Kenco Construction Sdn. Bhd., 2014-09-11 Construction Peraturan 5(1)(a)(aa) NODOPOD, AKKP 1994 gagal melaporkan kemalangan dengan serta merta rm3,600.00
Jasmurni Construction Sdn. Bhd., 2014-09-10 Construction Seksyen 17(1), AKKP 1994 mengendalikan kren menara jenis hammer head tanpa perakuan kelayakan RM10,000.00
ALSHEM BINA (M) SDN BHD 2014-09-10 Construction Seksyen 15(2)(C) Akta Keselamatan Dan Kesihatan Pekerjaan 1994 Tiada penyeliaan yang diadakan oleh majikan setakat yang praktik bagi pemakaian PPE pekerja yang melakukan kerja di dalam kawasan tapak bina. RM8,000.00
BATU?BARA RESOURCES CORPORATION SDN BHD 2014-09-10 Construction SEKSYEN 29(2) AKKP 1994 GAGAL MENGAMBIL KERJA SEORANG ORANG KOMPETEN UNTUK BERTINDAK SEBAGAI PEGAWAI KESELAMATAN DAN KESIHATAN (SHO) RM2,000.00
Hang Tuah Sawmill 2014-09-09 Manufacturing Peraturan 5(2) NADOPOD Kemalangan tidak dilaporkan
BRC Prefab Holdings Sdn Bhd 2014-09-09 Manufacturing Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan prosedur kerja selamat untuk mengendalikan jentera TES welding. 15,000.00
Royal Bintang 2014-09-09 Perhotelan Peraturan 5(2) NADOPOD Kemalangan tidak dilaporkan
Awal Mutiara Sdn. Bhd. 2014-09-01 Manufacturing Seksyen 19 (1) AKJ 1967 RM10,000.00
DTP Development S/B 2014-08-24 Construction Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal wujud Sistem Kerja Selamat RM6,000.00
FERROMERGE (M) SDN BHD 2014-08-20 Communication Gagal Memastikan Setakat Yang Praktik, Bahawa Dia Dan Orang-Orang Lain, Yang Bukan Pekerjanya, Yang Mungkin Tersentuh Oleh Perusahaannya Itu Tidak Terdedah Kepada Risiko Kepada Keselamatan Atau Kesihatan Mereka Oleh Sebab Perusahaan Itu Termasuklah Mohd Khairry Bin Abd Hamid Yang Telah Jatuh Dan Maut Di Lurang 4 Akibat Tidak Ada Pemagaran Semasa Aktiviti Penarikan Kabel Fiber, Splicing & Termination Ibu Sawat Tm Kuala Pauh-F14/F15 Hsbb Kpu Taman Desa.
COSMAL MANUFACTURING (M) SDN BHD 2014-08-19 Manufacturing P 5(1)(B)(Aa) & (B)(Bb), Peraturan -Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan 2004.
Bell Palm Industries Sdn Bhd 2014-08-18 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 9,000.00
CSC STEEL SDN BHD 2014-08-14 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan
NANKAI NIKKE (TERENGGANU) SDN. BHD. 2014-08-14 Manufacturing Gagal Untuk Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Dengan Gagal Mengadakan Sistem Kerja Selamat Bagi Kerja-Kerja Penggunaan Mesin "Top Packing Press" Yang Menyebabkan Kemalangan Ke Atas Yan Naing Aung, (No Pasport: Ma 178183) . RM8,000.00
C.E.L Construction Sdn Bhd 2014-08-12 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 20,000.00
Syarikat Pemborong Jayabina Sdn Bhd 2014-08-11 Construction Seksyen17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan susur tangan di tangga No. 5 Blok B. RM10,000.00
Fujitec (M) Sdn Bhd 2014-08-11 Construction Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan tempat kerja yang selamat untuk kerja-kerja pemasangan lif RM 20,000.00
Felda Palm Industries Sdn Bhd (Kahang-Oktober 2014) 2014-08-10 Manufacturing Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan penyelenggaraan keatas pelantar kerja di kawasan "incline conveyor". RM10,000.00
Taisei Corporation Sdn Bhd 2014-08-07 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM15,000.00
Chan Kok Kit Sdn Bhd 2014-08-07 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM15,000.00
Nilai Jasa Sdn Bhd 2014-08-07 Construction Seksyen 17 (1) AKKP 1994 RM10,000.00
Perniagaan Sri SCP 2014-08-07 Manufacturing Peraturan 5(1)(a)(aa) Nadopod 2004. Tak lapor kemalangan RM2,000.00
Mitsui Soko Agencies SB 2014-08-07 Manufacturing Per 5(1)(b)(aa) Nadopod Gagal melaporkan kecederaan yang serius dengan serta-merta RM1,000.00
Mitsui Soko Agencies SB 2014-08-07 Manufacturing Per 5(1)(b)(aa) Nadopod Gagal melaporkan dalam tempoh 7 hari dalam borang yang ditetapkan RM500.00
Mitsui Soko Agencies SB 2014-08-07 Manufacturing Seksyen 15(2)(b) AKKP Gagal memastikan keselamatan kepada pekerjanya RM1,000.00
Shorubber (M) Sdn. Bhd 2014-07-27 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Telah gagal mengemukakan rekod latihan, arahan dan penyeliaan sebagaimana yang perlu untuk memastikan setakat yang praktik keselamatan dan kesihatan pekerjanya yang sedang bekerja khususnya berkaitan penggunaan dan pengendalian jentera `reach truck'yang menyebabkan kemalangan berlaku kepada mangsa. RM10,000.00
PANTAS TECHNOLOGIES SDN BHD 2014-07-24 Construction Seksyen 15(2)(C) Akta Keselamatan Dan Kesihatan Pekerjaan 1994 Tidak Mematuhi Prosedur Kerja Selamat Yang Telah Ditetapkan Iaitu Kerja-Kerja Mengangkat Longkang Konkrit Sehingga Menyebabkan Kemalangan Maut. RM9,000.00
SYARIKAT KYOTO MACHINERY SDN BHD 2014-07-24 Pengangkutan Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994 Gagal Menyediakan Prosedur Kerja Selamat Berkaitan Kerja-Kerja Menaik, Menurun Dan Memindahkan Kenderaan Atau Jentera Melibatkan Penggunaan Lori Pengangkut Sehingga Menyebabkan Kemalangan Maut Berlaku. RM9,000.00
PJD Construction Sdn Bhd 2014-07-22 Construction Per 85 (1)(a) BOWEC RM1,500.00
PJD Construction Sdn Bhd 2014-07-22 Construction Seksyen 29 (1) AKKP RM3,000.00
HYK BINA SDN BHD 2014-07-16 Construction Gagal Mengambil Kerja Seorang Yang Kompeten Sebagai Sho RM2,000.00
POINTACE SDN BHD 2014-07-16 Construction Gagal Mengambil Kerja Seorang Yang Kompeten Sebagai Sho RM2,000.00 @ Penjara 2 bln
CFM MACHINERY & PRINTING 2014-07-16 Manufacturing Gagal Dengan Serta- Merta Memberitahu Pejabat Jabatan Keselamatan Dan Kesihatan Pekerjaan Yang Terdekat Dengan Cara Yang Paling Cepat Yang Ada, Apa- Apa Kemalangan Berbangkit Daripada Atau Berkaitan Dengan Kerja Yang Menyebabkan Baskar A/L Subramaniam (No. Kad Pengenalan: 771212-08-6447) Mengalami Kecederaan Badan Yang Serius RM2,500.00 @ Penjara 2 bln
Tebrau Bay Construction Sdn Bhd 2014-07-15 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 10,000.00
Borneo Samudera Sdn Bhd 2014-07-03 Plantation Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya yang mana telah menyebabkan kematian. RM12,000.00
Kerjaya Prospek Sdn Bhd 2014-06-25 Construction Peraturan 74 (2) BOWEC Gagal mempastikan pemeriksaan oleh orang yang ditetapkan bagi bahan yang digunakan untuk pembinaan perancah. RM2,000.00
Kerjaya Prospek Sdn Bhd 2014-06-25 Construction Peraturan 55(2) BOWEC Gagal mengadakan jaring keselamatan dan mengadakan saiz dan keteguhan yang mencukupi untuk menahan mana-mana orang RM2,000.00
Kerjaya Prospek Sdn Bhd 2014-06-25 Construction Peraturan 51(2) BOWEC Gagal mengadakan tali pinggang keledar hendaklah disangkut kepada tali nyawa yang disangkut dengan kukuh RM2,000.00
SLT GENERAL CONTRACTOR SDN. BHD. 2014-06-18 Perlombongan Gagal Dengan Serta-Merta Memberitahu Pejabat Jabatan Keselamatan Dan Kesihatan Pekerjaan Yang Terdekat Dengan Cara Paling Cepat Yang Ada, Suatu Kemalangan Berkaitan Kerja Yang Melibatkan Kemalangan Maut Ke Atas Chai Guo Hua (Nombor Kad Pengenalan: 950530-04-5249) Yang Telah Berlaku Pada 18 Februari 2014. RM4,000.00
Siraga Sdn Bhd 2014-06-06 Manufacturing Seksyen15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan cara kerja yang selamat untuk kerja-kerja penukaran tong-tong selinder LPG 50kg. RM15,000.00
Timatch Sdn Bhd (Loji Rawatan Air Utara) 2014-06-01 Kemudahan Air Per.22, P.U.(A) 39/1996 Gagal membekalkan maklumat seperti di dalam jadual 3 kepada orang di luar tapak RM2000 @2 BULAN
Timatch Sdn Bhd (Loji Rawatan Air Utara) 2014-06-01 Kemudahan Air Per.14, P.U.(A) 39/1996 Gagal menghantar salinan laporan aktiviti industri kepada Ketua Pengarah RM2000 @ 2 BULAN
Timatch Sdn Bhd (Loji Rawatan Air Utara) 2014-06-01 Kemudahan Air Per.18, P.U.(A) 39/1996 Gagal menyedia dan mengemukakan pelan kecemasan tapak kepada Ketua Pengarah RM2000 @ 2 BULAN
Central Forte Construction Sdn.Bhd. 2014-05-30 Construction Seksyen 17(1) AKKP Tiada sistem kerja selamat bagi kerja-kerja merombak formwork RM25,000.00
A.F.A Plumber Construction Sdn Bhd 2014-05-29 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 30,000.00
PJD Construction Sdn Bhd 2014-05-29 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 40,000.00
PGEO Edible Oils Sdn Bhd 2014-05-29 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 40,000.00
Johor Port Berhad 2014-05-28 Lain-lain Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 10,000.00
Mobile Pacific Sdn Bhd 2014-05-28 Lain-lain Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM8,000.00
Pembinaan Effectcon Sdn Bhd 2014-05-27 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 10,000.00
Choon (M) Technologies Sdn Bhd 2014-05-27 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 10,000.00
Al-Ambia Sdn Bhd 2014-05-27 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan Tiada Prima Facie
HSB Industrial Sdn Bhd 2014-05-27 Manufacturing Seksyen 32, AKKP 1994 Gagal melaporkan kemalangan RM5,000.00
Johor Bahru Flour Mill Sdn Bhd 2014-05-27 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 10,000.00
SP Tube Ice Enterprise Sdn Bhd 2014-05-25 Manufacturing Per 9(1) Peraturan Pendedahan Bising 1989 Gagal menjalankan pemonitoran awal bunyi bising RM 500.00
MAJU SINAR NETWORK SDN BHD 2014-05-14 Perhutanan SEKSYEN 15 (2) ( c )Sebagai majikan telah gagal memastikan setakat yang praktik iaitu gagal menjalankan penyeliaan untuk memastikan pemeriksaan rapi telah dibuat untuk mengenalpasti tidak wujud bahaya sebelum kerja penebangan dijalankan. RM25,000.00 or 6 bln penjara
Kilang Sawit Jengka 3 (Felda Palm Industries Sdn Bhd) 2014-05-09 Manufacturing Seksyen 17 AKKP 1994 RM8,000.00
Segi Realty Sdn. Bhd. 2014-05-06 Construction Peraturan 5(1)(a)(aa) NODOPOD, AKKP 1994 gagal melaporkan kemalangan dengan serta merta RM1,200.00 @ 2 bulan
Jepsum Aluminium Sdn. Bhd., 2014-05-06 Manufacturing Sek. 19(1) Akta Kilang dan Jentera 1967 mengendalikan Overhead Travelling Crane (OTC) tanpa perakuan kelayakan RM11,000.00
Gabbro Precision Asia Sdn Bhd 2014-04-30 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 20,000.00
Kining Exeton 2014-04-24 Construction Seksyen 29 AKKP 1994 RM2,000.00
KFC SABAH SDN BHD 2014-04-22 Hotel Dan Restoran Peraturan 5 (1) (Bb) Nadopod Gagal Dalam Masa 7 Hari Menghantar Laporan Tentang Kemalangan Dalam Borang Yang Diluluskan. RM5,000.00
KFC SABAH SDN BHD 2014-04-22 Hotel Dan Restoran Peraturan 5(1)(Aa) Nadopod Gagal Dengan Serta Merta Memberitahu Pejabat Jkkp Yang Terdekat Dengan Cara Yang Palinc Cepat Yang Ada. RM5,000.00 @ 3 bln penjara
KCC Industries (M) Sdn Bhd 2014-04-22 Manufacturing Seksyen 32, AKKP 1994 Gagal melaporkan kemalangan RM1,000.00
Berjaya (Batu Pahat) Sdn Bhd 2014-04-21 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 15,000.00
Dyson Manufacture Sdn Bhd 2014-04-16 Manufacturing Seksyen32(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal melaporkan kemalangan RM1,000
NCT Building & Civil Engineering Sdn. Bhd., 2014-04-14 Construction Seksyen 15(1), AKKP 1994 gagal membuat penyeliaan ke atas kerja mengangkat kren menara RM8000 @ 2 bulan
Hong Leong Yamaha Motor Sdn. Bhd. 2014-04-14 Manufacturing Peraturan 27(3), USECHH Reg. gagal untuk mengadakan pengawasan perubatan kepada pekerja yang terdedah kepada BKBKK yang disenaraikan dalam Jadual II iaitu N-Hexane RM2000 @ 1 bulan
Raptor Resources Sdn Bhd 2014-04-10 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab sebagai majikan RM 10,000.00
Julung Cipta Sdn Bhd 2014-04-10 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab sebagai majikan RM8,000.00
Felda Palm Industries Sdn Bhd 2014-04-10 Manufacturing Seksyen 17, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 7,000.00
EARTH TECHNOLOGY SDN BHD 2014-04-03 Construction Peraturan 9,Nadopod 2004 RM3,500.00
Norsechem Resins Sdn. Bhd. 2014-04-03 Manufacturing Sek. 19(1) Akta Kilang dan Jentera 1967 mengendalikan steam header tanpa perakuan kelayakan RM15,000.00
KING HONG STEEL S/B 2014-04-03 Manufacturing Seksyen 29 Osha 1994 Kegagalan Pihak Majikan RM4,000.00
Hau Fatt Timber 2014-03-30 Manufacturing Peraturan 5(1)(b)(bb) Nadopod 2004. Tak lapor kemalangan RM1,000.00
Toto (M) Sdn Bhd 2014-03-27 Manufacturing Pertuduhan: Seksyen 29(2) OSHA Tiada SHO yang kompeten RM3,000
T.H. Home Hin Sdn Bhd 2014-03-27 Manufacturing Seksyen 29(1) AKKP 1994 Tiada Pegawai Keslemaatan dan Kesihatan RM1000
T. H. Home Hin Sdn Bhd 2014-03-27 Manufacturing Peraturan 5(1)(b)(bb) Nadopod Gagal melaporkan kcederaan badan yang serius dalam tempoh 7 hari RM2,000.00
T.H. Home Hin Sdn Bhd 2014-03-27 Manufacturing Peraturan 5(1)(b)(aa) Nadopod Gagal melaporkan kecederaan badan yang serius dengan serta-merta RM1,000.00
Timur Oil Palm Sdn Bhd 2014-03-26 Agriculture Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM13,000
Timur Oil Palm Sdn Bhd 2014-03-26 Agriculture Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM15,000
Mutiara Raya Corporation Sdn Bhd 2014-03-26 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab sebagai majikan RM 10,000
Hitachi Koki (M) sdn Bhd 2014-03-26 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab sebagai majikan RM 10,000
Superfood Specialist Sdn Bhd 2014-03-25 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM40,000.00
South Pacific Chemical Industries Sdn Bhd 2014-03-25 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 10,000.00
UNIANG PLASTIC INDUSTRIES (SABAH) SDN BHD 2014-03-25 Manufacturing Peraturan 5(2)Peraturan-Peraturan Kkp (Nadopod) Per.13 Gagal Menghantar Laporan Tentang Kemalangan Yang Melibatkan Pekerja Bernama Chin Pang Ho RM1000 @ 1 bln Penjara
Malconrep Dept (M) Sdn. Bhd. 2014-03-20 Manufacturing Peraturan 5(1)(a)(aa) NODOPOD, AKKP 1994 gagal melaporkan kemalangan dengan serta merta RM3000 @ 2 bulan
Ahmad Zaki Sdn. Bhd., 2014-03-19 Construction Seksyen 49(1) AKKP, 1994 melanggar notis larangan yang dikeluarkan ke atas penggunaan perancah RM20000 @ 6 bulan
KOH LEK CONSTRUCTION & RENOVATION SDN. BHD. 2014-03-17 Construction Gagal Untuk Menjalankan Pengusahaannya Dengan Cara Memastikan, Setakat Yang Praktik, Bahawa Orang-Orang Lain, Yang Bukan Pekerjanya, Yang Mungkin Tersentuh Oleh Pengusahaannya Itu Tidak Terdedah Kepada Risiko Kepada Keselamatan Dan Kesihatan Mereka Oleh Sebab Pengusahaannya Dengan Gagal Menyediakan Tempat Kerja Yang Selamat Dan Tanpa Risiko Kepada Keselamatan Sehingga Menyebabkan Kemalangan Ke Atas Md Asraful (Nombor Pasport: B1011400). RM5,000.00
Masterfoam Industries Sdn. Bhd., 2014-03-14 Manufacturing Peraturan 5(1)(b)(bb) NODOPOD, AKKP 1995 gagal melaporkan kemalangan dan hantar laporan dalam masa 7 hari. RM2000 @ 14 hari
Pan Concept Technology Sdn. Bhd. 2014-03-13 Manufacturing Peraturan 9(1), Peraturan-Peraturan Kilang dan Jentera (Pendedahan Bising) 1989, AKJ 1967 gagal menjalankan pemonitoran pendedahan awal bising RM500.00
Masterfoam Industries Sdn. Bhd., 2014-03-13 Manufacturing Peraturan 5(1)(b)(aa) NODOPOD, AKKP 1994 gagal melaporkan kemalangan dengan serta merta RM2000@ 14 hari
Harn Lern Corporation Berhad (Kilang Sawit) 2014-03-12 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM15,000.00
Flexiworld Sdn Bhd 2014-03-11 Construction Seksyen 17(1) AKKP Gagal memastikan keselamatan kepada orang lain selain pekerjanya RM10,000.00
SYARIKAT AZAM SEPADU ENTERPRISE 2014-03-10 Perkhidmatan Pembersihan Bangunan Seksyen 30(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 Tidak menubuhkan jawatankuasa keselamatan dan kesihatan di tempat kerja RM1,000.00
Care Glove Sdn Bhd 2014-03-08 Manufacturing Peratuan 5 , Nadopod(5(1)(b)(aa)(bb) . Tidak Melaporkan kemalangan HUK RM2,000.00
GEMA KUKUH SDN BHD 2014-03-06 Construction Seksyen 29(2) Akkp 1994 Gagal Mengambil Kerja Seorang Orang Kompeten Untuk Bertindak Sebagai Pegawai Keselamatan Dan Kesihatan (Sho) RM2,000.00
SYARIKAT KILANG PADI MAJU SDN BHD 2014-03-06 Manufacturing Peraturan 79(1), Peraturan-Peraturan (Dandang Stim Dan Pengandung Tekanan Tak Berapi ) Kilang Dan Jentera 1970 Tidak Pernah Mendapatkan Kebenaran Pemeriksa Terlebih Dahulu Daripada Pihak Jkkp Berkaitan Kerja-Kerja Membaiki Dan Membaikpulih Dandang Air Panas Kdpmd 200. RM400.00
Fujikura (M) Sdn. Bhd. 2014-03-06 Manufacturing Seksyen 15(1), AKKP 1994 seorang pekerja maut semasa ujian kebocoran terhadap annealer pot dijalankan RM10000 @ 4 bulan
Nadi Cergas Sdn Bhd 2014-03-04 Construction Peraturan 88(1) BOWEC, AKJ 1986 RM1,500.00
TECK GUAN STEEL SDN BHD 2014-03-04 Manufacturing Peraturan 5(2) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan(Nadopod)Per.13 Gagal Memberitahu Dan Melaporkan Kemalangan Yang Berlaku Terhadap Januarius Gacobus Dalam Borang Yang Diluluskan Kepada Pejabat Jkkp Terdekat RM5000 or 5 bln penjara
SERI IBAI ENTERPRISE SDN. BHD. 2014-03-03 Construction Gagal Untuk Menjalankan Pengusahaannya Dengan Cara Memastikan, Setakat Yang Praktik, Bahawa Orang-Orang Lain, Yang Bukan Pekerjanya, Yang Mungkin Tersentuh Oleh Pengusahaannya Itu Tidak Terdedah Kepada Risiko Kepada Keselamatan Dan Kesihatan Mereka Oleh Sebab Pengusahaannya Itu Dengan Gagal Menyediakan Tempat Kerja Yang Selamat Dan Tanpa Risiko Kepada Keselamatan Sehingga Menyebabkan Kemalangan Ke Atas Jusoh Bin Mohamad (Nombor Kad Pengenalan: 621214-11-5025). RM6,000.00
NAFAS PERMATA SDN. BHD. 2014-03-03 Construction Gagal Dengan Serta-Merta Memberitahu Pejabat Jabatan Keselamatan Dan Kesihatan Pekerjaan Yang Terdekat Dengan Cara Paling Cepat Yang Ada, Suatu Kemalangan Berkaitan Kerja Yang Melibatkan Kecederaan Badan Yang Serius Ke Atas Jusoh Bin Mohamad (Nombor Kad Pengenalan: 621214-11-5025) Yang Telah Berlaku Pada 22 Oktober 2013. RM3,000.00
NAFAS PERMATA SDN. BHD. 2014-03-03 Construction Gagal Dalam Masa Tujuh (7) Hari Menghantar Laporan Tentang Kemalangan Dalam Borang Yang Diluluskan, Suatu Kemalangan Berkaitan Kerja Yang Melibatkan Kecederaan Badan Yang Serius Ke Atas Jusoh Bin Mohamad (Nombor Kad Pengenalan: 621214-11-5025) Yang Telah Berlaku Pada 22 Oktober 2013. RM3,000.00
KARYAN KHAS ENTERPRISE 2014-03-03 Perhutanan Gagal Untuk Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Dengan Gagal Mengadakan Sistem Kerja Selamat Bagi Kerja-Kerja Penebangan Pokok Yang Menyebabkan Kemalangan Maut Ke Atas Ahmad Bin Adam (Nombor Kad Pengenalan: 690609-71-5411). RM10,000.00
NS CEMENT Indsutries SB 2014-03-01 Manufacturing Peraturan 5(1)(bb) NADOPOD Tidak lapor kemalangan dalam tempoh 7 hari RM6,600.00
STAR PUBLICATION 2014-02-27 perkhimatan perniagaan Seksyen 15(1), AKKP 1994 gagal menjalankan penaksiran risiko bagi kerja-kerja di kawasan real stand sehingga menyebabkan kemalangan maut
Kampong Kuantan Palm Oil Mill Berhad, 2014-02-26 Manufacturing Peraturan 5(2) NODOPOD, AKKP 1994 OKS gagal melaporkan kepada jabatan berkaitan kemalangan yang menyebabkan mangsa mendapat cuti sakit selama 83 hari RM6,000 @ 2 bulan
LTS UTAMA BINA SDN. BHD 2014-02-24 Construction Gagal Menyerahkan Kepada Pemeriksa Notis Bertulis Dalam Bentuk Yang Ditetapkan Dalam Tempoh Tidak Lebih Tujuh Hari Daripada Permulaan Operasi Pembinaan Berkenaan. RM3,000.00
Winsome Harvest Palm Oil Mill Sdn Bhd 2014-02-24 Manufacturing Sek.15(1) AKKP 1994 Gagal memastikan setakat yang praktik keselamatan semasa bekerja semua pekerja iaitu dengan tidak menjalankan penyeliaan sebagai mana perlu untuk memastikan pekerja yang sedang bekerja. RM8,000 @ 2 bln penjara
Winsome Harvest Palm Oil Mill Sdn Bhd 2014-02-24 Manufacturing Sek.29(1) AKJ 1967 Gagal memastikan dandang stim yang ditetapkan di bawah jagaan seorang jurutera yang berperakuan. RM5,000 @ 1 Bln Penjara
Bengkel Ulu Jempol (Felda Palm Industries Sdn Bhd) 2014-02-21 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM5,000.00
unicosteel Sdn. Bhd., 2014-02-20 Manufacturing Peraturan 9(1), Peraturan-Peraturan Kilang dan Jentera (Pendedahan Bising) 1989, AKJ 1967 gagal menjalankan pemonitoran pendedahan awal bising RM500 @ 1 bulan
Kilang Sawit Lembing Sdn Bhd 2014-02-18 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM10,000.00
Berjaya Steel product Sdn.Bhd 2014-02-13 Manufacturing Pertuduhan: Seksyen 15(1) OSHA Gagal Memastikan setakat praktik keselamatan pekerja menyebabkan selain pekerja itu tidak hilang upaya kekal RM 20,000.00
C-Pak Cergas Sdn Bhd 2014-02-13 Manufacturing Pertuduhan: Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994 Gagal memastikan setakat yang praktik keselamatan pekerja semasa bekerja dengan tidak menyediakan latihan untuk mengendalikan jentera feeder screw. Mengakibatkan putus bahagian atas jari telunjuk tangan kanan mangsa. RM15,000.00
SYARIKAT PEMBINAAN YUEN SENG SDN BHD 2014-02-10 Construction Gagal Menyediakan Rel Pengadang Yang Cukup Kuat Walaupun Telah Diberi Arahan Sebelumnya RM1000 @ Penjara 1 bln
PANJI BERSATU SDN BHD 2014-02-10 Construction Gagal Mengambil Kerja Seorang Yang Kompeten Sebagai Sho RM1800 @ Penjara 1 bln
MUINN COMM SDN BHD 2014-02-10 Communication Gagal Memastikan Setakat Yang Praktik Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Pekerjanya Yang Telah Maut Akibat Tergelincir Dan Terpaut Tangannya Pada Wayar Yang Mempunyai Arus Elektrik Tangga Yang Digunakan Daripada Semasa Kerja Pemasangan Kabel Unifi. RM3500 @ PENJARA 3 Bln
Chin Teck Plantation Bhd 2014-02-07 Agriculture Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM2200
Tebrau Bay Construction Sdn Bhd 2014-02-07 Construction Seksyen 32, AKKP 1994 Gagal melaporkan kemalangan RM3,000
Agro Base Trading Sdn Bhd 2014-02-07 Construction Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 8,000
Ultra-Bina Sdn Bhd 2014-01-30 Construction Peraturan 5(1)(a)(bb) Nadopod Gagal melaporkan kemalangan maut Augustine a/l Anthony dalam tempoh 7 hari dalam borang yang ditetapkan RM5000.00
Ultra-Bina Sdn Bhd 2014-01-30 Construction Peraturan 5(1)(a)(aa) Nadopod Gagal melaporkan kemalangan maut Augustine a/l Anthony dengan serta-merta RM5000
Ultra-Bina Sdn Bhd 2014-01-30 Construction Seksyen 15(1)AKKP Gagal mengadakan pengenalpastian bahaya, analisa risiko dan kawalan risiko RM20,000
Zubicon Sdn Bhd 2014-01-22 Construction Peraturan 5(1)(a)(aa) Nadopod Gagal melaporkan kemalangan maut dengan serta-merta RM1000.00
Zubicon Sdn Bhd 2014-01-22 Construction Seksyen 17(1) AKKP Gagal mengadakan kawalan pintu masuk kepada pekerja dan bukan pekerjanya RM5000.00
Pertubuhan Peladang Negeri Johor 2014-01-22 Plantation Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM 10,000.00
SHOUGANG(M) INTERNATIONAL SDN BHD 2014-01-20 Construction Gagal Melaksanakanprosidur Kerja Selamat Yang Telah Ditetapkan Bagi Kerja-Kerja Yang Dijalankan Di Tempat Tinggi Sehingga Menyebabkan Kematian Zoir Ahmad Bin Sobi Dullah (No Rujukan Kad Unhcr: 354-09c04924) RM7000.00
AWAN TIMUR KLUANG SDN. BHD. 2014-01-20 Manufacturing Gagal Mengadakan Sistem Kerja Selamat Bagi Kerja-Kerja Pembinaan Dan Penyelenggaraan Mesin ?Empty Bunch Conveyor No.4? Yang Menyebabkan Kemalangan Maut Ke Atas Mohammad Bistari Bin Bistamam (Nombor Kad Pengenalan: 860618-59-5131). RM8000.00
KILANG SAWIT PANJI ALAM SDN. BHD. 2014-01-20 Manufacturing Gagal Untuk Menjalankan Pengusahaannya Dengan Cara Memastikan, Setakat Yang Praktik, Bahawa Orang-Orang Lain, Yang Bukan Pekerjanya, Yang Mungkin Tersentuh Oleh Pengusahaannya Itu Tidak Terdedah Kepada Risiko Kepada Keselamatan Dan Kesihatan Mereka Oleh Sebab Pengusahaannya Itu Dengan Gagal Menyediakan Tempat Kerja Yang Selamat Dan Tanpa Risiko Kepada Keselamatan Sehingga Menyebabkan Kemalangan Maut Ke Atas Mohammad Bistari Bin Bistamam (Nombor Kad Pengenalan: 860618-59-5131). RM7000.00
Top Glove Sdn. Bhd. 2014-01-16 Manufacturing Peraturan 8, CIMAH gagal mengemukakan pemberitahuan pertukaran kuantiti bahan berbahaya gagal membuktikan prima facie kes
Sunshine Construction Sdn. Bhd., 2014-01-08 Construction Peraturan 5(1)(b)(bb) NODOPOD, AKKP 1995 gagal melaporkan kemalangan serta merta RM1300 @ 1 bulan
Sunshine Construction Sdn. Bhd. 2014-01-08 Construction Peraturan 5(1)(b) (bb) NODOPOD, AKKP 1994 gagal menghantar laporan kemalangan dalam masa 7 hari RM1200 @ 1 bulan
Xin Guang Premier 2014-01-07 Manufacturing Seksyen17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan penyeliaan untuk kerja-kerja pemunggahan barang menggunakan jentera pengangkat "staker". 10,000.00
UNITED DETERGENT INDUSTRIES SDN BHD 2014-01-04 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab majikan RM2000 @ 2 Bulan
SYARIKAT SUNRISE KINARUT TRADING SDN BHD 2014-01-04 Manufacturing Peraturan 5(1) (A), Peraturan Kkp (Nadopod) Per 13 gagal Memberitahu Dan Melaporkan Kemalangan Yang Melibatkan Kematian Kepada Jkkp RM3000 @ 1 bln Penjara
Ladang Tereh Selatan 2013-12-19 Plantation Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab sebagai majikan RM 20,000
DEE SEING CRANE SERVICES SDN. BHD. 2013-12-12 Perkhidmatan jentera kren Peraturan 5(1)(b)(aa) dan (bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. . Sebagai majikan telah gagal untuk membuat pemberitahuan kepada pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan tentang kemalangan yang berlaku. RM 3,000.00 atau 3 bulan penjara
OCEANCASH NONWOVEN SDN. BHD. 2013-12-10 Manufacturing Peraturan 5(2), NADOPOD,2004 . Sebagai majikan telah gagal dalam masa tujuh hari menghantar laporan kepada pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan tentang kemalangan yang berlaku. RM 1,500.00 atau 4 bulan penjara
APM CLIMATE CONTROL SDN. BHD. 2013-12-05 Manufacturing Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Majikan gagal mengadakan sistem kerja selamat bagi kerja-kerja menukar dan memasang bumbung baru sehingga menyebabkan kemalangan maut. RM 10,000.00 atau 3 bulan penjara
IJM CONSTRUCTION SDN. BHD. 2013-11-28 Construction Seksyen 17(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994 . Gagal memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan bukan sahaja pekerjanya tetapi juga orang-orang lain yang bukan pekerjanya semasa melakukan aktiviti pekerjaan dengan gagal mengadakan Sistem Kerja Selamat bagi kerja-kerja pengorekan bagi membina retaining wall. RM 20,000.00 atau 2 bulan penjara
IPCOS ENGINEERING SDN. BHD. 2013-11-28 Construction Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994 . Gagal memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya dengan gagal mengadakan Sistem Kerja Selamat bagi kerja-kerja pengorekan bagi membina retaining wall. RM 12,000.00 atau 2 bulan penjara
MAY CHEMICAL SDN. BHD. 2013-11-25 Manufacturing Seksyen 19(1) Akta Kilang dan Jentera 1967. . Majikan telah menyebabkan atau membenarkan supaya dikendalikan sebuah jentera mesin angkat iaitu Electric Overhead Crane tanpa mempunyai perakuan kelayakan yang sah yang dikeluarkan dibawah Akta Kilang dan Jentera 1967. RM 8,000.00 atau 6 bulan penjara
TRIENTEL INDUSTRIES SDN. BHD. 2013-11-21 Construction Peraturan 5(1)(b)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. - RM 3,000.00 atau 1 bulan penjara . . 5(1)(b)(bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. - RM 3,000.00 atau 1 bulan penjara . . Majikan telah gagal untuk melaporkan kemalangan maut yang berlaku di tapak pembinaan.
PROMINENT IMAGE SDN. BHD. 2013-11-21 Manufacturing Peraturan 5(1)(b)(aa) dan (bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. . Majikan telah gagal untuk melaporkan kemalangan di tempat kerja yang menyebabkan mangsa mengalami kecederaan serius pada tangan akibat tersepit pada 'rod puncher machine'. RM 1,600.00 atau 1 bulan penjara
YOUNG MAN DEVELOPMENT (M) SDN. BHD. 2013-11-11 Manufacturing Peraturan 5(1)(b)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. - RM 2,500.00 atau 4 bulan penjara . . 5(1)(b)(bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. - RM 2,500.00 atau 4 bulan penjara . . Majikan telah gagal untuk melaporkan kemalangan di tempat kerja dimana mangsa mengalami kecederaan serius pada tangan akibat tersepit pada 'power press machine'.
SYARIKAT SINAR TIGA SDN. BHD. 2013-11-06 Manufacturing Seksyen 19(1) Akta Kilang dan Jentera 1967 . Majikan telah mengendalikan/ membenarkan dikendalikan monkey hoist tanpa mempunyai perakuan kelayakan yang sah yang dikeluarkan di bawah Akta Kilang dan Jentera 1967. RM 5,000.00
PREMIER OIL INDUSTRIES SDN. BHD. 2013-10-24 Manufacturing Peraturan 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. . Majikan telah gagal untuk memastikan setakat yang praktik keselamatan, kesihatan dan kebajikan dua orang pekerja dengan tidak menyediakan Sistem Kerja Selamat untuk kerja pemotongan dan penyambungan paip. RM 4,000.00 atau 6 bulan penjara
Sunway Construction Sdn Bhd 2013-08-21 Construction Seksyen 17, AKKP1994 Gagal menjalankan tanggungjawab sebagai majikan Tiada Prima Facie
WINGTAT PACKAGING SDN. BHD. 2013-06-25 Manufacturing Peraturan 9, Peraturan-Peraturan Kilang Dan Jentera (Pendedahan Bising) 1989 . Penghuni hendaklah menjalankan pemonitoran pendedahan awal menurut peraturan 8 dalam masa enam(6) bulan dari tarikh Peraturan- Peraturan ini mula berkuatkuasa. RM 500.00
CYCLEWORLD CORPORATION SDN. BHD. 2013-06-06 Manufacturing Seksyen 19(1) Akta Kilang dan Jentera, 1967. . Majikan telah mengendalikan jentera air compressor (No. Siri: 0244-564) tanpa mempunyai perakuan kelayakan yang sah yang dikeluarkan di bawah Akta Kilang dan Jentera 1967. RM 5,000.00
KYODO STEEL SDN. BHD. 2013-06-06 Manufacturing Peraturan 9, Peraturan-Peraturan Kilang dan Jentera (Pendedahan Bising) 1989. . Penghuni hendaklah menjalankan pemonitoran pendedahan awal menurut peraturan 8 dalam masa enam(6) bulan dari tarikh Peraturan- Peraturan ini mula berkuatkuasa. RM 500.00
USINKA ENGINEERING SDN. BHD. 2013-06-06 Manufacturing Peraturan 5(1)(b)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. - RM 2,500.00 atau 3 bulan penjara . . 5(1)(b)(bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. -Tarik Balik. . Majikan telah gagal untuk melaporkan kemalangan di tempat kerja yang menyebabkan mangsa mengalami kecederaan serius pada tangan iaitu putus jari telunjuk, jari tengah dan jari manis akibat tersepit pada 'bending machine'.
ESTEROL SDN. BHD. 2013-05-16 Manufacturing Peraturan 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. . Majikan gagal untuk meletakkan sebarang tanda amaran pada punca elektrik (suis utama dan emergency stop button) sehingga menyebabkan kemalangan semasa kerja-kerja pembersihan mesin Screw Feeder 2. RM 5,000.00
KHOO NEE YEW CONSTRUCTION 2013-04-23 Construction Seksyen 35(1) Akta Kilang Dan Jentera 1967. . Majikan gagal menyampaikan suatu notis bertulis dalam bentuk yang ditetapkan kepada Pemeriksa. RM 5,000.00 atau 1 bulan penjara
Camel Foam Industries Sdn. Bhd. 2013-04-17 Manufacturing Peraturan 5(2), Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan), 2004

Jabatan telah menerima aduan mengenai mangsa berkaitan kemalangan yang tidak dilaporkan oleh pihak OKS. Hasil siasatan mendapati bahawa mangsa yang bekerja sebagai Laminating Supervisor telah terjatuh daripada ketinggian 20 kaki dan diberikan cuti sakit selama 16 hari. Semakan data di dalam SMBF2 menunjukkan tiada pemberitahuan kemalangan telah dihantar kepada jabatan oleh pihak OKS.

RM 4,000.00
Trisen Manufacturing Sdn. Bhd. 2013-04-17 Manufacturing Seksyen 19(1), Akta Kilang dan Jentera, 1967

Jabatan telah menerima aduan bahawa syarikat OKS mempunyai jentera yang beroperasi tanpa mempunyai Sijil Perakuan Kelayakan yang sah. Setelah sisatan dibuat, didapati pihak OKS telah memiliki dan mengendalikan Overhead Travelling Crane (No. Siri: 5107214) tanpa mempunyai Sijil Perakuan Kelayakan yang sah.

RM 2,000.00
CAMEL FOAM INDUSTRIES SDN. BHD. 2013-04-17 Manufacturing Peraturan 5(2) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. . Majikan telah gagal dalam masa tujuh hari menghantar laporan tentang kemalangan atau kejadian berbahaya di dalam borang yang diluluskan tentang kemalangan berkaitan dengan kerja yang menyebabkan mangsa mengalami kecederaan badan yang menghalang beliau daripada mengikuti pekerjaan biasanya selama lebih empat hari kalendar. RM 4,000.00 atau 6 bulan penjara
TRISEN MANUFACTURING SDN. BHD. 2013-04-17 Manufacturing Seksyen 19(1) Akta kilang dan Jentera 1967. . Majikan telah mengendalikan jentera Overhead Travelling Crane tanpa mempunyai perakuan kelayakan yang sah yang dikeluarkan di bawah Akta Kilang dan Jentera 1967. RM 2,000.00 atau 3 bulan penjara
NAKAGAWA RUBBER INDUSTRIES SDN. BHD. 2013-04-04 Manufacturing Seksyen 17(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. . Majikan telah gagal untuk mengadakan suatu sistem kerja selamat yang praktik dan tanpa risiko bagi aktiviti pengendalian dan kawalan di mesin Kneader 2 menyebabkan satu kemalangan maut telah berlaku. RM 7,000.00 atau 3 bulan penjara
Mahkota Technology Sdn. Bhd. 2013-03-20 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Seorang pekerja warga tempatan telah maut akibat dihempap oleh forklift. Forklift yang ditumpang oleh mangsa telah terlanggar lubang dan menyebabkan ianya hilang kawalan dan mangsa telah terjatuh daripada forklift. Keadaan forklift yang tidak stabil menyebabkan ia terangkat dan menimpa mangsa. Hasil siasatan,majikan telah gagal setakat yang praktik untuk mengadakan sistem kerja selamat berhubung penggunaan forklift yang merangkumi elemen kawalan terhadap pengendalian forklift tersebut. RM 15,000.00
MAHKOTA TECHNOLOGY SDN. BHD. 2013-03-20 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Sebagai majikan telah gagal memastikan setakat yang praktik keselamatan, kesihatan dan kebajikan semasa bekerja iaitu dengan tidak mengadakan suatu sistem kerja selamat penggunaan Forklift yang merangkumi kawalan terhadap penggunaan Forklift. RM 15,000.00 atau 3 bulan penjara
SYCAL BERHAD 2013-03-18 Construction Peraturan 5(1)(b)(aa)Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. . 5(1)(b)(bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. . Majikan telah gagal untuk melaporkan kejadian berbahaya yang melibatkan mesin tanam cerucuk telah terbalik di tapak pembinaan. RM 1,000.00 atau 10 bulan penjara . RM 1,500.00 atau 14 bulan penjara
WESTPORTS MALAYSIA SDN. BHD. 2013-03-14 Pelabuhan Seksyen 19(1) Akta Kilang dan Jentera 1967 . Majikan telah mengendalikan/membenarkan pengendalian jentera Quay Crane (QC 31) tanpa mempunyai perakuan kelayakan yang sah yang dikeluarkan di bawah Akta Kilang dan Jentera 1967. RM 35,000.00
Bina Mahasil Sdn. Bhd. 2013-03-06 Construction Seksyen 17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994.. Satu kemalangan maut telah berlaku pada 13/08/2011 di tapak pembinaan di Lot 44393-44540, Perdana Lakeview West, Zone Flagship Cyberjaya. Seorang pekerja warganegara Myanmar. Iaitu Phun Chum (No. Pasport: 791-10C01356) telah meninggal akibat tertimbus semasa menjalankan kerja-kerja pemasangan kabel TNB di dalam parit sedalam lebih kurang 10 kaki.Rakan sekerja mangsa turut mengalami kecederaan akibat dihempap batu dan tanah runtuh. RM 10,000.00
BINA MAHASIL SDN. BHD. 2013-03-06 Construction Peraturan 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. . Adalah menjadi kewajipan tiap-tiap majikan dan tiap-tiap orang yang bekerja sendiri untuk menjalankan pengusahaannya dengan cara memastikan, setakat yang praktik, bahawa dia dan orang-orang lain, yang bukan pekerjanya, yang mungkin tersentuh oleh pengusahaan itu tidak terdedah kepada risiko kepada keselamatan atau kesihatan mereka oleh sebab pengusahaan itu. RM 10,000.00
SNB Testing Supervising Services 2013-02-20 Utiliti Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994

Hasil daripada siasatan ke atas tempat kejadian di atas didapati telah berlaku kemalangan yang melibatkan kecederaan badan yang serius pada 10 Mac 2012 melibatkan seorang pelatih industri bagi Sub-Kontraktor ang cedera parah akibat terkena lampu kilat (flashover). Mangsa yang ditugaskan untuk menjalankan kerja-kerja penyelenggaraan vacuum circuit breaker K1 sehingga K6 telah terkena lampau kilat pada panel K6 yang masih berada dalam keadaan bervoltan. Pemeriksaan di tempat kejadian mendapati kegagalan pihak majikan mengadakan penyeliaan orang kompeten bagi kerja-kerja penyelenggaraan ke atas kerja-kerja penyelenggaraan Pencawang Pembahagian Utama 33/11KV sehingga mangsa boleh terkena lampau kilat menyebabkan melecur teruk pada keseluruhan anggota badan.

RM 20,000.00
T.S.S Metal Industry (M) Sdn Bhd 2012-12-27 Manufacturing Peraturan 34(5)(a)(iii) Peraturan-Peraturan (Pemagaran Jentera dan Keselamatan) Kilang Dan Jentera 1967. Gagal untuk memasang pesawat yang memerlukan pengendali menggunakan kedua-dua tangannya serentak untuk mengendali penghimpit itu; dan diatur sedemikian supaya mesin itu tidak dapat dikendalikan dengan sebelah tangan sahaja,dan supaya ia mencegah masukan jari-jari pengendali ke dalam kawasan berbahaya sebelum lenjang menekan pelantak itu ditamatkan RM 1,000.00
Britestone Sdn. Bhd 2012-12-27 Quarry Per. 40 (3), (Pemagaran & Keselamatan) AKJ. Jentera pengangkut tali sawat (conveyor) tidak diadang sehingga menyebabkan kemalangan. RM 1,000.00
PARA MANUFACTURING SDN.BHD 2012-12-21 Manufacturing Per 9(1) (PENGGUNAAN DAN STANDARD PENDEDAHAN BAHAN KIMIA BERBAHAYA KEPADA KESIHATAN. Tiada CHRA. Gagal mengadakan pemeriksaan dan pengujian alat kawalan kejuruteraan oleh Juruteknik Higen RM 500.00RM 500.00
CHEE Kuang Ceramic Manufacturing Sdn.Bhd 2012-12-20 Manufacturing Per 26(1) USSECH RM 5,000.00
Antara Hati Sdn. Bhd. 2012-12-10 Construction Seksyen 49(1) AKKP, 1994. Gagal mematuhi notis larangan yang dikeluarkan RM 1,000.00
Aik Joo Can Sdn. Bhd. 2012-11-22 Manufacturing Seksyen 36(1)(a), AKJ 1967. Mengendalikan jentera tanpa kebenaran memasang RM 10,000.00
Sg Piah Mineral Resources Sdn Bhd 2012-11-01 Manufacturing Sek.15(1) AKKP. Gagal menyediakan pengadang keselamatan supaya lori pengangkut batu kapur tidak menaiki ramp stock pile RM 5,000.00 atau Penjara 6 bulan
Pembinaan Ikhasas-Merak sdn. Bhd. 2012-10-30 Construction Seksyen 15(1), AKKP 1994. Gagal untuk memastikan setakat yang praktik keselamatan, kesihatan dan kebajikan pekerja dengan tidak menyediakan satu sistem kerja selamat RM 12,000.00
Central Eco Fiber Sdn Bhd 2012-10-30 Manufacturing Sek.15(1) AKKP. Gagal memastikan setakat yang praktik keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya termasuk Prakaj Yadav terutamanya dengan tidak mengadakan satu sistem kerja yang selaamt ketika kerja penyenggaraan bailing machine RM 5,000.00 atau Penjara 6 bulan
Kwong Yik Sdn Bhd 2012-10-23 Manufacturing

Per.5(1)(aa) NADOPOD. Gagal dengan serta merta memberitahu pejabat JKKP dengan cara yang paling cepat mengenai kemalangan yang berlaku

Per.5(1)(bb) NADOPOD. Gagal menghantar laporan tentang kemalangan dalam masa 7 hari

RM 400.00 RM 400.00
Associated Builders & Contractors Sdn Bhd 2012-10-17 Construction Per. 51(4),BOWEC. Gagal menyediakan tempat tambahan yang mencukupi iaitu life line di tempat kerja pemasangan bumbung RM 2,000.00
Momentive Specialty Chemicals Sdn Bhd 2012-10-07 Manufacturing Seksyen 27(3) AKKP 1994. Seksyen 27(1) AKKP 1994
Guan Lee Hin Enterprise 2012-10-03 Borong Dan Runcit Sek. 36(1)(b) AKJ. Memasang Jentera mengangkat iaitu goods hoist tanpa mendapatkan kelulusan bertulis daripada Pemeriksa Kilang Dan Jentera RM 8,000.00
Classa Industrial (M) Sdn.Bhd. 2012-09-27 Manufacturing

Seksyen 15(1) AKKP 1994. Seksyen 19 AKKP 1994

Peraturan 5(1)(b)(aa),NADOOPOD 2004. Peraturan 13,NADOOPOD 2004

RM 10,000.00 atau RM 2,000.00
SOUTHERN PC STEEL SDN. BHD. 2012-09-24 Manufacturing Peraturan 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. . Majikan gagal untuk memastikan setakat yang praktik keselamatan, kesihatan dan kebajikan pekerja khususnya di kawasan ?wire drawing machine HH5? sehingga menyebabkan kemalangan maut. RM 20,000.00 atau 6 bulan penjara
Peresscol Sdn. Bhd. 2012-09-02 Manufacturing Seksyen 15(1), AKKP 1994. Majikan telah gagal untuk memastikan setakat yang praktik keselamatan, kesihatan dan kebajikan semasa bekerja. RM 5,000.00
Swan Printing Sdn. Bhd. 2012-09-02 Manufacturing Peraturan 9(1) Peraturan-Peraturan dan Kesihatan Pekerjaan (Penggunaan dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000. Tidak menjalankan CHRA RM 5,000.00
TL & CHIAM RECYCLE SDN. BHD 2012-08-16 Manufacturing Seksyen 34(1) AKJ. Kilang tidak berdaftar RM 4,000.00
Punj Loyd Oil & Gas (M) Sdn Bhd 2012-08-14 Construction

Peraturan 5(1)(b)(aa) P.U.(A) 128/04. Gagal melapor dengan serta merta

Peraturan 5(1)(b)(bb) P.U.(A) 128/04. Gagal melapor dalam masa 7 hari

RM 1,500.00 atau Penjara 4 bulan. RM 1,500.00 atau Penjara 4 bulan
Desa Hatchery Sdn Bhd 2012-08-14 Manufacturing

Peraturan 5(1)(b)(aa) P.U.(A) 128/04. Gagal melapor dengan serta merta

Peraturan 5(1)(b)(bb) P.U.(A) 128/04. Gagal melapor dalam masa 7 hari

RM 3,000.00 atau Penjara 4 bulan. RM 3,000.00 atau Penjara 4 bulan
Ujung Pelangi Construction Sdn.Bhd. 2012-08-08 Construction Sek 15(1) AKKP 1994. Sek 19 AKKP 1994 RM 20,000.00
Pengangkutan Terus Maju 2012-08-08 Pengangkutan Sek.15(1) Akta 514. Gagal untuk menjalankan tanggungjawab sebagai majikan untuk memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya. RM 15,000.00Penjara 3 bulan
Spring energy , Tanjung Quarry 2012-08-02 Penguarian Seksyen 15(1), AKKP 1994. Gagal mengadakan sistem kerja selamat RM 5,500.00
Polynic Industries Sdn Bhd 2012-07-31 Manufacturing Seksyen 19 AKKP 1994. Seksyen 15 AKKP 1994 RM 10,000.00
Polynic Industries Sdn Bhd 2012-07-31 Manufacturing Peraturan 13, NADOOPOD 2004. Peraturan 5(1)(b)(aa), NADOOPOD 2004 RM 5,000.00
Buildcast Sdn Bhd 2012-07-30 Construction Seksyen 19 AKKP 1994. Seksyen 15 AKKP 1994 RM 15,000.00
Temokin Villa Jelas JV Sdn.Bhd 2012-07-25 Construction Seksyen 29(2) AKKP dibaca bersama Perintah 3(b) (SHO) AKKP Fasa 2B. Tiada SHO RM 2,500.00
Genting Tanjung Bahagia Sdn Bhd 2012-07-24 Agriculture Sek.15(2)(c) Akta 514. Gagal untuk menjalankan tanggungjawab sebagai majikan untuk memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya RM 20,000.00Penjara 3 bulan
Hap Seng Clay Products Sdn Bhd 2012-07-24 Manufacturing S.32(1) Akta 514. Gagal memberitahu apa-apa kemalangan, kejadian berbahaya, keracunan pekerjaan tau penyakit pekerjaan yang telah terjadi atau mungkin akan terjadi di tempat kerja RM 5,000.00 atau Penjara 4 bulan
Hasrat Gemilang BTS JV Sdn.Bhd 2012-07-11 Construction Peraturan 106 Peraturan-Peraturan Kilang dan Jentera ( Kendalian Bangunan dan Kerja Binaan Kejuruteraan)( Keselamatan) 1986. Pembinaan Projek Cadangan Membina dan Menyiapkan Sebuah Bangunan Servis Apartment 21 tingkat yang mengandungi 251 unit servis apartment , 4 tingkat tempat letak kereta,bilik seminar dan satu unit kedai pejabat 2 tingkat di alamat lot 2048 & 879 Daerah Kubang Kerian,Jajahan Kota Bharu,Bandar Kota Bharu,Kelantan Darul Naim sebagai kontraktor utama telah gagal mengadang bukaan lubang yang terdapat di lantai tapak pembinaan. RM 1,000.00
Hasrat Gemilang BTS JV Sdn.Bhd 2012-07-11 Construction Peraturan 12,Peraturan - Peraturan ( Keselamatan,Kesihatan dan Kebajikan ) kilang dan jentera 1970. Membina dan Menyiapkan Sebuah Bangunan Servis Apartment 21 tingkat yang mengandungi 251 unit servis apartment , 4 tingkat tempat letak kereta,bilik seminar dan satu unit kedai pejabat 2 tingkat di alamat lot 2048 & 879 Daerah Kubang Kerian,Jajahan Kota Bharu,Bandar Kota Bharu,Kelantan Darul Naim sebagai kontraktor utama telah gagal untuk memastikan bukaan tepi lantai ditutup atau mengadang bukaan tepi bangunan di tingkat 5 hingga 8 yang sedang dibina bagi mengelakkan pekerja dari jatuh. RM 1,000.00
SP United Sdn.Bhd 2012-07-09 Manufacturing

Peraturan 5(1)(a)(aa) NADOPOD. NADOPOD, Tidak lapor Kemalangan

Seksyen 29 Pegawai Keselamatan dan Kesihatan Pekerjaan. Pegawai Keselamatan dan Kesihatan Pekerjaan

Seksyen 15 AKJ Bahagian Jentera yang Berbahaya. Bahagian Jentera yang Berbahaya

RM 3,000.00 RM 1,000.00 RM 10,000.00
Macthal bin Abdul Majid 2012-07-04 Peraturan 49(1) AKKP. Tidak mematuhi Notis yang dikeluarkan RM 5,000.00
Sabah Electricity Sdn Bhd 2012-06-28 Perkhidmatan elektri Seksyen 17(1), Akta 514. Gagal memastikan orang lain selain pekerja terdedah kepada risiko dari perusahaan terutama kerja menganti tiang elektrik
Techbay Sdn Bhd 2012-06-19 Construction Seksyen 10(e) Akta 139. Tiada pagar di tepian lantai terbuka RM 5,000.00
Che Pui Yin 2012-06-19 Construction Peraturan 24, BOWEC. Gagal memakai topi keselamatan RM 1,500.00
Prima Pricision Sdn Bhd 2012-06-11 Manufacturing Sek.15(1) AKKP. Gagal mengadakan prosedur kerja selamat dan menyenggara dalama keadaan baik brek forklift yang digunakan oleh mangsa RM 2,000.00
Kretam Mill Sdn Bhd 2012-06-07 Construction

Sek.35(1) Akta 139. Tidak mendaftarkan tapak bina dalam tempoh 7 hari daripada bermulanya pengendalian tapak pembinaan Silimponpon POM, Kalabakan.

Sek.17(1) Akta 514. Gagal menyelia kawasan kerja-kerja pemasangan FFB cage di dalam kawasan pembinaan Silimponpon POM sehingga menyebabkan kematian mangsa.

RM 1,000.00 atau Penjara 1 bulan. RM 15,000.00 atau Penjara 10 bulan
Wong Kang Woo 2012-06-07 Construction Sek.15(1) Akta 514. Gagal menjalankan penyeliaan sebagaimana perlu di kawasan kerja-kerja pemasangan FFB cage dalam kawasan pembinaan Silimponpon POM dengan menyebabkan kemalangan ke atas pekerja. RM 15,000.00 atau Penjara 10 bulan
Merge Jati Engineering Sdn Bhd 2012-06-07 Construction

Sek.17(1) Akta 514. Gagal menyelia kawasan kerja-kerja pemasangan FFB cage di dalam kawasan pembinaan Silimponpon POM sehingga menyebabkan kematian mangsa.

Sek.17(2) Akta 514. Gagal memberi prosedur kerja selamat yang ditetapkan tentang apa-apa aspek cara pemasangan FFB cage dengan kaedah yang selamat kepada pekerja yang menyebabkan kematian mangsa.

RM 10,000.00 atau Penjara 5 bulan. RM 15,000.00 atau Penjara 10 bulan
ARL Power Sdn. Bhd. 2012-06-06 Perkhidmatan elektri Seksyen 17(1), Akta 514. Gagal membekalkan maklumat bahaya kepada mangsa RM 15,000.00 atau Penjara 30 hari
Ever Best Engineering Sdn Bhd 2012-06-06 Perkhidmatan kejurut Seksyen 15(1), Akta 514. Gagal menyelia pekerja RM 10,000.00 atau Penjara 30 hari
Kheng Hwa Paper Sdn Bhd 2012-05-30 Manufacturing Seksyen 51(2) Akta Kilang dan Jentera 1970. Seksyen 29(2), Akta Kilang dan Jentera 1970 RM 20,000.00
Perbudi Sdn.Bhd 2012-05-28 Construction Seksyen 29(2) AKKP. Tiada SHO RM 600.00
UTIC Services Sdn Bhd 2012-05-28 Construction

Seksyen 19 AKKP 1994

. Seksyen 15(2)(c) AKKP 1994

Peraturan 41, Keselamatan, Kesihatan dan Kebajikan, Kilang dan Jentera 1970. Peraturan 13(2)(b), Keselamatan, Kesihatan dan Kebajikan, Kilang dan Jentera 1970

RM 40,000.00RM 800.00
Sime Darby Plantation (Sabah) 2012-05-24 Plantation Sek.15(1) Akta 514. Gagal memastikan setakat yang praktik,keselamatan,kesihatan dan kebajikan semasa bekerja sehingga mendedahkan risiko maut terkena sabit dan menyebabkan kematian. RM 20,000.00Penjara 6 bulan
Tradelift Indopalm Industries Sdn Bhd 2012-05-24 Manufacturing Seksyen 15(1), Akta 514. Gagal memastikan setakat yang praktik,keselamatan,kesihatan dan kebajikan pekerja RM 20,000.00 atau Penjara 6 bulan
Gedau Sdn Bhd 2012-05-23 Agriculture Seksyen 15 (1) Akta 514. Gagal memastikan setakat yang praktik keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerja kerana gagal menyelia ke atas pekerja semasa membuka dan memasang tayar sehingga menyebabkan kematian ke atas Muhammad Tahir Bin Baco RM 18,000.00
Syarikat MISA Renovation & Metal work 2012-05-23 Manufacturing

Seksyen 19 (1) Akta 139. Tiada sijil perakuan yang sah

Seksyen 34(2)(a) Akta 139. Gagal memberitahu Jabatan dalam notis bertulis tetntang premis yang digunakan sebagai kilang

RM 2,500.00
Rich Millennium S/B 2012-05-18 Pembalakan Per 5(a)(aa) & (a)(bb) NADOPOD 2004. Gagal sebagai majikan, memberitahu dengan serta merta pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan yang terdekat dengan cara yang paling cepat yang ada dan dalam masa tujuh hari menghantar laporan tentang kemalangan dalam borang yang diluluskan suatu kemalangan berbangkit daripada atau berkaitan dengan kerja yang menyebabkan kemalangan maut kepada Ujang Anak Ugap pada 4hb Julai 2010lebih kurang jam 4.00petang akibat ditimpa batang pokok selepas melakukan kerja memotong kayu balak; lokasi di kenali Lipan 68 kem tersebut RM 1,000.00 atau Penjara 1 bulan
Perfect Hallmark Sdn Bhd 2012-05-11 Construction Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Perfect Hallmark Sdn Bhd telah gagal memastikan setakat yang praktik keselamatan,kesihatan dan kebajikan semasa bekerja semua pekerja termasuklah yang bernama Mohd Khairul Anuar Bin Che Mohamad Zin dengan tidak mengadakan prosedur kerja selamat secara bertulis di tapak pembinaan bagi mengelakkan kejadian kemalangan maut. RM 7,000.00
Perfect Hallmark Sdn Bhd 2012-05-11 Construction Peraturan 18(1) Peraturan-Peraturan Kilang dan Jentera ( Kendalian Bangunan dan Kerja Binaan Kejuruteraan)( Keselamatan) 1986. Perfect Hallmark Sdn Bhd telah gagal untuk mengambil kerja seorang yang ditetapkan untuk mengawal keadaan lalu lintas di tapak pembinaan bagi pengawasan keselamatan semua pekerja dan orang awam. RM 1,000.00
Perfect Hallmark Sdn Bhd 2012-05-11 Construction Seksyen 29(2) Akta Keselamatan dan Kesihatan Pekerjaan?1994. Perfect Hallmark Sdn Bhd telah gagal untuk mengambil kerja seorang yang kompeten untuk bertindak sebagai pegawai keselamatan dan kesihatan di tapak pembinaan yang kos projek melebihi RM 20 juta. RM 2,000.00
Suibke Enterprise Sdn.Bhd 2012-05-10 Construction Kesalahan: Seksyen 35(1) AKJ. Kerjabina Tanpa serah notis bertulis kepada inspektor RM 9,000.00
Sabah Forest Industries Sdn Bhd 2012-05-09 Construction Sek 17(1) Akta 514. Gagal menyelia kerja-kerja tempat tinggi RM 20,000.00 atau Penjara 3 bulan
Prima Structure Sdn Bhd 2012-05-09 Construction Seksyen 10(e) Akta 139. Gagal untuk memagar lantai kerja dengan selamat RM 10,000.00 atau 2 tahun
Priceworth Industries Sdn Bhd 2012-05-09 Manufacturing

Peraturan 9(1) Pemonitoran Awalan Bunyi Bising. Gagal menjalankan pemonitoran awalan bunyi bising di tempat kerja

Peraturan 9(1) CHRA. Gagal menjalankan CHRA di tempat kerja

RM 1,000.00RM 5,000.00
Sign Scale Advertising Agency 2012-05-08 Lain-lain Per. 5(1)(a)(aa) P.U.(A) 128/04. Gagal dengan serta merta memberitahu pejabat JKKP dengan cara yang cepat RM 2,500.00 atau Penjara 3 bulan
Unisem(M) Berhad 2012-05-08 Manufacturing Sek .29(2) AKKP. Gagal mengambil seorang kompeten untuk bertindak sebagai Pegawai Keselamatan Dan Kesihatan di tempat kerja RM 500.00
Goodway Rubber Industries Sdn.Bhd 2012-05-05 Manufacturing Seksyen 36(1)(a) Akta Kilang dan Jentera. Memasang jentera tanpa kelulusan daripada Inspektor RM 20,000.00
ASPAEZI BIN PATKAR 2012-05-04 Seksyen 47 (F) OSHA 1994. Menghalang penjawat awam melaksanakan tugas RM 3,000.00
Salahuddin bin Salleh 2012-05-04 Seksyen 47 (F) OSHA 1994. Menghalang penjawat awam melaksanakan tugas RM 3,000.00
SN NURANI Laundry Sdn.Bhd 2012-05-04 Perkhidmatan Kesalahan:
  1. Per.10 (1) Peraturan-peraturan (Pemberitahuan Perakuan Kelayakan dan Pemeriksaan Kilang dan Jentera) - Boiler. Jentera Tanpa CF
  2. Per.10 (1) Peraturan-peraturan (Pemberitahuan Perakuan Kelayakan dan Pemeriksaan Kilang dan Jentera) - Compressor. Jentera Tanpa CF
  3. Seksyen 29(1) AKJ 1967 - Tiada Boiler man
  1. RM 300
  2. RM 300
  3. RM 3,000
Projek Penyelenggaraan Lebuhraya Berhad 2012-05-04 Perkhidmatan Kesalahan: Seksyen 15 (1) AKKP. Mengangkat pekerja dengan pma kren RM 15,000.00
Geomac Services Sdn.Bhd 2012-05-04 Perkhidmatan Kesalahan: Seksyen 15 (1) AKKP. Mengangkat pekerja dengan pma kren RM 15,000.00
HSLS Rubber Industries Sdn.Bhd 2012-04-27 Manufacturing Peraturan 5(3) Peraturan-Peraturan (Orang yang Menjaga) Kilang dan Jentera 1970. Tiada Drebar Enjin Gred 1 RM 500.00
TOKOPAK SDN.BHD 2012-04-26 Manufacturing Seksyen 29(1) AKJ 1967Tiada enjin driver RM 6,000.00
Rakanan Jaya Sdn Bhd 2012-04-25 Plantation Sek. 17(1) Akta 514. Gagal menyediakan prosedur kerja selamat bagi kerja-kerja ditempat tinggi RM 30,000.00 atau Penjara 6 bulan
Sawit Kinabalu Sdn Bhd 2012-04-25 Manufacturing Sek.15(1) Akta 514. Tiada prosedur kerja sehingga menyebabkan kecederaan serius di tangan mangsa RM 15,000.00 atau Penjara 4 bulan
Samawang sawmill Sdn Bhd 2012-04-25 Manufacturing Seksyen 29(2) Akta 514. Gagal melantik pegawai keselamatan dan kesihatan pekerjaan RM 3,000.00
MONSOK PALM OIL MILL SDN BHD 2012-04-25 Manufacturing Kesalahan. Seksyen 15(1), AKKP 1994. . Majikan didakwa atas kesalahan gagal memastikan keselamatan dan kesihatan pekerjaan OKS mengaku salah RM 30,000 atau 6 bulan Penjara OKS membayar
MSB Pelita Plantation(Mukah) S/B 2012-04-23 Agriculture Sek. 49(1) AKKP 1994. Gagal untuk mematuhi notis perbaikan(No siri 057768) bertarikh 8hb Julai 2010 untuk membuat penaksiran risiko bahan kimia RM 10,000.00 atau Penjara 3 bulan
Anjahan Sdn. Bhd 2012-04-09 Seksyen 36(1) AKJ. Pasang Jentera tanpa kelulusan inspektor RM 9,000.00
Plus Intervest 2012-04-06 Peraturan 5(4) OYK AKJ. Tiada boilerman Gred 1 RM 700.00
Classic Palm Oil Mill Sdn.Bhd 2012-04-04 Seksyen 8 (g) AKJ 1967. Tidak batal Notis : tiada tolok water gauge RM 7,000.00
Tionale Industries Sdn Bhd 2012-04-01 Manufacturing Kesalahan: Seksyen 15, AKKP1994. Gagal menyelenggara blow moulding machine. RM20,000.00
Malaysia Smelting Corporation Berhad 2012-03-29 Manufacturing Peraturan 13, NADOOPOD 2004. Peraturan 5(1)(b)(aa), NADOOPOD 2004 RM 1,000.00
Chi Cheng Technology Sdn.Bhd. 2012-03-29 Manufacturing

Seksyen 19 AKKP 1994. Seksyen 15(1) AKKP 1994

Peraturan 13, NADOOPOD 2004. Peraturan 5(1)(b)(aa)

RM 10,000.00RM 5,000.00
Paragon Reality Sdn. Bhd. 2012-03-26 Quarry Sek. 17(1) AKKP 1994. Membiarkan jentera dikendalikan di tapak kuari oleh orang yang tidak berkelayakan sehingga menyebabkan kematian kepada Abdul Latif Bin Mat Said RM 10,000.00 atau 1 tahun
JCY HDD Technology Sdn Bhd 2012-03-25 Manufacturing Seksyen 15, AKKP1994 Gagal menjalankan tanggungjawab sebagai majikan RM 10,000
A.Z.H Enterprise 2012-03-22 Communication Sek. 15(1) AKKP 1994. Gagal untuk memastikan,setakat yg praktik, keselamatan semasa bekerja pekerja kamu iaitu Issac Ak Elkana, Davendra Sani ak Asan dan Philipos Ak Loren dengan gagal membuat perkiraan bg menjamin keselamatan dan ketiadaan risiko untuk kerja-kerja pemasangan tiang telefon. RM 5,000.00
Prestar Galvanising Sdn. Bhd., 2012-03-19 Manufacturing Seksyen 15(1) AKKP. Gagal menjalankan penyeliaan terhadap orang lain yang bukan pekerjanya RM 10,000.00
Seng Chong Precision Sdn.Bhd. 2012-03-01 Manufacturing Peraturan 13, NADOOPOD 2004. Peraturan 5(1)(b)(aa), NADOOPOD 2004 RM 1,000.00
Yeh Chang Heat Tretment (M) Sdn.Bhd. 2012-02-29 Manufacturing Seksyen 19 AKKP 1994 RM 20,000.00
Lambang Sinar Mas S/B 2012-02-28 Agriculture Sek. 16 AKKP 1994. Gagal menyediakan Dasar K&K RM 10,000.00Penjara 3 bulan
NJ Manufacturing Industries Sdn. Bhd. 2012-02-25 Manufacturing

Seksyen 15(1) AKKP. Gagal mengadakan alat keselamatan (safety device) pada mesin power press

Seksyen 29(2) AKKP 1994. Tiada SHO

RM 3,000.00
Maju Enterprise 2012-02-10 Manufacturing Peraturan 9(1), Peraturan - Peraturan Kilang dan Jentera ( Pendedahan Bising ) 1989. Maju Enterprise telah gagal menjalankan pemonitoran awal bunyi bising ke atas pekerja. RM 200.00
Medan Agresif Sdn Bhd 2012-02-10 Manufacturing Peraturan 9(1), Peraturan - Peraturan Kilang dan Jentera ( Pendedahan Bising ) 1989. Medan Agresif Sdn Bhd telah gagal menjalankan pemonitoran awal bunyi bising ke atas pekerja. RM 300.00
Musim Istimewa Sdn Bhd 2012-02-10 Manufacturing Peraturan 9(1), Peraturan - Peraturan Kilang dan Jentera ( Pendedahan Bising ) 1989. Musim Istimewa Sdn Bhd gagal menjalankan pemonitoran awal bunyi bising ke atas pekerja. RM 300.00
Classic Palm Oil Mill Sdn.Bhd 2012-02-03 Manufacturing

Per. 5(5)(i) Peraturan Orang Menjaga ) Kilang dan jentera. Tiada jurutera stim

Seksyen 30(1)(a) AKKP. Tiada Safety Committee

RM 500.00RM 1,500.00
Percetakan Cahaya Murni 2012-02-01 Printing Kesalahan: Peraturan 9(1)Kewajipan Menyediakan Risalah Data Keselamatan Kimia) AKKP.
  1. Majikan menjalankan kerja tanpa membuat penaksiran risiko kerana mempunyai bahan kimia
  2. Memasang jentera iaitu electric Chain hoist tanpa kelulusan
  3. Memasang jentera tanpa sijil perakuan yang sah
  1. RM 2,000.00
  2. RM 9,000.00
  3. RM 9,000.00
Yap Choon Wai 2012-01-31 Construction Sebagai Pengarah Syarikat dan majikan Pembinaan C.W Yap telah menyebabkan gagal mematuhi Method Statement yang disediakan berkaitan kerja-kerja perobohan

Kesalahan. Seksyen 17(1), AKKP 1994

RM 5,000.00
New WK Restaurant Sdn Bhd 2012-01-31 Hotel & Restoran
  1. Gagal dengan serta merta melapor atau memberitahu pejabat JKKP berkaitan dengan kemalangan yang berlaku ke atas Cik Lau See Yen
  2. Menggunakan satu nit mesin angkat elektrik tanpa sijil perakuan kelayakan yang sah
  3. Memasang mesin angkat tanpa kebenaran bertulis dari Pemeriksa
  4. Kesalahan.

    1. Per. 5(1)(a)(aa) P.U.(A) 128/04
    2. Seksyen 19(1) Akta 139
    3. Seksyen 36(1)(b) Akta 139
  1. RM 5,000
  2. RM 10,000
  3. RM 10,000
Lok Kawi Plastics Industry Sdn Bhd 2012-01-31 Manufacturing Gagal memberitahu JKKP terdekat tentang kemalngan berlaku dengan cara yang paling cepat

Kesalahan. Per. 5(1)(b)(aa) P.U.(A) 128/04

RM 7,000.00
Yuta Maju Sdn. Bhd. 2012-01-30 Construction Membenarkan jentera yang tidak selamat dikendalikan untuk kegunaan aktiviti kerjanya ditapak bina berkenaan sehingga menyebabkan kecederaan kepada Chua Chin Teng

Kesalahan. Sek. 15(1) AKKP 1994

RM 4,000 @ 6 bulan penjara
Ahmad Zaki Sdn. Bhd. 2012-01-30 Construction Membiarkan jentera yang tidak selamat dikendalikan ditapak binanya sehingga menyebabkan kecederaan kepada Chua Chin Teng

Kesalahan. Sek. 15(1) AKKP 1994

RM 5,000 @ 6 bulan penjara
Mox-Linde Gases Sdn Bhd 2012-01-26 Manufacturing Gagal mengadakan latihan

Kesalahan. Seksyen 15/AKKP 1994

RM 28,000.00
Mox-Linde Gases Sdn Bhd 2012-01-26 Manufacturing Kesalahan: Seksyen 15/AKKP 1994. Gagal mengadakan latihan. RM28,000.00
Kilang Sawi Sri Senggora 2012-01-16 Manufacturing Majikan telah gagal untuk memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja

Kesalahan. Sek 15 (1) AKKP

RM 8,000.00
RN Construction 2012-01-12 Construction Kesalahan:.
  1. Peraturan 5 (1) aa NADOPOD
  2. Seksyen 15 (1) AKKP
.
  1. Gagal melaporkan serta-merta ke JKKP berhampiran
  2. Kewajipan majikan
  1. RM 5,000.00
  2. RM 20,000.00
Global Mine Builders Sdn Bhd 2012-01-11 Construction Gagal mengadakan temapt kerja selamat di kawasan bumbung bangunan

Kesalahan. Seksyen 15/AKKP 1994

RM 20,000
Global Mine Builders Sdn Bhd 2012-01-11 Construction Kesalahan: Seksyen 15/AKKP 1994. Gagal mengadakan temapt kerja selamat di kawasan bumbung bangunan. RM20,000.00
PK Fertilizer Sdn Bhd 2012-01-11 Manufacturing Gagal menyediakan prosedur kerja selamat untuk kerja-kerja di tempat tinggi

Kesalahan. Seksyen 17, AKKP 1994

RM 20,000
PK Fertilizer Sdn Bhd 2012-01-11 Manufacturing Kesalahan: Seksyen 17, AKKP 1994. Gagal menyediakan prosedur kerja selamat untuk kerja-kerja di tempat tinggi. RM 20,000.00
Recron 2012-01-08 Manufacturing PER 5(I) Peraturan-Peraturan (orang Menjaga) Kilang dan Jentera AKJ. Tiada Steam engineer RM 300.00
Pascorp Paper Industries Berhad 2012-01-06 Manufacturing Kesalahan. Per 4(1) FMS RM 300
Pascorp Paper Industries Berhad 2012-01-05 Manufacturing Kesalahan. Sek 15 (1) AKKP RM 5,000
Tionale Industries Sdn Bhd 2012-01-04 Manufacturing Gagal menyelenggara blow moulding machine

Kesalahan. Seksyen 15, AKKP1994

RM 20,000
Pangco Jaya Sdn. Bhd. 2011-12-21 Manufacturing Peraturan 9(1) Pendedahan Bunyi Bising. Pada 23 Ogos 2011, lebih kurang jam 11.00 pagi di No 62E, jalan Raja Syed Alwi, 01000 Kangar, Perlis, sebagai penghuni, telah gagal untuk menjalankan pemonitoran pendedahan awal pekerja bunyi bising ke atas pekerja dan tidak mengemukakan dokumen mengenai pemonitoran pekerja awal bunyi bising. Dengan itu, telah melanggar Peraturan 9(1) Peraturan-Peraturan Kilang dan Jentera (Pendedahan Bising) 1989 dan jika disabitkan kesalahan boleh dihukum di bawah Peraturan 34 Peraturan-Peraturan yang sama. RM 800.00
KK Earthworks Construction Sdn. Bhd. 2011-09-27 Construction Majikan telah gagal memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja pekerja dengan gagal mangadakan latihan bagi pengendalian jentera jentolak sehingga menyebabkan kemalangan maut ke atas pekerja.

Kesalahan. Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994

RM 5,000.00
T.E. Trading Sdn. Bhd. 2011-09-21 Construction 17(1) AKKP. Pada 2 Jun 2011, lebih kurang jam 11.00 pagi di tapak pembinaan Taman Putra Indah, 01000 Kangar, Perlis, sebagai majikan, telah gagal untuk menjalankan pengusahaan dengan cara memastikan, setakat yang praktik, bahawa orang-orang lain, yang bukan pekerja, yang mungkin tersentuh oleh pengusahaan kamu itu tidak terdedah kepada risiko kepada keselamatan dan kesihatan mereka oleh sebab pengusahaan kamu itu dengan gagal membekalkan loji yang selamat bagi kerja-kerja pemotongan dahan pokok sehingga menyebabkan kematian Zamzarun bin Zainul Abidin. Dengan itu, telah melakukan satu kesalahan di bawah seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 dan jika disabitkan kesalahan boleh dihukum di bawah seksyen 19 Akta yang sama. RM 4,000.00
Potensi Cekal Sdn. Bhd. 2011-09-13 Construction Seksyen 17(1), Akta Keselamatan dan Kesihatan, 1994

Satu Kemalangan maut telah berlaku pada 17/5/2010 yang melibatkan seorang pekerja kontraktor-sub iaitu Faishol (no. passport: AM687506) akibat terkena serpihan grinder disc yang telah pecah. Hand grider tidak dipasangkan dengan grinder cover semasa kejadian kerana grinder disc yang bersaiz lebih besar (iaitu 14 inci diameter) telah digunakan berbanding dengan saiz yang sepatutnya (iaitu<8 inci). Ini menyebabkan pecahan grinder disc telah mengenai muka mangsa dibahagian kanan menyebabkan mangsa mati di tempat kejadian.

RM 20,000.00
Inland Base Sdn. Bhd. 2011-09-08 Pembalakan
  1. Gagal untuk memberitahu dengan serta-merta pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan yang terdekat dengan cara yang paling cepat yang ada bagi kemalangan tersebut; dan
  2. Gagal dalam masa tujuh hari dari hari kejadian menghantar laporan tentang kemalangan tersebut dalam borang yang diluluskan.

Kesalahan. Per 5(1)(a)(aa) dan Peraturan 5(1)(a)(bb), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004

RM 2,000.00 bagi setiap pertuduhan (Jumlah RM 4,000.00)
Caldecott Construction Sdn. Bhd. 2011-09-06 Construction Gagal untuk memberitahu pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan yang terdekat dengan cara yang paling cepat yang ada berkenaan kemalangan berbangkit atau berkaitan dengan kerja yang menyebabkan kematian orang-orang selain daripada pekerja

Kesalahan. Peraturan 5(1)(a)(aa), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004

RM 2,500.00
Syarikat Pembinaan Makmur 2011-08-25 Construction Gagal menyampaikan kepada Pemeriksa Kilang dan Jentera notis bertulis dalam bentuk yang ditetapkan bagi mengendalikan kerja bina bangunan dan kerja kejuruteraan

Kesalahan. Seksyen 35(1) Akta Kilang Dan Jentera 1967

RM 5,000 .00
Indah Jaya Works Sdn. Bhd. 2011-08-25 Manufacturing

Seksyen 36(1)a AKJ. Memasang jentera am tanpa kelulusan Inspektor

Seksyen 36 (1)(b) AKJ. Memasang jentera UPV tanpa kelulusan inspektor

Seksyen 34 (1)(2)(a) AKJ. Kilang tidak berdaftar

Peraturan 5(1)(a)(bb) NADOPOD AKKP. Tidak melaporkan kemalangan maut dengan kadar segera tempoh 24 jam

RM 50,000.00
Genting Plantation Bhd 2011-08-02 Plantation Seksyen 17(1). Tiada prosedur kerja bagi aktiviti kuari bagi memastikan keselamatan selain pekerja yang tersentuh dgn perusahaan kuari RM 10000 @ 2 bulan penjara
Tazan Sdn Bhd 2011-08-02 Quarry Seksyen 15(1) Akta 514, Akta Keselamatan & Kesihatan Pekerjaan 1994. Tiada pemantauan terhadap kerja kuari menyebabkan kemalangan maut. RM 7,000 @ 2 bulan penjara
Sabah Forest Industries Sdn Bhd 2011-05-16 Pembalakan Seksyen 17(1) Akta 514, Akta Keselamatan & Kesihatan Pekerjaan 1994. Gagal menyelia kontraktor kerja-kerja penanaman semula pokok balak mematuhi garis panduan. RM 10,000 @ 3 bulan penjara
Farmglow Sdn. Bhd. 2011-05-16 Pembalakan Seksyen 15(1) Akta 514, Akta Keselamatan & Kesihatan Pekerjaan 1994. Gagal menyelia pekerja yang bekerja menebang pokok dengan membiar bekerja sendirian. . Per 5(1)(a)(aa) P.U.(A)128/2004. Gagal melapor kemalangan maut dengan kadar segera RM 15,000 @ 5 bulan penjara. RM 3,000 @ 4 bulan penjara
TGL Packaging Sdn.Bhd. 2011-05-13 Seksyen 31(b) Akta Kilang Dan Jentera 1967. Gagal melaporkan kemalangan yang menyebabkan kecederaan badan ke atas pekerja tuan iaitu En.Ong Chin Chye No.I/C(580201-07-5169) pada 04/02/2010 lebih kurang jam 11.15 pagi kepada Inspektor secara bertulis di dalam bentuk yang ditetapkan dengan menggunakan cara yang tercepat. RM 5,000.00
Schneider Electric IT Malaysia Sdn. Bhd. 2011-05-13 Construction Gagal memberitahu dengan serta-merta pejabat Jabatan Keselamatan dan Kesihatan Pekerjaan yang terdekat dengan cara yang paling cepat yang ada, suatu kemalangan berbangkit daripada atau berkaitan dengan kerja yang melibatkan kemalangan maut.

Kesalahan. Peraturan 5(1)(aa) Peraturan-Peraturan Keselamatan dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004

RM 3,000.00
KKB Industries (Sabah) Sdn Bhd 2011-05-04 Manufacturing PER 5(1)(b)(aa) P.U.(A)128/2004. Tidak melapor kemalangan segera. . PER 5(1)(b)(bb) P.U.(A)128/2004. Tidak melapor kemalangan dalam borang yg ditetapkan dalam masa 7 hari. i) RM 3,000 @ 3 bulan penjara. ii) RM 3,000 @ 3 bulan penjara
Zenova (M) Sdn Bhd 2011-05-04 Manufacturing PER 5(1)(b)(aa) P.U.(A)128/2004 Tidak melapor kemalangan segera PER 5(1)(b)(bb) P.U.(A)128/2004 Tidak melapor kemalangan dalam borang yg ditetapkan dalam masa 7 hari RM 7,000 @ 6 bulan penjara. RM 7,000 @ 6 bulan penjara
Zenova (M) Sdn Bhd 2011-05-04 Manufacturing Sek 29(2), Akta 514. Gagal melantik SHO. . Sek 29(1) Akta 139, Akta Kilang Dan Jentera 1967. Tiada steam engineer i) RM 3,500 @ 6 bulan penjara. ii)RM 15,000 @ 6 bulan penjara
Zhen Yang Steel Works Sdn.Bhd. 2011-04-23 Seksyen 31(b) Akta Kilang Dan Jentera 1967. Gagal melaporkan kemalangan yang menyebabkan kecederaan badan ke atas pekerja tuan iaitu En.Mohd Nizam Bin Ahmad @ Mohd Said No.I/C (781121-02-5437) pada 12/12/2009 lebih kurang jam 9.15 pagi kepada Inspektor secara bertulis di dalam bentuk yang ditetapkan dengan menggunakan cara yang tercepat RM 5,000.00
Sinkong Construction Sdn. Bhd. 2011-04-19 Construction Seksyen 10(c), Akta 139, Akta Kilang Dan Jentera 1967. Gagal memastikan tepian lantai terbuka dihadang elak risiko jatuh.

Seksyen 29(2) AKTA 514, Akta Keselamatan & Kesihatan Pekerjaan 1994 Gagal mengambil bekerja seorang pegawai keselamatan dan kesihatan sepenuh masa.
i) RM 10,000 @ 2 bulan penjara. ii) RM 5,000 @ 1 bulan penjara
R.P. Printers Sdn.Bhd. 2011-04-09 Seksyen 31(b) Akta Kilang Dan Jentera 1967. Gagal melaporkan kemalangan yang menyebabkan kecederaan badan ke atas pekerja tuan iaitu En.Oh Yin Yin No.I/C (720610-08-5474) pada 03/03/2010 lebih kurang jam 11.00 pagi kepada Inspektor secara bertulis di dalam bentuk yang ditetapkan dengan menggunakan cara yang tercepat. RM 5,000.00
HK Jaya Sdn. Bhd. 2011-04-08 Construction Telah gagal menjalankan tanggungjawab untuk memastikan setiap tepian platform kerja atau tempat kerja di mana seseorang pekerja boleh jatuh pada ketinggian melebihi 3 meter hendaklah disediakan rel pengadang yang sesuai atau rel pengadang yang cukup kuat sekurang-kurangnya satu meter di atas platform atau tempat dan di atas mana-mana tempat tinggi yang mencukupi tetapi tidak boleh kurang daripada 200 milimeter dan ditempatkan sedemikian untuk mencegah seberapa yang mungkin orang, bahan dan alat terjatuh daripada platform atau tempat itu.

Kesalahan. Peraturan 88(1), Peraturan-peraturan (Kendalian Bangunan dan Kerja Binaan Kejuruteraan)(Keselamatan) Kilang dan Jentera 1986

RM 1700.00
Mint Chuan Iron Construction 2011-03-25 Manufacturing Menggunakan premis sebagai kilang tanpa menyampaikan kepada pemeriksa suatu notis bertulis dalam bentuk yang ditetapkan.

Kesalahan. Seksyen 34(2)(a) Akta kilang dan Jentera 1967

RM 5,000.00
Nam Loong & Co. 2011-03-25 Manufacturing Menggunakan premis sebagai kilang tanpa menyampaikan kepada pemeriksa suatu notis bertulis dalam bentuk yang ditetapkan.

Kesalahan . Seksyen 34(2)(a) Akta kilang dan Jentera 1967

RM 5,000.00
Kayel Rubber Products Sdn.Bhd. 2011-03-17 Seksyen 31(b) Akta Kilang Dan Jentera 1967. Gagal melaporkan kemalangan yang menyebabkan kecederaan badan ke atas pekerja tuan iaitu En.Chong Chun Kiat No.I/C(740808-08-5849) pada 01/03/2010 lebih kurang jam 11.00 pagi kepada Inspektor secara bertulis di dalam bentuk yang ditetapkan dengan menggunakan cara yang tercepat. RM 5,000.00
KHC Spring Corporation (M) Sdn.Bhd. 2011-03-17 Seksyen 34(2) (a)Akta Kilang Dan Jentera 1967. Pihak Majikan telah gagal untuk mendapatkan kebenaran bertulis dari Pemeriksa untuk menggunakan premis sebagai kilang. RM 5,000.00
YBS Tenaga Sdn Bhd 2011-03-14 Construction PER 5(1)(b)(aa) P.U.(A)128/2004. Tidak melapor kemalangan. RM 3,000 @ 6 bulan penjara
North Malaya Engineers Trading Co. Sdn.Bhd. 2011-03-09 Seksyen 31(b) Akta Kilang Dan Jentera 1967. Gagal melaporkan kemalangan yang menyebabkan kecederaan badan ke atas pekerja tuan iaitu En.Rahim Bin Hussein No.I/C(570606-02-5951 pada 09/04/2010 lebih kurang jam 3.20 petang kepada Inspektor secara bertulis di dalam bentuk yang ditetapkan dengan menggunakan cara tercepat. RM 5,000.00
Leader Steel Sdn.Bhd. 2011-03-09 Seksyen 31(b) Akta Kilang Dan Jentera 1967. Gagal melaporkan kemalangan yang menyebabkan kecederaan badan ke atas pekerja tuan iaitu En.Mohd Nyzam Bin Mat Daud No.I/C(810823-07-5455) pada 26/06/2010 lebih kurang jam8.40 pagi kepada Inspektor secara bertulis di dalam bentuk yang ditetapkan dengan menggunakan cara tercepat. RM 5,000.00
Sarahon Construction Sdn. Bhd. 2011-03-02 Construction Gagal mengambil kerja seorang yang kompeten untuk bertindak sebagai pegawai keselamatan dan kesihatan di tempat kerja.

Kesalahan. Seksyen 29(2) Akta Keselamatan & Kesihatan Pekerjaan 1994 dibaca bersama Perintah 3(a)Perintah Keselamatan & Kesihatan Pekerjaan(Pegawai Keselamatan & Kesihatan)1997

RM 2,500.00
Borneo Samudera Sdn. Bhd. 2011-02-22 Plantation Seksyen 15(1) akta 514. Gagal membuat perkiraan memastikan keselamatan pekerja dalam kerja mengangkut pekerja. RM 9,000 @ 1bulan penjara
Syarikat Perniagaan Perindustrian King Hong Sdn. Bhd. 2011-01-31 Manufacturing Peraturan 16(a)(i) Peraturan Kilang dan Jentera (Pemagaran Jentera dan Keselamatan). Gagal memasang adang ke atas aci bagi jentera Roughing Mill stand di dalam jarak 6′ 6″ dari permukaan lantai atau pelantai kerja dengan kotak-kotak yang menutupi aci itu sama sekali. RM 600.00
Fujisash (M) Sdn Bhd 0000-00-00 Manufacturing Peraturan 12 -Peraturan Kilang dan Jentera (Keselamatan, Kesihatan dan Kebajikan), 1970Gagal menggunakan tali-tali sawat atau tali-tali keledar yang mungkin jatuh melebihi 10 kaki . RM500.00
MCC Overseas (M) Sdn Bhd (Country Garden) 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan tempat kerja selamat sehingga menyebabkan kematian. RM20,000.00
MCC Overseas (M) Sdn Bhd (Country Garden) 0000-00-00 Construction Peraturan 5(3)- Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal melaporkan kemalangan yang menyebabkan kehilangan nyawa (Nor Kabir bin Abu Miya). RM5,000.00
MCC Overseas (M) Sdn Bhd (Country Garden) 0000-00-00 Construction Peraturan 5(3)- Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal melaporkan kemalangan yang menyebabkan kehilangan nyawa (Sanaji). RM5,000.00
Sunrise Arena Sdn. Bhd. 0000-00-00 Quarry Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Kegagalan yang berhubung dengan kemalangan maut yang melibatkan pekerjanya bernama Soyodullah Bin Sedik. RM5,000.00
Diorite Premix Sdn. Bhd. 0000-00-00 Quarry Sekyen 17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Kegagalan yang berhubung dengan kemalangan maut yang melibatkan orang yang bukan pekerjanya bernama Soyodullah Bin Sedik. RM5,000.00
MEDIDATA SDN BHD 36 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Pemberitahuan Dan Pelaporan Kemalangan. RM2,500.00
Tesco Stores (Malaysia) Sdn Bhd 0000-00-00 Borong dan Runcit Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 19941994. Pada 20 September 2014, di antara jam 01.00 petang hingga 03.00 petang di premis Tesco Ipoh, No. 2, Jalan Jambu, Taman Teh Teng Seng, 34100 Ipoh, Perak sebagai majikan telah gagal memastikan, setakat yang praktik, keselamatan, kesihatan, kebajikan semasa bekerja semua pekerja termasuklah Rajkumar Pillay a/l Kanapathy Pillay (No. Kad Pengenalan : 710309-02-6003) terutamanya dengan tiada Prosedur Pengendalian, Penyimpanan,Penyenggaraan Silinder FM-200 sehingga menyebabkan kecederaan badan yang serius. RM40,000.00
HSL Constructor Sdn Bhd 0000-00-00 Construction Seskyen 15(1) AKKP 1994. Pada 24 November 2015 lebih kurang jam 11.30 pagi sebagai majikan telah gagal untuk memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya termasuklah Tawan Srihatrai (No. Pasport AA 3159388) terutamanya gagal memasang dan menyenggara grating dengan selamat di Intake Pumping Station Manjung 5 ? Fast Track 3A Power Plant Project Site, Jalan Semarak Api, Teluk Rubiah, 32010 Seri Manjung sehingga menyebabkan kemalangan maut. RM40,000.00
Daelim (M) Sdn. Bhd. 0000-00-00 Construction Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Pada 24 November 2015 lebih kurang jam 11.30 pagi sebagai majikan telah gagal untuk memastikan, setakat yang praktik, bahawa dia dan orang-orang lain, yang bukan pekerjanya, yang mungkin tersentuh oleh pengusahaan itu tidak terdedah kepada risiko kepada keselamatan atau kesihatan mereka oleh sebab pengusahaan itu termasuklah Tawan Srihatrai (No. Pasport AA 3159388) terutamanya gagal mengadakan penyeliaan terhadap kerja-kerja pemasangan grating di Intake Pumping Station Manjung 5 ? Fast Track 3A Power Plant Project Site, Jalan Semarak Api, Teluk Rubiah, 32010 Seri Manjung sehingga menyebabkan kemalangan maut. RM15,000.00
Tasek Corporation Berhad 0000-00-00 Manufacturing Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 19941995. Pada 9 November 2015 sebagai majikan telah gagal untuk memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya dengan tidak mengadakan Prosedur Kerja Selamat Bagi Aktiviti Memadam Bara/Kebakaran Habuk Arang Batu (Coal Dust) sehingga menyebabkan kemalangan maut ke atas pekerja Mohammad Najmuddin bin Zabidin (No. Kad Pengenalan : 910720-08-5245) di Coal Mill No.1, Tasek Corporation Berhad, Persiaran Tasek, Kawasan Perindustrian Tasek, 31400 Ipoh, Perak. RM15,000.00
Tasek Corporation Berhad 0000-00-00 Manufacturing Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Pada 14 Ogos 2015 lebih kurang jam 9.00 pagi sebagai majikan telah gagal untuk memastikan, setakat yang praktik, bahawa dia dan orang-orang lain, yang bukan pekerjanya, yang mungkin tersentuh oleh pengusahaan itu tidak terdedah kepada risiko kepada keselamatan atau kesihatan mereka oleh sebab pengusahaan itu termasuklah Muhammed Hanif (No. Pasport AD 9723790) terutamanya tidak menyediakan prosedur kerja selamat bagi kerja penyelenggaraan dan pembersihan blockage pada drag chain di Bahagian Coal Mill 2, Kiln 3 Clinker Auxiliary Hopper dan L3M142 Bucket Conveyor Tasek Corporation Berhad sehingga menyebabkan kecederaan badan yang serius. RM40,000.00
Pembinaan Kawasi Utara Sdn Bhd 0000-00-00 Construction Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan prosedur bagi pemasangan formwork. RM15,000.00
Pembinaan Kawasi Utara Sdn Bhd 0000-00-00 Construction Peraturan 12 -Peraturan Kilang dan Jentera (Keselamatan, Kesihatan dan Kebajikan), 1970Gagal menggunakan tali-tali sawat atau tali-tali keledar yang mungkin jatuh melebihi 10 kaki . RM1,000.00
Hong Xin Construction Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan laluan kerja selamat sehingga menyebabkan kematian. RM20,000.00
Delta Arms Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal memastikan setakat praktik keselamatan pekerja dengan gagal menyediakan sistem kerja selamat berkaitan aktiviti kerja pengalihan paip kabel TNB. RM25,000.00
Pembinaan Jemerlang Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal memastikan setakat praktik keselamatan pekerja dengan tiada sop memasang dan merombak mould steel T beam. RM21,000.00
Empire Megatech Sdn Bhd 0000-00-00 Construction Seksyen 17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Menjalankan pengusahaan tidak selamat sehingga menyebabkan orang lain yang bukan pekerja maut. RM20,000.00
Skycom Enterprise 0000-00-00 Communication Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 19941995. Gagal memastikan keselamatan pekerja dengan cara tidak menyelenggara tempat kerja yang selamat. RM8,000.00
PCO Lite Electrical Sdn Bhd 0000-00-00 Manufacturing Seksyen 29(2) AKKP 1994 dibaca bersama Perintah 3(g) Perintah Keselamatan Dan Kesihatan Pekerjaan (Pegawai Keselamatan Dan Kesihatan) 1997. Gagal mengambil kerja seorang kompeten untuk bertindak sebagai Pegawai Keselamatan dan Kesihatan di tempat kerja. RM20,000.00
Heaveabord Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(2) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal melaporkan kamalangan serta merta. RM2,000.00
CLANICON E & C SDN BHD 0000-00-00 Construction Sek. 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Gagal Memastikan Keselamatan Pekerja2 Sehingga Menyebabkan Kemalangan Maut 2 Pekerja (Perancah Runtuh). RM20,000.00
FAJAR BARU BUILDERS SDN BHD 0000-00-00 Construction Sek. 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Gagal Memastikan Keselamatan Pekerja2 Sehingga Menyebabkan Kemalangan Maut 2 Pekerja (Perancah Runtuh). RM25,000.00
SIGNATIUM CONSTRUCTION SDN BHD 0000-00-00 Construction Sek. 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Gagal Memastikan Keselamatan Pekerja2 Sehingga Menyebabkan Kemalangan Maut 2 Pekerja (Perancah Runtuh). RM20,000.00
MULTIMODAL FREIGHT SDN BHD 0000-00-00 Business Trade Sek. 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 . Gagal Menjalankan Kewajipan Untuk Memastikan Keselamatan Dan Kesihatan Dia Dan Orang-Orang Lain Yang Bukan Pekerjanya, Yang Mungkin Tersentuh Dengan Pengusahaannya Itu Agar Tidak Terdedah Kepada Risiko Keselamatan Dan Kesihatan. RM20,000.00
Rubberex Alliance Sdn. Bhd. 0000-00-00 Manufacturing Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 19941995. Pada 07 Ogos 2015 lebih kurang jam 10.50 pagi sebagai majikan telah gagal untuk memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya termasuklah Zul Ashraf Bin Sameri (No. k/p: 951014-08-5273) terutamanya dengan tidak menyediakan prosedur kerja selamat bagi kerja servis dan penyelenggaraan 'Rotary Valve' sehingga menyebabkan kecederaan badan yang serius. RM4,500.00
Ace Oil Palm Sdn bhd 0000-00-00 Manufacturing Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 19941996. Gagal mengadakan prosidur kerja selamat. RM8,000.00
SG Cables Sdn Bhd 0000-00-00 Construction Seks 15(2)(a) & (b) Akta Keselamatan dan Kesihatan Pekerjaan, 1994 . 1) Gagal menyediakan pengadaan loji dgn tidak memasang peranti keselamatan tambahan jenis kitto clamp pd tali sawat winch jenama Chenta semasa melakukan aktiviti mengangkat/menurun cross arm bg pemasangan menara transmisi. 2) Gagal membuat perkiraan iaitu pengadaan SOP apabila berlaku kegagalan(failure) ketika penggunaan/pengendalian winch jenama Chenta semasa melakukan aktiviti mengangkat/menurun cross arm bg pemasangan menara transmisi. (NFA) . RM20,000.00
Sunzen Biotech Sdn Bhd 0000-00-00 Manufacturing Sek. 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 . Gagal Mematuhi Notis Perbaikan (No. Siri: 3A 118689) Yang Dikeluarkan Pada 23/03/2015 - Per. 9(1) Usechh 2000 RM10,000.00
Sunzen Biotech Sdn Bhd 0000-00-00 Manufacturing Seksyen 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 . Gagal Mematuhi Notis Perbaikan Yang Dikeluarkan . RM10,000.00
Sri Binaraya Sdn Bhd 0000-00-00 Construction Seksyen 29, Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Gagal melantik seorang yang kompeten untuk bertindak sebagai pegawai keselamatan dan kesihatan. RM3,500.00
Sime Darby Plantation Sdn Bhd (KKS Hadapan) 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal membuat perkiraan sehingga menyebabkan pekerja maut akibat 3rd degree burn. RM12,000.00
Kimcon Bina Sdn Bhd 0000-00-00 Construction Sek. 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 . Gagal Mematuhi Notis (2A 009335) Dikeluarkan Pada 28/08/2015 Nop - Per. 12, Shw 1970 (Bekerja Di Tempat Tinggi). RM25,000.00
Chin Nam Construction Sdn Bhd 0000-00-00 Construction Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada pengadaan maklumat, arahan latihan dan penyeliaan. RM20,000.00
Tenzin Heavy (M) Sdn Bhd 0000-00-00 Construction Seksyen 29(a), Akta Kilang dan Jentera 1967. Tiada kebenaran bertulis untuk memasang, menguji, merombak dan menyelenggara kren menara. RM20,000.00
S. N. AKMIDA HOLDINGS SDN BHD 0000-00-00 Construction Sek. 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Notis Larangan Berkaitan Platform Kerja Selamat (No. Siri: 2a 007436). RM20,000.00
Hab Construction Sdn Bhd 0000-00-00 Construction Seksyen. 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 . Tidak Mematuhi Arahan Di Dalam Notis Larangan. Notis Tidak Dibatalkan. RM15,000.00
Energiser Enterprise Sdn. Bhd. 0000-00-00 Construction Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 1994. Pada 5 Mac 2016 lebih kurang pukul10.30 pagi sebagai majikan telah gagal untuk memastikan, setakat yang praktik, bahawa kamu dan orang-orang lain, yang bukan pekerja kamu, yang mungkin tersentuh oleh pengusahaan itu tidak terdedah kepada risiko kepada keselamatan atau kesihatan mereka oleh sebab pengusahaan kamu teruatamanya dengan gagal mengadakan pagar (hoarding) bagi memastikan orang awam tidak memasuki kawasan tapak bina di tapak Cadangan Membina 14 Unit Rumah Teres Di Plot 479-492, Jalan Koperasi 33, Taman Perpaduan Koperasi, 31150 Ulu Kinta, Perak. RM15,000.00
Kilang Kelapa Sawit Lekir Sdn. Bhd. 0000-00-00 Manufacturing Seskyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada Jam 9.00 Malam Sebagai Majikan Telah Gagal Untuk Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Termasuklah Mohd Salim Bin Abdullah (No. Kad Pengenalan: 650620-08-5979) Terutamanya Gagal Menyenggara Oneumatic Damper System Termasuk ?Spring Actuator? Pada Forced Drought (Fd) Fan Damper Di Dandang Stim Bernombor Pendaftaran Pmd8669 Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM15,000.00
Soong Hoe Metal Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Sebagai Majikan Di Lot 69 Kawasan Perindustrian Gong Badak, 21300 Kuala Terengganu, Telah Gagal Memberitahu Dan Melaporkan Kemalangan Pekerjaan Yang Menimpa saifur Bin Mohamad (Nombor Kad Pengenalan: 820804-11-5289) Yang Menghalang Beliau Menjalankan Tugas Selama Lebih Daripada Empat Hari Kalendar Pada Tarikh 10/01/2015. RM700.00 Penjara:2 Bulan
Edgenta Propel Berhad 0000-00-00 Business Trade Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 03 Februari 2016, Di Antara Jam 01.00 Petang Hingga 03.00 Petang Di Km 343.8 Arah Selatan Lebuhraya Plus, Sungkai - Bidor, Perak, Sebagai Majikan Telah Gagal Menjalankan Pengusahaan Kamu Dengan Cara Memastikan, Setakat Yang Praktik, Bahawa Orang-Orang Lain, Yang Bukan Pekerja Kamu, Yang Mungkin Tersentuh Oleh Pengusahaan Kamu Itu Tidak Terdedah Kepada Risiko Kepada Keselamatan Dan Kesihatan Mereka, Oleh Sebab Pengusahaan Kamu Itu Dengan Tidak Menyediakan Prosedur Kerja Yang Selamat Bagi Kerja-Kerja Penyelenggaraan Jalan Termasuklah Kerja-Kerja Memotong Rumput Sehingga Berlaku Kemalangan Maut Ke Atas Hamidur Rahman (No. Passport : Bc 0584150). RM15,000.00
GSR Construction Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan tempat kerja selamat sehingga menyebabkan kematian. RM30,000.00
Yuseng Plantation Sdn Bhd 0000-00-00 Plantation Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 19941997. Gagal mengadakan maklumat, arahan dan latihan dan penyeliaan pengendalian traktor. RM3,000.00
Kerjaya Prospek (M) Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan tempat kerja selamat sehingga menyebabkan kematian. RM40,000.00
GP Batteries (M) Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan tempat kerja selamat sehingga menyebabkan lebihan manganese dalam badan. RM20,000.00
Rubber Leisure 0000-00-00 Manufacturing Peraturan 10,Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Kawalan Terhadap Bahaya Kemalangan Besar Dalam Perindustrian) 1996. Gagal Mengemukakan Demonstrasi Operasi Selamat. RM5,000.00
Konsortium Ipmines Merz Sdn Bhd 0000-00-00 Construction Seksyen 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Membuat Kawalan Keluar Dan Masuk Orang Awam Sehingga Menyebabkan Kemalangan Maut. RM32,000.00
Lt Industries Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Persekitaran Yang Selamat Sehingga Menyebabkan Kemalangan Maut. RM35,000.00
Kejuruteraan Letrik Seri (M) Sdn Bhd 0000-00-00 Construction Sek. 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 1994. Gagal Memastikan Keselamatan Pekerja Yang Bukan Pekerja Selamat RM30,000.00
Kejuruteraan Letrik Seri (M) Sdn Bhd 0000-00-00 Construction Seksyen. 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994 . Gagal Memastikan Keselamatan Pekerja Yang Bukan Pekerja Selamat. RM30,000.00
Malay-Sino Chemical Industries Sdn Bhd 0000-00-00 Manufacturing Seksyen 29(2), Akta Keselamatan Dan Kesihatan Pekerjaan Dibaca Bersama Perintah Keselamatan Dan Kesihatan Pekerjaan (Pegawai Keselamatan Dan Kesihatan)1997. Sebagai Majikan Di Lot PT 4406, Kawasan Perindustrian Telok Kalong, 24000 Kemaman, Terengganu Didapati Bersalah Kerana Tidak Menggaji Seorang Pegawai Keselamatan Dan Kesihatan Seperti Mana Ditetapkan Di Dalam Perintah Keselamatan Dan Kesihatan Pekerjaan (Pegawai Keselamatan Dan Kesihatan)1997. RM3,000.00 Penjara:2 Bulan
Zublin Precast Industries Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan tempat kerja selamat sehingga menyebabkan kematian. RM25,000.00
Central Industrial Corporation Berhad 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Membuat Perkiraan Bagi Menjamin, Setakat Yang Praktik, Sehingga Menyebabkan Kecederaan Hilang Upaya Kekal Kepada Hermawan Warso Semito (No. Pasport: As857161). RM20,000.00
Rong Hua Shoe Industries Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 17(1)(a) dan (b) Peraturan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000 AKKP 1994. Gagal Menjalankan Pemeriksaan Dan Pengujian Keberkesanan Ke Atas Sistem Kawalan Kejuruteraan Yang Disediakan Iaitu 'Dust Collector' Di Bahagian Safety Shoes Insert Steel Toe Cap. RM6,000.00
Jeng Huat Bahau Realty Sdn Bhd 0000-00-00 Manufacturing Sekyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 19941998. Gagal mengadakan penyelenggaraan loji . RM30,000.00
Jeng Huat Bahau Realty Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(1)(a)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 . Gagal melaporkan kemalangan. RM30,000.00
Jeng Huat Bahau Realty Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(1)(a)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 . Gagal melaporkan kemalangan segera. RM6,000.00
Jeng Huat Bahau Realty Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(1)(a)(bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 . Gagal melaporkan kemalangan dengan borang ditetapkan dalam tempoh 7 hari. RM5,000.00
Gayanis Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(2)(b) Akta Keselamatan dan Kesihatan Pekerjaan, 1994. Gagal utk menyediakan SOP utk aktiviti berkaitan "fuel feeding" di stesen dandang. RM6,000.00
Pacific Oleochemicals Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan tempat kerja selamat sehingga menyebabkan kematian. RM10,000.00
Perfect Trans Sdn Bhd 0000-00-00 Manufacturing 1) Per 5(1)(a)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. Gagal dgn serta merta utk memberitahu kemalangan. RM4,000.00
Perfect Trans Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(1)(a)(bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 . Gagal dlm masa 7 hari memberitahu kemalangan dlm brg yg diluluskan(JKKP 6). RM3,000.00
Brite Malindo 0000-00-00 Construction Seksyen 29(2), Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal Mengambil Pegawai Keselamatan Dan Kesihatan Di Temat Kerja. RM1,200.00
Ael Engineering Sdn. Bhd. 0000-00-00 Manufacturing Seskyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 31 Disember 2015 Lebih Kurang Jam 2.30 Petang Sebagai Majikan Telah Gagal Untuk Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Terutamanya Rohizam Bin Julasih (No. K/P: 891126-08-5639) Dengan Tidak Menjalankan Pengenalpastian Hazard, Penaksiran Risiko Dan Kawalan Risiko Bagi Penyediaan Dan Pemsangan Jentera Masin Vacuum Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM25,000.00
Everthrough Rubber Products Sdn. Bhd. 0000-00-00 Manufacturing Seskyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 30 Oktober 2015 Lebih Kurang Jam 2.40 Pagi Sebagai Majikan Telah Gagal Untuk Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Termasuklah Bhulon Buddiman (No. Passport: 06893237) Terutamanya Gagal Mengadakan Loji Yang Selamat Bagi Jentera Coll Feed 10? Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM35,000.00
Everthrough Rubber Products Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(b)(aa) Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004, AKKP 1994. Pada 30 Oktober 2015 Lebih Kurang Jam 2.40 Pagi Sebagai Majikan Telah Gagal Dengan Serta Merta Memberitahu Pejabat Jabatan Keselamatan Dan Kesihatan Pekerjaan Yang Terdekat Dengan Cara Yang Paling Cepat Yang Ada Tentang Kemalangan Yang Melibatkan Kecederaan Badan Yang Serius Bagi Pekerja Bhulon Buddiman (No. Passport: 06893237). RM5,000.00
Lian Fatt Timber Trading 0000-00-00 Manufacturing Seksyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Tiada Prosedur Kerja Sehingga Menyebabkan Orang Lain Selain Pekerjanya Maut. RM10,000.00
Teluk Sepanggar Quarry Sdn Bhd 0000-00-00 Quarry Peraturan 26(1) Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Penggunaan dan Standard Pendedahan Bahan Kimia Berbahaya kepada Kesihatan) 2000Gagal Menjalankan Pemantauan Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan . RM2,000.00
Aneka Jaringan Sdn Bhd 0000-00-00 Construction Peraturan 5(1)(b)(bb), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Serta Merta Kemalangan Yang Berlaku dan Mengalihkan Barang Kes Tanpa Kebenaran. RM8,000.00
Msm Perlis Sdn. Bhd. 0000-00-00 Manufacturing SEKSYEN 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada Pengadaan Maklumat Berkaitan Prosedur Kerja Selamat (Sop) Bagi Kerja-Kerja Pemotongan Tangki Simpanan Bahan Api Sederhana. RM8,000.00
Masfloor Sdn. Bhd. 0000-00-00 Manufacturing SEKSYEN 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada Pengadaan Maklumat Berkaitan Prosedur Kerja Selamat (Sop) Bagi Kerja-Kerja 'Memotong Printed Middle Layer'. RM10,000.00
Shorubber (M) Sdn Bhd 0000-00-00 Manufacturing SEKSYEN 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada Perlebelan Pada 12 Mixing Fan. RM11,000.00
Negeri Sembilan Cement Industries Sdn. Bhd. 0000-00-00 Manufacturing SEKSYEN 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada Penyelenggaraan Terhadap Lojinya Iatu Pada Bahagian Hydralic Dumper Mesin Bobcat No.1. RM10,000.00
Megat Zaman Bin Megat Jusoh 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Sebagai Majikan Di No. 88, Kampung Bukit Perpat, 21600 Marang Telah Gagal Memberitahu Dan Melaporkan Kemalangan Pekerjaan Yang Menimpa Nor Azhadi Bin Nordin (Nombor Kad Pengenalan: 771014-11-5315) Yang Menghalang Beliau Menjalankan Tugas Selama Lebih Daripada Empat Hari Kalendar Pada Tarikh 02/12/2016 . RM1,000.00, Penjara:10 Hari
Hap Seng Building Materials Sdn Bhd 0000-00-00 Perlombongan Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Sebagai Majikan Di Alamat Sungai Serai Kuari, Batu 11 ?, Jalan Kuala Berang, Kg. Batu Penunggol, 21400 Marang, Terengganu Telah Gagal Memberitahu Dan Melaporkan Kemalangan Pekerjaan Yang Menimpa Azman Shah Bin Mohd Kasim (Nombor Kad Pengenalan: 660210-05-5039) Yang Menghalang Beliau Menjalankan Tugas Selama Lebih Daripada Empat Hari Kalendar Pada Tarikh 28/07/2015 . RM1,000.00, Penjara:10 Hari
Nichias Fgs Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Membuat Perkiraan Bagi Menjamin, Setakat Yang Praktik, Sehingga Menyebabkan Kecederaan Hilang Upaya Kekal Kepada?Santosh Bishwakarma?(No. Pasport: 08496746). RM3,000.00
Retus Plantation Sb(Retus Palm Oil Mill) 0000-00-00 Manufacturing Seksyen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan, 1994. Gagal Utk Memastikan Pengadaan Penyenggaraan Pada Bahagian Pengadang Jentera. RM20,000.00
Eng Han Engineering Sdn. Bhd. 0000-00-00 Construction Seksyen 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Tidak Mematuhi Notis Larangan (2a 119205) Yang Dikeluarkan Pada 26/04/2016 (Bekerja Tempat Tinggi). RM10,000.00
Sri Binaraya Sdn. Bhd. 0000-00-00 Construction Seksyen 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mematuhi Notis Larangan (2a 119328) Yang Dikeluarkan Pada 19/05/2016 - Pemasangan False Work Yang Tidak Selamat. RM10,000.00
Plas-Tec Industries Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Pada 5 April 2016 Lebih Kurang Jam 12.30 Petang Sebagai Majikan Telah Gagal Untuk Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Termasuklah Mohd Zuhairi Bin Dan (No. Kad Pengenalan: 731025-08-5039) Terutamanya Gagal Memastikan Jentera ?Mixer M1? Dalam Keadaan Selamat Sehingga Menyebabkan Kecederaan Badan Yang Serius. . RM15,000.00
Oka Concrete Industries Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Pada 16 November 2015 Jam 520 Petang Di Premis Beralamat 8 KM, Jalan Gopeng Batu Gajah, 31300 Kampung Kepayang, Perak Telah Gagal Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Temasuklah Hom Bahadur Sen No Paspot 07303480 Dengan Tiada Prosedur Kerja Selamat Semasa Mencuci ?Mixer? Batching Plant No. 4 Sehingga Menyebabkan Kecederaan Badan Yang Serius Iaitu Iaitu Patah Tangan Kiri. RM10,000.00
Sigma Glove Industries Sdn. Bhd 0000-00-00 Manufacturing Peraturan 10, Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Kawalan Terhadap Bahaya Kemalangan Besar dalam Perindustrian) 1996. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Untuk Menyediakan Dan Menyerahkan Dokumen Demonstrasi Operasi Selamat. RM8,000.00
Spr Energy Sdn Bhd 0000-00-00 Facility Peraturan. 9(1) Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Penggunaan dan Standard Pendedahan Bahan Kimia Berbahaya kepada Kesihatan) 2000Gagal Membuat Penaksiran Risiko Bertulis Terhadap Bahan Kimia Berbahaya Kepada Kesihatan Ammonia. RM2,500.00
Mecoplus Industry Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 17(1) (A) Dan (B) Peraturan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Menjalankan Pemeriksaan Dan Pengujian Keberkesanan Ke Atas Sistem Kawalan Kejuruteraan Yang Disediakan Di Kawasan Chemical Mixing And Spray Booth. RM1,800.00
Cm Insulation Enterprise 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memastikan Pekerja Mematuhi PKS Sehingga Berlaku Letupan Bahagian Atas Tangki Short Fiber Storage Semasa Kerja-Kerja Penggantian Struktur Tetulang Yang Melibatkan Kimpalan (Hotworks) Di Gs Packaging Sdn Bhd. RM15,000.00
Shoon Fatt Biscuit & Confectionery Factory 0000-00-00 Manufacturing Seskyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 19 September 2015 Lebih Kurang Jam 4.45 Petang Sebagai Majikan Telah Gagal Untuk Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Terutama Mustafa Bin Mohd Motar (No. Kad Pengenalan : 780213-08-6005) Dengan Tidak Menyediakan Prosedur Kerja Selamat Bagi Kerja-Kerja Penyelenggaraan 'Oven Wafer' Di Tempat Kerja Shoon Fatt Biscuit & Confectionery Factory Sdn. Bhd. Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM5,000.00
Shoon Fatt Biscuit & Confectionery Factory 0000-00-00 Manufacturing Peraturan 5(2) Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004, AKKP 1994. Gagal Menghantar Laporan Kepada Pejabat Jabatan Keselamatan Dan Kesihatan Pekerjaan Yang Terdekat Dalam Tempoh 7 Hari Tentang Kemalangan Yang Menyebabkan Kecederaan Yang Berlaku Ke Atas Pekerja Kamu Mustafa Bin Mohd Motar (No. Kad Pengenalan : 780213-08-6005). RM3,000.00
Eco Medi Glove Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(2) Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004, AKKP 1994. Diantara 28 Ogos 2015 Hingga 22 Disember 2015 Sebagai Majikan Telah Gagal Menghantar Laporan Dalam Masa 7 Hari Tentang Kemalangan Berkaitan Kerja Ke Atas Pekerja Kamu Iaitu, Madai Keshab Bahadur No Pasport 6742333 Kepada Pejabat Jabatan Keselamatan Dan Kesihatan Pekerjaan Dalam Borang Yang Diluluskan. RM1,000.00
Melewar Properties Sdn. Bhd. 0000-00-00 Plantation Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak Menjalankan Perkiraan Sebelum Membenarkan Sahar Saharuddin Mengendalikan Traktor Tanpa Sebarang Risiko. RM20,000.00
Besut Tsuda Wood Production Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Sebagai Majikan Di Km 33, Jalan Kuala Berang, 21800 Ajil, Terengganu Darul Iman Telah Gagal Memberitahu Dan Melaporkan Kemalangan Pekerjaan Yang Menimpa Atikah Binti Muda (Nombor Kad Pengenalan: 780708-11-5218) Yang Menghalang Beliau Menjalankan Tugas Selama Lebih Daripada Empat Hari Kalendar Pada Tarikh 13/04/2015. RM500.00
Trientel Industries Sdn Bhd 0000-00-00 Construction Seksyen. 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mematuhi Notis (2a 009659) Dikeluarkan Pada 27/08/2015. RM10,000.00@Penjara:3 Bulan
Csr Rolling Stock Centre (Malaysia) Sdn. Bhd. 0000-00-00 Manufacturing Seskyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 13 November 2015 Lebih Kurang Jam 5.30 Petang Sebagai Majikan Telah Gagal Untuk Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Terutamanya Mohd Fazly Bin Shamsuddin (No. K/P: 880225-08-5411) Dengan Tidak Menyediakan Prosedur Kerja Yang Selamat Bagi Kerja-Kerja Memasang 'Railey Kabinet' Di Dalam Gerabak Di Tempat Kerja Csr Rolling Stock Centre (Malaysia) Sdn. Bhd. Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM30,000.00
T-Prin Panel Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 17(1)(a) dan (b) Peraturan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000 AKKP 1994. Gagal Menjalankan Pemeriksaan Dan Pengujian Keberkesanan Ke Atas Sistem Kawalan Kejuruteraan Yang Disediakan Iaitu 'Dust Collector'. RM2,000.00
Csr Rolling Stock Centre (Malaysia) Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1)Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 13 November 2015 Lebih Kurang Jam 5.30 Petang Sebagai Majikan Telah Gagal Untuk Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Terutamanya Mohd Fazly Bin Shamsuddin (No. K/P: 880225-08-5411) Dengan Tidak Menyediakan Prosedur Kerja Yang Selamat Bagi Kerja-Kerja Memasang 'Railey Kabinet' Di Dalam Gerabak Di Tempat Kerja Csr Rolling Stock Centre (Malaysia) Sdn. Bhd. Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM30,000.00
Dive Aquatic Services Sdn Bhd 0000-00-00 Perkhidmatan Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Tempat Kerja Selamat Sehingga Menyebabkan Kematian. RM20,000.00
Jaks Sdn Bhd 0000-00-00 Construction Seksyen 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Majikan Gagal Memastikan Orang Lain Selain Pekerja Agar Tidak Terdedah Kepada Risiko Keselamatan Dan Kesihatan Yang Berkaitan Kerja-Kerja Pemasangan Glass Awning. RM30,000.00
Ekl Metal Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Majikan Gagal Memastikan Pekerja Mereka Agar Bhd Tidak Terdedah Kepada Risiko Keselamatan Dan Kesihatan Yang Berkaitan Kerja-Kerja Pemasangan Glass Awning. RM30,000.00
Ngan Yin Groundnut Factory Sdn. Bhd. 0000-00-00 Manufacturing Seskyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 19 Mac 2016 Jam 1100 Pagi Telah Gagal Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Temasuklah Ho Hooi Tong No Kad Pengenalan 500512-08-5089 Terutamanya Dengan Tiada Prosedur Kerja Selamat Semasa Bekerja Ditempat Tinggi Sehingga Menyebabkan Kemalangan Maut. RM20,000.00
Ngan Yin Groundnut Factory Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(a)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan 2004 AKKP 1994. Pada 19 Mac 2016 Lebih Kurang Jam 200 Petang Sebagai Penghuni Telah Gagal Melaporkan Serta Merta Dengan Cara Tercepat Sedia Ada Tentang Kemalangan Pekerjaan Yang Menyebabkan Maut Terhadap Pekerja Kamu, Ho Hooi Tong No Kad Pengenalan 500512-08-5089 Kepada Pejabat Jabatan Keselamatan Dan Kesihatan Pekerjaan Perak. RM50,000.00
Firstex Knitting Ind. Sdn. Bhd. 0000-00-00 Manufacturing Peraturan. 5(1)(a)(aa) dan (bb)- Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (NADOPOD) 2004, Akta Keselamatan & Kesihatan Pekerjaan, 1994. Gagal Memberitahu Jkkp Mengenai Kejadian Berbahaya Yang Berlaku Di Tempat Kerja. RM2,000.00
Borong Din Cs Beseri 0000-00-00 Borong Dan Runcit Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Tiada Peyediaan Prosedur Kerja Selamat (Sop) Dan Latihan Kepada Pekerja Berkaitan Pengendalian Mesin Forklift. RM5,000.00
Fancy Signs Sdn Bhd 0000-00-00 Construction Seksyen 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mematuhi Notis (2a 001678) Dikeluarkan Pada 13/01/2016. RM20,000.00
Weststar Construction Sdn Bhd 0000-00-00 Construction Peraturan 5 (1) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Serta Merta Kemalangan Yang Berlaku Dan JKKP 6. RM8,000.00
Cheksern Young Builders Sdn Bhd 0000-00-00 Construction Peraturan 5 (1) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Serta Merta Kemalangan Maut Yang Berlaku Yang Berlaku Dan JKKP 6. RM9,000.00
Panasonic Jv, Panasonic Eco Solutions Malaysia Sdn Bhd. 0000-00-00 Construction Peraturan 5 (1) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Serta Merta Kemalangan Maut Yang Berlaku Yang Berlaku Dan JKKP 6. RM9,000.00
Dominiom Rubber Co. (M) Sdn Bhd 0000-00-00 Plantation Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1995. Gagal Menyediakan Latihan Dan Penyeliaan Yang Perlu Untuk Pekerja Baru Sehingga Maut Di Tempat Kerja. RM5,000.00
Teng Yue Overseas Construction Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Tempat Kerja Selamat Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
Lian Fung Construction (Cheras) Sdn Bhd 0000-00-00 Construction Seksyen 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mematuhi Notis (2a 001679) Dikeluarkan Pada 13/01/2016. RM20,000.00
Impian Binaraya Sdn. Bhd. 0000-00-00 Construction Seksyen 29(2), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengambil Kerja Pegawai Keselamatan (Projek pembinaaan yang melebihi 20 Juta). RM3,000.00
Cheksern Young Builders Sdn Bhd 0000-00-00 Construction Peraturan 9, Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Mengalihkan Barang Kes Tanpa Kebenaran. RM10,000.00
Panasonic Jv, Panasonic Eco Solutions Malaysia Sdn Bhd. 0000-00-00 Construction Seksyen 29(2), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melantik Pegawai Keselamatan Dan Kesihatan. RM3,500.00
Soon Lee Poultry Farm Sdn Bhd 0000-00-00 Penternakan Peraturan 5(1)(a)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 . Gagal Melaporkan Kemalangan Segera. RM2,000.00
Kij Filtration Supreme Sdn Bhd 0000-00-00 Construction Seksyen 10(d) Akta Kilang dan Jentera. Gagal Mengambil Apa-Apa Cara Untuk Memberi Melaksanakan Dan Menggunakan Akses Yang Selamat. RM10,000.00
Kobe Welding Sdn Bhd 0000-00-00 Manufacturing Seksyen 35(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Menggunakan Bahan-Bahan Yang Dilarang Penggunaannya Iaitu N-Hexane. RM5,000.00
Southern Pipe Industry Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1)Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak Menyediakan Prosedur Kerja Selamat Bagi Aktiviti. RM5,000.00
Msm Perai 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Menyediakan Prosedur Kerja Selamat Bagi Kerja-Kerja Mengangkat Guni Gula. RM5,000.00
Federal Fertliser Sdn Bhd 0000-00-00 Manufacturing Seksyen 17(1) -Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Memastikan Pengadaan Dan Penyelenggaraan Loji Setakat Yang Praktik, Selamat Sehingga Tidak Menjejaskan Keselamatan Dan Kesihatan Pekerja Lain. RM8,000.00
Malayan Flour Mills Berhad 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 13 November 2015 Lebih Kurang Jam 10.00 Pagi Sebagai Majikan Telah Gagal Memastikan Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Terutama Yahaya Bin Abu Bakar (No. K/P:871204-08-5119) Terutamanya Gagal Mengadakan Jentera Yang Selamat Bagi Proses Pembungkusan Tepung 1 Kg Di Bahagian Pembungkusan Tepung Kilang Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM10,000.00
Tasek Iron & Steel Foundry Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal Memastikan Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Termasuklah Lee Ah Mooi @ Lee Nyoot Meng (No Kp 491130-08-5006) Terutamanya Dengan Tidak Menyediakan Prosedur Kerja Selamat Bagi Kerja-Kerja Menyalakan Riser Sehingga Menyebabkan Kecederaan Tubuh Badan Yang Serius. RM15,000.00
Tasek Iron & Steel Foundry Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(b)(aa)(bb) Peraturan-peraturan Keselamtan dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 AKKP 1994. Gagal Dengan Serta Merta Memberitahu Pejabat Jabatan Keselamatan Dan Kesihatan Pekerjaan Yang Terdekat Dengan Cara Yang Paling Cepat Yang Ada Dan Dalam Masa 7 Hari Menghantar Laporan Tentang Kemalangan Yang Berlaku Pada 3 Februari 2016 Yang Menyebabkan Kecederaan Yang Berlaku Ke Atas Pekerja Iaitu Lee Ah Mooi @ Lee Nyoot Meng (No K/P 491130-08-5006). RM5,000.00
Uptown Invention Sdn. Bhd. 0000-00-00 Business Trade Seksyen 19(1) Akta Kilang dan Jentera 1967. Pada 6 Jun 2016 Jam 8.30 Lebih Kurang Jam 8.30 Malam Telah Mengoperasikan 1 Unit Mesin Angkat, Eskalator Bernombor Pendaftaran Pma70357 (No. Siri: 50029) Tanpa Sijil Kelayakan Yang Sah Di Lot 9855, Bagan Serai Mall, Jalan Siakap, 34300 Bagan Serai, Perak. RM3,000.00
Mentari Berseri Sdn Bhd 0000-00-00 Construction Seksyen 15(2) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada Prosedur Tuang Konkrit. RM10,000.00
Sedia Bena Sdn Bhd 0000-00-00 Construction Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada Sistem Kerja Yang Selamat. RM10,000.00
Sin Guan Hup Rice Mills Sdn Bhd 0000-00-00 Manufacturing Seksyen 19(1) Akta Kilang dan Jentera. Jentera Dikendalikan Tanpa Sijil Perakuan Kelayakan Yang Sah. RM10,000.00
Aroma Developement Sdn Bhd 0000-00-00 Construction Seksyen 29(2) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak Melantik Pegawai Keselamatan Dan Kesihatan Yang Kompeten. RM3,000.00
Patsifit Construction Sdn Bhd 0000-00-00 Construction Seksyen 19(1) Akta Kilang dan Jentera. Jentera Tiada Cf. RM6,000.00
Bkb Hevea Products Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 21 Februari 2016 Lebih Kurang Jam 11.20 Pagi Di Bahagian Profiling Sebagai Majikan Telah Gagal Memastikan Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Terutamarobidah Binti Dolah (No. K/P: 660527-08-6546) Dengan Tidak Menyediakan Pengadang Yang Sempurna Pada Mesin Radial Arm Saw Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM25,000.00
Uniplaster Industries Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal Memastikan Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Termasuklah Mahato Sanjay Kumar (No Passpot 07136482) Terutamanya Dengan Tidak Menyediakan Pengadang Yang Sempurna Pada Mesin Fibre Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM25,000.00
Gasing Potensi Construstion Sdn. Bhd. 0000-00-00 Quarry Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal Memastikan Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Termasuklah Ahmad Syahrir Bin Abdul Sukor (No Kad Pengenalan: 871008-08-5517) Terutamanya Dengan Tidak Menyediakan Cara Kerja Yang Selamat Bagi Kerja Membuat Lubang (Drilling)Bagi Tujuan Blasting Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
Choongcons (M) Sdn Bhd 0000-00-00 Construction Seksyen 29(2) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak Melantik Pegawai Keselamatan Dan Kesihatan Yang Kompeten. RM2,000.00
Great Sesama Enterprise 0000-00-00 Business Trade Peraturan 5(1)(a)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004. Gagal Melaporkan Kemalangan Segera. RM3,000.00
Northen Dolomite Sdn. Bhd 0000-00-00 Quarry Peraturan 9, Peraturan Kilang Dan Jentera (HABUK GALIAN) 1989. Gagal Menjalankan Permonitoran Habuk Dan Galian Kepada Pekerja. RM300.00
Hovid Bhd. 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal Memastikan Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Termasuklah Logeswaran A/L Ramasamy (No Kp: 771205-08-5251) Dengan Tidak Menyediakan Prosedur Kerja Selamata Bagi Kerja Penyelenggaraan Motor High Speed Mixer (Ns: 3Gc11500478027059009) Sehingga Menyebabkan Kecederaan Mata Yang Serius. RM15,000.00
Stmicroelectronics Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Tempat Kerja Selamat Sehingga Menyebabkan Kematian. RM25,000.00
Linde Malaysia Sdn Bhd 0000-00-00 Manufacturing Seksyen 23, Akta Keselamatan dan Kesihatan Pekerjaan 1995. Gaggal Menyelenggara Peranti Keselamatan Sehingga Menyebabkan Kematian. RM8,000.00
Am-El Construction Sdn. Bhd. 0000-00-00 Construction Seskyen 17(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Gagal Memastikan Setakat Yang Praktik, Keselamatan Atau Kesihatan Semasa Bekerja Kepada Orang-Orang Lain Yang Bukan Pekerjanya Dengan Tidak Menyediakan Prosedur Kerja Selamat Bagi Keluar Masuk Kontraktor Luar Yang Menjalankan Kerja Rombakan Kren Menara Pma17296 Di Tapak Bina Projek Pembinaan Perumahan Kondominum 25 Tingkat Crystal Creek. RM10,000.00
Nippon Steel & Sukimin Biomass Coke (M) Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 27 April 2016 Lebih Kurang 8.50 Malam Sebagai Majikan Telah Gagal Memastikan Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Terutama Che Mohd Bukhari Bin Che Abdullah (No. Passport:970413-03-5429) Dengan Tidak Mengadakan Jentera Yang Selamat Iaitu Briquette No. 6 (No. Siri Motot: H7135312006) Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM15,000.00
Yokohama Reclamation Sdn. Bhd. 0000-00-00 Manufacturing Seskyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 23 Ogos 2015 Jam 1040 Pagi Telah Gagal Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Temasuklah Mohd Nuri Bin Che Ni No Kad Pengenalan 700723-08-6045 Terutamanya Pada 23 Ogos 2015 Jam 1040 Pagi Telah Gagal Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Temasuklah Mohd Nuri Bin Che Ni No Kad Pengenalan 700723-08-6045 Terutamanya Gagal Mengadakan Maklumat Sebagaimana Perlu Sehingga Menyebabkan Kecederaan Anggota Badan Yang Serius. RM15,000.00
Gx Corporation Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 10, Peraturan-peraturan Keselamatan dan Kesihatan Pekerjaan (Kawalan Terhadap Bahaya Kemalangan Besar dalam Perindustrian) 1996. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Untuk Menyediakan Dan Menyerahkan Dokumen Demonstrasi Operasi Selamat. RM15,000.00
Hl Porcelain Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994 . Pada 22 Mac 2016 Di Antara Jam 3.00 Petang Hingga 3.30 Petang Sebagai Majikan Telah Gagal Memastikan Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Terutama Shajit Kumar Yadav (No. Passport: 06325998) Dengan Tidak Menyediakan Prosedur Kerja Selamat Bagi Kerja Pengendalian Kiln Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM9,000.00
Ars Builders Sdn. Bhd. 0000-00-00 Construction Peraturan 5(1)(a)(aa) Peraturan-peraturan Keselamtan dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 AKKP 1994. Gagal Dengan Serta Merta Memberitahu Pejabat Jkkp Perak Tentang Kemalangan Maut Ke Atas Daud Bin Mat Isa (No Kp: 750221-10-5395) Di Jln Kolam 2, Kg Expo, Kamunting, Perak. RM1,500.00
Ireka Engineering & Construction Sdn Bhd 0000-00-00 Construction Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memastikan Setakat Yang Praktik Keselamatan Pekerja Dengan Mengadakan Prosedur Kerja Selamat bagi kerja-kerja Mengangkat Barang Dengan Mengunakan Kren Menara. RM40,000.00 Penjara:8 Bulan
Eec Construction Sdn Bhd 0000-00-00 Construction Seksyen 17(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memastikan Setakat Yang Praktik Keselamatan Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Selain Dari Pekerja Bagi Aktiviti Mengangkat Menggunakan Kren Menara. RM40,000.00 Penjara:8 Bulan
Kembang Serantau Sdn Bhd 0000-00-00 Construction Seksyen 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mematuhi Notis Larangan Bernombor Siri 2A 025049 Yang Melarang Penggunaan Kren Menara Bagi Kerja-Kerja Mengangkat. RM35,000.00 Penjara:6 Bulan
Ladang Leong Hin San 0000-00-00 Agriculture Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM700.00
Lee Onn Construction Co 0000-00-00 Construction Seksyen 10 (e) Akta Kilang Dan Jentera 1967 , Peraturan 12 Peraturan-Peraturan (Keselamatan, Kesihatan Dan Kebajikan) Kilang dan Jentera, 1970 , Peraturan 12 Peraturan -Peraturan (Keselamatan, Kesihatan Dan Kebajikan) Kilang dan Jentera, 1970 1. Gagal Untuk Memagar Dengan Kukuh Tingkat Bekerja Untuk Menghalang Orang Terjatuh. 2. Gagal Untuk Menyediakan Cara-Cara Keselamatan Semasa Menjalankan Kerja Penyediaan Kerja Bumbung Dan Jika Praktik, Cara-Cara Itu Hendaklah Termasuk Menggunakan Talisawat-Talisawat Atau Tali-Tali Keledar Sekiranya Seseorang Dikehendaki Bekerja Pada Suatu Tempat Dari Mana Ia Mungkin Terjatuh Dari Setinggi Lebih 10 Kaki. 3. Gagal Untuk Menyediakan Cara-Cara Keselamatan Semasa Menjalankan Kerja Plastering Dan Jika Praktik, Cara-Cara Itu Hendaklah Termasuk Menggunakan Talisawat-Talisawat Atau Tali-Tali Keledar Sekiranya Seseorang Dikehendaki Bekerja Pada Suatu Tempat Dari Mana Ia Mungkin Terjatuh Dari Setinggi Lebih 10 Kaki. RM21,200.00
Daya Builders Sdn Bhd 0000-00-00 Construction Per 5(1)(a)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan dan Penyakit Pekerjaan) 2004 , Seksyen 29 (2) Akta Keselamatan dan Kesihatan Pekerjaan, 1994. 1. Gagal Dalam Masa 7 Hari Untuk Menghantar JKKP 6 2. Gagal Untuk Mengambil Kerja Orang Yang Kompeten Untuk Bertindak Sebagai Pkk. RM4,500.00
Floor Tech Resources Sdn Bhd (Ulu Layar) 0000-00-00 Construction Seksyen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan, 1994. Gagal Untuk Pengadaan Perkiraan Termasuk Prosedur Kerja Selamat Untuk Menjalankan Aktiviti-Aktiviti Kerja Pemasangan Paip Dalam Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Kepada Semua Pekerjanya Khususnya Joejer Anak Piwan @Ubang (930415-13-5793) Yang Telah Mengakibatkan Kemalangan Maut. RM10,000.00
Seni Kenanga Sdn. Bhd. 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Sebagai Majikan Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Pekerjanya Sehingga Menyebabkan Kemalangan Maut Berlaku. RM25,000.00 Penjara:2 Bulan
Tan Chong Motor Assemblies Sdn Bhd 0000-00-00 Penyimpanan Seksyen 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Penyeliaan Bagi Kerja-Kerja Mengeluarkan Chimney Dan Mengeluarkan Bumbung Oleh Kontraktor Yang Dilantik (Mentari Jaya Enterprise Sdn Bhd). RM30,000.00
Pjd Construction Sdn Bhd 0000-00-00 Construction Seksyen 17(1) -Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada Sistem Kerja Yang Selamat. RM5,000.00
Gts Contractor Sdn Bhd 0000-00-00 Construction Seksyen 29(2), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengambil Orang Kompeten Sebagai Pegawai Keselamatan Dan Kesihatan Di Tempat Kerja. RM3,000.00
Gts Contractor Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Susur Tangga Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
Four Season Timber Trading 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Pengadang Yang Selamat Pada Conveyor Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
Transgreen Construction Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Pelantar Kerja Yang Selamat Sehinggga Mengakibatkan Kemalangan Maut. RM28,000.00
Johor Port Berhad 0000-00-00 Transportation Seksyen 18(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memastikan Langkah Yang Praktik Untuk Kegunaan Selain Daripada Pekerjanya. RM30,000.00
Binatex Sdn Bhd 0000-00-00 Construction Seksyen 15 (1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Menyediakan Pelantar Kerja Yang Selamat Berkaitan Aktiviti Kerja Pemotongan Saluran Paip Tandas. RM21,000.00
Comfort Expand Sdn Bhd 0000-00-00 Construction Seksyen 15 (1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Menyediakan Sistem Kerja Selamat Berkaitan Pemasangan Perancah Luar Bangunan Sebagai Platform Kerja. RM25,000.00
Putra Perdana Contsruction Sdn Bhd 0000-00-00 Construction Seksyen 17(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Kewajipan Tiap-Tiap Majikan Dan Tiap-Tiap Orang Yang Bekerja Sendiri Untuk Menjalankan Pengusahaannya Dengan Cara Memastikan Setakat Yang Praktik, Bahawa Dia Dan Orang-orang. Lain Yang Bukan Pekerjanya Tersentuh oleh Pengusahaannya Itu Tidak Terdedah Dengan Risiko Kepada Keselamatan & Kesihatan Pekerjaan. RM25,000.00
Tidy Locks & Fittings Sdn Bhd 0000-00-00 Manufacturing Peraturan 20,Peraturan-peraturan (Orang Menjaga) Kilang dan Jentera. Akta Kilang dan Jentera 1967. Gagal Mengadakan Latihan Dan Penyeliaan Terhadap Pengendali Trak Ansun. RM10,000.00
Jalash Sdn Bhd 0000-00-00 Construction Seksyen 18(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1995. Gagal Memastikan Struktur Perancah Selenggara Dan Diperiksa Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
China State Construction Engineering (M) Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Tempat Kerja Selamat Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
Twin Unitrade Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Sistem Kerja Yang Selamat Sehingga Menyebabkan Kemalangan Maut. RM40,000.00
Twin Unitrade Sdn Bhd 0000-00-00 Construction Seksyen 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mematuhi Notis Larangan. RM55,500.00
Twin Unitrade Sdn Bhd 0000-00-00 Construction 5(1)(a)(aa), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memberitahu Dengan Serta-Merta Kemalangan Maut Ke Pejabat JKKP Terdekat. RM8,000.00
Saharil Holdings Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melakukan Penyeliaan Keatas Loji Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
Saharil Holdings Sdn Bhd 0000-00-00 Construction 5(1)(a)(aa),Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memberitahu Dengan Serta-Merta Kemalangan Maut Ke Pejabat JKKP Terdekat. RM6,000.00
Oriental Genesis Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Tempat Kerja Yang Selamat Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
Mentari Jaya Enterprise Sdn Bhd 0000-00-00 Construction Sek. 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Prosidur Kerja Selamat Bagi Kerja-Kerja Mengeluarkan Chimney Dan Mengeluarkan Bumbung. RM15,000.00
Sing Seng Heng 0000-00-00 Penyimpanan Sek. 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memastikan Bukan Pekerja Tdak Teredah Kepada Risisko Semasa Menjalankan Kerja-Kerja Elektrik Di Stor. RM10,000.00 Penjara:2 Bulan
Bina Masyhur Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengadakan Sistem Kerja Yang Selamat Sehingga Menyebabkan Kemalangan Maut. RM10,000.00
Maju Intan Biomass Energy Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 26(1), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000Di Antara 8 Jun 2015 Hingga 3 Mei 2016 Gagal Menjalankan Pemantauan Pendedahan Di Tempat Kerja Seperti Yang Dicadangkan Oleh Pengapit Dalam Laporan Penaksiran Risiko Kepada Kesihatan. RM3,000.00
Ktl Offshore (Malaysia) Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memastikan Sistem Kerja Yang Selamat Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
Seng Hiap Glass Sdn Bhd 0000-00-00 Construction Seksyen 15(2), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Membuat Perkiraan Setakat Yang Praktik Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
Kimlun Sdn Bhd (Kempas) 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memastikan Sistem Kerja Yang Selamat Sehingga Menyebabkan Kemalangan Maut. RM45,000.00
Sejota Sdn Bhd 0000-00-00 Construction Seksyen 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Membuat Kawalan Keluar Dan Masuk Orang Awam Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
Seni Kenanga Sdn. Bhd. 0000-00-00 Construction Seksyen 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mematuhi Notis (2a 009115) Dikeluarkan Pada 13/05/2015. RM20,000.00
Seri Delima Anggun Sdn Bhd 0000-00-00 Construction Seksyen. 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mematuhi Notis (2a 001382) Dikeluarkan Pada 18/02/2016. RM19,500.00
Sbn Industries Sdn Bhd 0000-00-00 Manufacturing Peraturan 20Peraturan-peraturan (Orang Menjaga) Kilang dan Jentera. Akta Kilang dan Jentera 1967. Gagal Menyediakan Penyeliaan & Latihan Kepada Pengendali Jentera Mesin Himpit Kuasa. RM35,000.00
Heng Hup Recycle Sdn.Bhd 0000-00-00 Manufacturing Seksyen 15, Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memastikan Setakat Yang Praktik Keselamatan Dan Kebajikan Semasa Bekerja. RM10,000.00 Penjara:6 Bulan
Yli Industry Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Pada 16 Jun 2016 Di Antara Jam 9.00 Pagi Hingga 10.00 Pagi Telah Gagal Memastikan, Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerja Kamu Temasuklah Mohamad Syafiq Bin Ahmad (No. K/P: 920310-08-5073) Dengan Tidak Menyediakan Loji Yang Yang Selamat Bagi Mesin Power Press No. 33? Sehingga Menyebabkan Kecederaan Badan Yang Serius. RM20,000.00
Recron (M) Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Menyediakan Prosedur Kerja Selamat. RM15,000.00
Syarikat Kontraktor Fna Sdn Bhd 0000-00-00 Business Trade Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Menyediakan Prosedur Kerja Selamat (PTW). RM20,000.00
Ctrm Aero Sdn.Bhd 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM1,500.00
Tauplene Industries S/B 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM2,500.00 Penjara:3 Bulan
Pw Nutri Eggs Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Kegagalan Yang Berhubung Dengan Kemalangan Maut Yang Melibatkan Pekerjanya Bernama Chapagai Bikash. RM15,000.00
Pw Nutri Eggs Sdn. Bhd. 0000-00-00 Manufacturing Peraturan. 5(1)(a)(aa)dan (bb), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memberitahu JKKP Mengenai Kemalangan Maut Yang Berlaku Di Tempat Kerja. RM5,000.00
Mardec Industrial Latex Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(b)(aa)(bb) Peraturan-Peraturan Keselamtan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Pada 3 Mac 2016 Lebih Kurang Jam 2.15 Petang Sebagai Majikan Telah Gagal Dengan Serta Merta Memberitahu Pejabat Jabatan Keselamatan Dan Kesihatan Pekerjaan Yang Terdekat Dengan Cara Yang Paling Cepat Yang Ada Dan Dalam Masa Tujuh Hari Menghantar Laporan Tentang Kemalangan Yang Berlaku Pada 3 Mac 2016 Dalam Borang Yang Diluluskan Bagi Pekerja Mohd Azman Bin Mohd Ali (Nombor Kad Pengenalan: 830221-08-6403). RM2,000.00
Pristine Growth Sdn Bhd /Bintulu Port 0000-00-00 Construction Seksyen 15 (1). Akta Keselamatan dan Kesihatan Pekerjaan, 1994. Gagal Memastikan Setakat Yang Praktik Keselamatan, Kesihatan Dan Kebajikan Pekerja Semasa Kerja-Kerja Membaiki Bumbung Sehingga Menyebabkan Kematian Seorang Pekerja Wahyudin (No. Passport: A 6206477) Akibat Terjatuh Dari Tempat Tinggi. RM5,000.00
Ns Cement Industries Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1). Akta Keselamatan Dan Kesihatan Pekerjaan, 1994. Gagal Menyelia Penggunaan Forklift. RM8,000.00
Sung Yu Corporation (M) Sdn Bnd 0000-00-00 Business Trade Seksyen 15(1). Akta Keselamatan Dan Kesihatan Pekerjaan, 1994. Gagal Menyelia Penggunaan Forklift. RM7,000.00
Malaysian Mosaics Sdn Bhd 0000-00-00 Manufacturing Seksyen 18(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memastikan Premis Selamat Untuk Kegunaan Selain Daripada Pekerjanya. RM13,000.00
Kkn Construction Sdn Bhd 0000-00-00 Construction Seksyen 15, Akta Keselamatan Dan Kesihatan Pekerjaan, 1994. Gagal Memastikan Setakat Yang Praktik Keselamatan Dan Kebajikan Semasa Bekerja. RM12,000.00 Penjara:4 Bulan
Unimexco Industries Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan, 1994. Pada 7 Mei 2016 Lebih Kurang Jam 4.00 Pagi Di Premis Beralamat Di Lot 24, Jalan Industri 3/1, Kawasan Perindustrian Gopeng, 31600 Gopeng, Perak Sebagai Majikan Telah Gagal Untuk Memastikan Bahagian Yang Berbahaya Iaitu Ruang Mata Pemotong Mesin ?PVC Extrution Profile No.6? Dipagar Dengan Kukuh Dan Selamat Kepada Setiap Pekerja Termasuklah Kepada Budha Til Bahadur (No. Passport : 06609536) Sehingga Menyebabkan Kecederaan Tubuh Badan Yang Serius. RM10,000.00
Vertex Success Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamtan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM1,500.00 Penjara:1 Bulan
Kim Poh Brick Sdn Bhd 0000-00-00 Manufacturing Per 5(1)(A)(Aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004 , Seksyen 29 (2) Akta Keselamatan Dan Kesihatan Pekerjaan, 1994. Gagal Dalam Masa 7 Hari Untuk Menghantar JKKP 6. RM5,000.00
Flextronics Prai 0000-00-00 Manufacturing Peraturan 10, (Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Kawalan Terhadap Bahaya Kemalangan Besar Dalam Perindustrian) 1996, Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Menyediakan Dokumen Operasi Selamat. RM7,000.00
Asia Plywood Co. Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 27, Peraturan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Kegagalan Menjalankan Program Pengawasan Perubatan. RM8,000.00
Tm Air Conditioning Sdn Bhd 0000-00-00 Construction Per.10 (Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Kawalan Terhadap Bahaya Kemalangan Besar Dalam Perindustrian) 1996, Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Menyediakan Dokumen Operasi Selamat. RM8,000.00
Mrcb Builders Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mengdakan Penyeliaan Sebagaimana Yang Perlu Sehingga Menyebabkan Kemalangan Maut. RM30,000.00
Leong Hup Feedmill Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamtan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM1,500.00 Penjara:15 Hari
Lum Mah Plastic & Printing (M) Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamtan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM1,500.00 Penjara:15 Hari
Walsin Precision Sdn Bhd 0000-00-00 Manufacturing Peraturan 7(1), Peraturan-Peraturan Keselamtan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM1,200.00 Penjara:15 Hari
Jonfong Wood Products Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamtan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM1,500.00 Penjara:15 Hari
Twenty-Twenty Food Industry Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Kegagalan Membuat Perkiraan Serta Pengadaan Maklumat, Arahan Dan Latihan Hingga Menyebabkan Kecederaan Hilang Upaya Kekal Kepada Kyaw Thu Lin. RM5,000.00
Synergy Precision Industries Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(A)(Aa) Peraturan-Peraturan Keselamtan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004 AKKP 1994. Pada 8 April 2016 Lebih Kurang Jam 12.30 Tengahari Sebagai Majikan Telah Telah Gagal Dengan Serta Merta Memberitahu Pejabat Jabatan Keselamatan Dan Kesihatan Pekerjaan Yang Terdekat Dengan Cara Yang Paling Cepat Yang Ada Tentang Kemalangan Maut Yang Berlaku Pada 8 April 2016 Bagi Pekerja Chai Koh Lim (Nombor Kad Pengenalan: 670315-06-5347). RM300.00
Pwc Bina Sdn Bhd 0000-00-00 Construction Seksyen 49(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Mematuhi Nop (2a 001804). RM5,000.00 Penjara:1 Bulan
Pwc Bina Sdn Bhd 0000-00-00 Construction Seksyen 19(1), Akta Kilang & Jentera 1967. Pengendalian Jentera (Gondola) Tanpa CF Pertuduhan 1 - No.Siri: 61312264. RM7,500.00 Penjara:1 Bulan
Pwc Bina Sdn Bhd 0000-00-00 Construction Seksyen 19(1), Akta Kilang & Jentera 1967. Pengendalian Jentera (Gondola) Tanpa CF Pertuduhan 2 - No.Siri: 61321245). RM7,500.00 Penjara:1 Bulan
Geohan Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Sebagai Majikan, Gagal Untuk Memastikan Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya Hingga Berlaku Kemalangan Maut Semasa Melakukan Aktiviti Borepile. RM25,000.00
Pahang Enterprise Sdn Bhd 0000-00-00 Plantation Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1995. Gagal Memastikan Setakat Yang Praktik Keselamatan Pekerjanya Yang Sedang Bekerja. RM10,000.00
Miyao-Toki (M) Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Kegagalan Membuat Perkiraan Serta Pengadaan Maklumat, Arahan Dan Latihan Hingga Menyebabkan Kecederaan Hilang Upaya Kekal Kepada Mohd Syarudin Bin Mohd Sharif. RM2,500.00
Billion Wind Sdn. Bhd. 0000-00-00 Construction Seksyen 29(2), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Tiada Pegawai Keselamatan Dan Kesihatan Pekerjaan. RM2,000.00
Ucsi Campio Builders Sdn. Bhd. 0000-00-00 Construction Seksyen 29(2), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Tiada Pegawai Keselamatan Dan Kesihatan Pekerjaan. RM2,000.00
Cosign Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 19(1) Akta Kilang & Jentera 1967. Mengendalikan Satu Unit Jentera Air Compressor Tanpa Mempunyai Sijil Perakuan Kelayakan Yang Sah. RM5,000.00
Rensoon Industries (M) Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 16(3)(A) , Peraturan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Pada 27 Jun 2016 Lebih Kurang Jam 10.00 Pagi Sebagai Majikan Telah Gagal Mengadakan Kelengkapan Pelindung Diri Jenis Yang Diluluskan Yang Diberikan Kepada Pekerja Sesuai Dengan Jenis Kerja Spray Menggunakan Bahan Kimia Berbahaya Kepada Kepsihatan Iaitu NC Top Coat, AC Sealer Dan Solvent (535) Kepada Pekerja Yang Diambil Kerja. RM400.00
Rensoon Industries (M) Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 17(1)(B) Peraturan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Pada 27 Jun 2016 Lebih Kurang Jam 10.00 Pagi Sebagai Majikan Telah Gagal Memastikan Kelengkapan Kejuruteraan Iaitu 1 Unit Jenis 'Spray Water Booth' (No. 1) Diperiksa Dan Diuji Keberkesanan Oleh Juruteknik Higien Pada Lat Tempoh Yang Sesuai, Setiap Lat Tempoh Tidak Lebih Dari Dua Belas Bulan. RM400.00
Rensoon Industries (M) Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 6, Peraturan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Pada 20 Oktober 2016 Lebih Kurang Jam 10.00 Pagi Sebagai Majikan Telah Gagal Untuk Memastikan Pendedahan Mana-Mana Oranag Kepada Mana-Mana Bahan Kimia Berbahaya Kepada Kesihatan Yang Disenaraikan Pada Bila-Bila Masa Tidak Melebihi Had Siling Yang Ditetapkan Iaitu 0.37 Mg/M3 Bagi Formaldehyde Dalam Jadual 1. RM500.00
Proven Construction Development Sdn Bhd 0000-00-00 Construction Peraturan 5(1)(a) (aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM5,000.00
Koon Huat Agriculture Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM5,000.00 Penjara:5 Bulan
Wah Sang Plumbing & Sanitary Construction 0000-00-00 Construction Peraturan 5, Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kejadian Kemalangan Yang Berlaku Di Tempat Kerja Kepada Pihak Jabatan. RM2,000.00
A.M.I Construction Sdn. Bhd. 0000-00-00 Construction Seksyen 29(2) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Tidak Melantik Sho Yang Kompetan Di Tapak Pembinaan. RM2,000.00
B.S Civil Engineering Sdn Bhd 0000-00-00 Construction Seksyen 15(1) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Tiada Pengadaan Maklumat Berkaitan Prosedur Kerja Selamat (SOP) Bagi Kerja-Kerja Di Kawasan Arus Berus Tinggi. RM10,000.00
Jadi Maging Technologies Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memastikan Setakat Yang Praktik. Keselamatan, Kesihatan Dan Kebajikan Dengan Tidak Mengadakan Prosedur Kerja Selamat Sehingga Mengakibatkan Berlaku Kemalangan Putus Jari Kelingking Mangsa. RM10,000.00
Heritage Drinks 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM5,000.00 Penjara:5 Bulan
Bssb Leather And Fabric Beds Sdn Bhd 0000-00-00 Manufacturing Peraturan. 5(1)(b)(aa)(bb) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Memberitahu Dan Melaporkan Kemalangan Huk (Jari Terpotong) Pada 28/1/2016. RM6,000.00 Penjara:14 Hari
Epoly Packaging Sdn.Bhd 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM1,000.00 Penjara:12 Hari
Uny Auto Sdn.Bhd 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Dalam Masa 7 Hari. RM1,200.00 Penjara:12 Hari
Y.B. Timber & Concrete Products 0000-00-00 Manufacturing Peraturan 27(1), Peraturan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Menjalankan Program Pengawasan Kesihatan Terhadap Pekerjanya. RM2,000.00
Aligan Industries Sdn. Bhd. 0000-00-00 Construction Seksyen 17(1), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Sebagai Majikan, Gagal Untuk Menjalankan Pengusahaannya Dengan Cara Memastikan Setakat Yang Praktik, Bahawa Orang2lain Yang Bukan Pekerjanya, Yang Mungkin Tersentuh Oleh Pengusahaannya Itu Tidak Terdedah Kepada Risiko Kepada Keselamatan Dan Kesihatan. RM30,000.00 Penjara:6 Bulan
Kenji Ling Property Sdn. Bhd. 0000-00-00 Construction Peraturan 5(1)(a)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya, Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Dengan Serta Merta Memberitahu Pejabat JKKP Perak Tentang Kemalangan Maut Ke Atas Daud Bin Mat Isa (No KP: 750221-10-5395) Di Cadangan Pembangunan Skim Perumahan 39 Unit Rumah Bandar (Townhouse) 3 Tingkat, D/A Lot 814, Mukim Sitiawan, Dareah Manjung, Perak. RM1,500.00
Advanced Medical Products Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 10, Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Kawalan Terhadap Bahaya Kemalangan Besar Dalam Perindustrian) Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Pada 19 Januari 2016 Jam 10.30 Pagi Sebagai Majikan Telah Gagal Untuk Menyediakan Dokumen Opreasi Selamat Bagi Mengenalpasti Kemungkinan Bahaya Kemalangan Besar Dan Mengambil Langkah Mencukupi Untuk Mencegah Apa-Apa Kemalangan Besar Atau Mengurangkan Akibat Kepada Orang Dan Alam Sekitar Dan Memberikan Maklumat, Latihan Dan Peralatan Yang Diperlukan Kepada Orang Yang Bekerja untuk Memastikan Keselamatan Mereka. RM2,000.00
Journey Gift Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1), Peraturan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000 . Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Gagal Untuk Mengenalpasti Dan Merekodkan Dalam Suatu Daftar Semua Bahan Kimia Berbahaya Kepada Kesihatan Yang Digunakan Di Tempat Kerja. RM2,000.00
Hiform (M) Sdn Bhd 0000-00-00 Construction Seksyen 17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memastikan setakat praktik keselamatan orang lain selain pekerjanya dengan tiada menyediakan penyeliaan bagi aktiviti memasang dan merombak perancah sehingga menyebabkan pekerja jatuh dan maut. RM40,000.00
Mh Glass & Aluminium Works 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memastikan pematuhan prosedur kerja selamat berkaitan aktiviti kerja mengangkat dan menurunkan aluminium `clading panel` secara `manual handling` sehingga menyebabkan kemalangan maut ke atas seorang pekerja akibat dihempap oleh aluminium clading. RM40,000.00
Transgreen Structure Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menyediakan sistem kerja selamat untuk penggunaan mobele elevating work platform sehingga menyebabkan seorang pekerja maut dan seorang pekerja cedera kerana tersepit diantara bucket dengan beam. RM40,000.00
Thrive Build Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan pengadang pada temporary platform untuk aktiviti kerja pemasanagan SCP sehingga menyebabkan kemalangan maut pada seorang pekerja. RM40,000.00
Hyundai Formworks Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memastikan kawasan kerja adalah selamat untuk aktiviti kerja pemasangan self climbing platform sehingga menyebabkan seorang pekerja maut. RM40,000.00
Proven Construction Development Sdn Bhd Pembangunan Perumaha 0000-00-00 Construction Peraturan 5 (1)(a)(aa).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak lapor kemalangan. RM5,000.00
Recron (M) Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memastikan setakat yang praktik keselamatan, kesihatan dan kebajikan semasa pekerja. RM15,000.00 Penjara :N/A
May Fair Builders 0000-00-00 Construction Seksyen 35(1), Akta Kilang dan Jentera 1967. Tapak bina tidak berdaftar. RM3,500.00
Quantum Structural Membranes Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(2) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal dalam masa 7 hari menghantar satu laporan tentang satu kemalangan berkaitan dengan kerja . RM1,000.00
SABAH FOREST INDUSTRIES SDN BHD 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Seksyen 15(1) Akkp Gagal Memberi Sebarang Maklumat, Arahan & Latihan Sebagaimana Yang Perlu Untuk Memastikan Setakat Yang Praktik Keselamatan Pekerjanya Yang Sedang Bekerja. RM50,000.00
Shahab Builders Eng. Sdn. Bhd. 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan penyeliaan terhadap alat pelindung diri kepada pekerja iaitu tali sawat atau tali keledar. RM8,000.00
Rentas Seni Sdn. Bhd. 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan penyeliaan terhadap alat pelindung diri kepada pekerja iaitu tali sawat atau tali keledar. RM8,000.00
Uzaimin Enterprise 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Kegagalan membuat perkiraan serta pengadaan maklumat, arahan, latihan dan penyeliaan sebagaimana yang perlu untuk memastikan setakat yang praktik, keselamatan dan kesihatan pekerjanya yang sedang bekerja. RM15,000.00
Aima Construction Sdn Bhd 0000-00-00 Construction Seksyen 49(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. TIDAK MEMATUHI NOTIS LARANGAN (001384) YANG DIKELUARKAN PADA 19/02/2016 - SEK.15 & SEK. 17 AKKP 1994. RM10,000.00
Aima Construction Sdn Bhd 0000-00-00 Construction Seksyen 49(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. TIDAK MEMATUHI NOTIS LARANGAN (001846)YANG DIKELUARKAN PADA 19/02/2016 - SEK.15 & SEK. 17 AKKP 1994. RM10,000.00
Lian Wan Timber 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Memagar Jentera. RM5,000.00
Lian Wan Timber 0000-00-00 Manufacturing Peraturan 5(1), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Pekerjaan. RM1,500.00
Takdir Permai Sdn. Bhd. 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan penyeliaan terhadap alat pelindung diri kepada pekerja iaitu tali sawat atau tali keledar. RM20,000.00
Mitre Industrial Sdn. Bhd. 0000-00-00 Manufacturing Peratyran 9(1), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan ) 2000Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menjalankan penaksiran risiko bahan kimia kepada kesihatan. RM6,000.00
Darul Jati Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 16, Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menyediakan dasar keselamatan di tempat kerja. RM10,000.00
Pembinaan Duta Idaman Sdn. Bhd. 0000-00-00 Construction Seksyen 29 (2), Akta Keselamatan Dan Kesihatan Pekerjaan 1994. Tiada Pegawai Keselamatan Dan Kesihatan Pekerjaan. RM800.00
Pembinaan Cangkat Hartamas 0000-00-00 Construction Seksyen 30(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak menubuhkan Jawatan Kuasa Keselamatan dan Kesihatan Pekerjaan. RM2,700.00
The Store (M) Sdn Bhd 0000-00-00 Business Trade Seksyen 30, Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menubuhkan Jawatankuasa Keselamatan dan Kesihatan. RM2,500.00
Maju Jaya Pasaran Sdn Bhd 0000-00-00 Construction Seksyen (1), . Gagal melantik SHO bagi projek pembinaan RM88juta. RM5,000.00
Konsortium Waza Sdn. Bhd. 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan penyeliaan terhadap alat pelindung diri kepada pekerja iaitu tali sawat atau tali keledar. RM30,000.00
Konsortium Waza Sdn. Bhd. 0000-00-00 Construction Seksyen 29(2), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengambil kerja seorang yang kompeten untuk bertindak sebagai Pegawai Keselamatan dan Kesihatan. RM5,000.00
Twinity Enterprise Sdn Bhd 0000-00-00 Construction Seksyen 35(1), Akta Kilang dan Jentera 1967. GAGAL MENDAFTAR TAPAK BINA. RM20,000.00
Loo Nyuk Shing Plumbing Works Sdn. Bhd. 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Sebagai Majikan, Gagal Untuk Memastikan Setakat Yang Praktik, Keselamatan, Kesihatan Dan Kebajikan Semasa Bekerja Semua Pekerjanya . RM40,000.00
President Hotel Sdn Bhd 0000-00-00 Hotel Peraturan 7(1) (b) i, Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Kawalan Terhadap Bahaya Kemalangan Besar Dalam Perindustrian) 1996. Akta Keselamatan dan Kesihatan Pekerjaan 1994. tidak mengemukakan Borang Pemberitahuan Aktiviti Industri seperti yang dinyatakan dalam Jadual 5 , Peraturan CIMAH. RM2,000.00
MNI Sdn BHd 0000-00-00 Manufacturing Peraturan 7(1), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994. gagal melaporkan kemalangan dengan borang ditetapkan dalam tempoh 7 hari. RM5,000.00
Sentienx Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 29(2), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengambil kerja seorang yang kompeten untuk bertindak sebagai Pegawai Keselamatan dan Kesihatan. RM1,000.00
GB Chemical Sdn Bhd 0000-00-00 Manufacturing Peraturan 5(1), Class Regulation 2013. Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menyediakan rekod pengelasan bahan kimia. RM5,000.00
Euro Chemio-Pharma Sdn Bhd 0000-00-00 Manufacturing Peraturan 14(2), Class Regulation 2013. Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak mengemukakan inventori bahan kimia berbahaya kepada Ketua Pengarah. RM5,000.00
PAMONA LOGISTICS SDN BHD 0000-00-00 Construction Seksyen 17(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Dalam Pengadaan Maklumat Berkaitan Sop Bagi Kerja-Kerja Mengangkat Mengunakan Jentera Jengkaut. RM15,000.00
Shahzanco Sdn. Bhd. 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Kegagalan membuat perkiraan serta pengadaan maklumat, arahan, latihan dan penyeliaan sebagaimana yang perlu untuk memastikan setakat yang praktik, keselamatan dan kesihatan pekerjanya yang sedang bekerja. RM25,000.00
Cosmo Property Management Sdn Bhd 0000-00-00 Construction Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004 5(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan Pekerjaan. RM2,000.00
Cahaya Klang Construction Sdn Bhd 0000-00-00 Construction Seksyen 49(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mematuhi Notis Larangan (2A 009388) yang dikeluarkan. RM5,000.00
Cosmo Property Management Sdn Bhd 0000-00-00 Construction Seksyen 51(2), Akta Kilang dan Jentera 1967. Gagal Menyenggara Loji & Mengadakan Sistem Kerja Selamat. RM5,000.00
Ex Foam Insulation Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menyediakan Prosedur kerja Selamat. RM5,000.00
Jyoto Works (M) Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 29(2), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengambil kerja seorang yang kompeten untuk bertindak sebagai Pegawai Keselamatan dan Kesihatan. RM2,000.00
Tsukishima Engineering Malaysia Sdn. Bhd. 0000-00-00 Construction Seksyen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Sebagai majikan di luar bilik kawalan setingkat (Blok G), Projek Cadangan Membina 1 Unit Pelantar Besi 4 Tingkat (Blok A), 1 Unit Pelantar Besi 3 Tingkat (Blok B), 1 Unit Pelantar Besi 6 Tingkat (Blok C), 1 Unit Pelantar Besi 6 Tingkat (Blok D), 1 Unit Pejabat Setingkat (Blok E), 1 Unit Kantin Setingkat(Blok F), 1 Unit Bilik Control Setingkat (Blok G), 1 Unit Gudang Setingkat (Blok H), 1 Unit Maintenance & Stor Spare Part Setingkat (Blok I), 1 Unit Bilik Rehat Setingkat (Blok J), 1 Unit Pencawang Elektrik (Blok K), 1 Unit Bilik Pendandang (Blok L), Ruang Alat Ubah, Ruang Loji Pembersihan Tangki, Bilik Pam, Tangki Air Bomba, Loji Pembersihan Industri Dan Ruang Simpanan Tong Di Atas Lot 9955, Kawasan Perindustrian Teluk Kalong, Mukim Telok Kalong, 24000 Daerah Kemaman, Terengganu telah gagal untuk memastikan kewajipannya, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja bagi pekerjanya iaitu Evin Slamet Agus (Nombor Pasport: AT 517585) dan Basir bin Dari (Nombor Kad Pengenalan: 701005-12-5075) dengan gagal mengadakan sistem kerja selamat bagi kerja-kerja memasang zink bumbung di luar bilik kawalan tersebut sehingga menyebabkan kemalangan ke atas kedua-duanya. RM15,000.00
Progamatic Design Sdn. Bhd. 0000-00-00 Construction Seksyen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Sebagai kontraktor di luar bilik kawalan setingkat (Blok G), Projek Cadangan Membina 1 Unit Pelantar Besi 4 Tingkat (Blok A), 1 Unit Pelantar Besi 3 Tingkat (Blok B), 1 Unit Pelantar Besi 6 Tingkat (Blok C), 1 Unit Pelantar Besi 6 Tingkat (Blok D), 1 Unit Pejabat Setingkat (Blok E), 1 Unit Kantin Setingkat(Blok F), 1 Unit Bilik Control Setingkat (Blok G), 1 Unit Gudang Setingkat (Blok H), 1 Unit Maintenance & Stor Spare Part Setingkat (Blok I), 1 Unit Bilik Rehat Setingkat (Blok J), 1 Unit Pencawang Elektrik (Blok K), 1 Unit Bilik Pendandang (Blok L), Ruang Alat Ubah, Ruang Loji Pembersihan Tangki, Bilik Pam, Tangki Air Bomba, Loji Pembersihan Industri Dan Ruang Simpanan Tong Di Atas Lot 9955, Kawasan Perindustrian Teluk Kalong, Mukim Telok Kalong, 24000 Daerah Kemaman, Terengganu telah gagal untuk memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya dengan gagal mengadakan ?Job Method Statement? bagi kerja-kerja memasang zink bumbung di luar bilik kawalan tersebut yang menyebabkan kemalangan ke atas Evin Slamet Agus (Nombor Pasport: AT 517585). RM15,000.00
Hj Said Binaan Sdn. Bhd. 0000-00-00 Construction Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004 5(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Memberitahu Dan Melaporkan Kemalangan Hilang Upaya Kekal (Tulang Tangan Kanan Patah) Pada 11/3/2016. RM4,000.00
Kreatif Semangat Sdn Bhd 0000-00-00 Construction Peraturan 24, Peraturan-Peraturan Kilang dan Jentera (Kendalian Bangunan dan Kerja-Kerja Binaan Kejuruteraan) (Keselamatan) 1986. Akta Kilang dan Jentera 1967. Sebagai kontraktor utama di Cadangan Mendirikan dan Menyiapkan 2 Unit Kilang Setingkat (Lapis) dan 2 Unit Ruang Pejabat Tiga Tingkat (Industri Kecil dan Sederhana) di Atas Lot PT 38183 (HSM 26758), Mukim Kuala Nerus, Daerah Kuala Terengganu, Terengganu Darul Iman telah gagal memastikan semua orang yang menjalankan apa-apa jenis kerja atau perkhidmatan di dalam kawasan kerja memakai topi keledar. RM1,000.00
Johtaw Development Sdn Bhd 0000-00-00 Construction Peraturan 74 (1), Peraturan-Peraturan Kilang dan Jentera (Kendalian Bangunan dan Kerja-Kerja Binaan Kejuruteraan) (Keselamatan) 1986. Akta Kilang dan Jentera 1967. Sebagai kontraktor utama tapak bina di Cadangan membina pembangunan Pusat Sajian Makanan Komersil (The Mayang Place) di Lot 1544 (GM 2004) Mukim Batu Buruk, Daerah Kuala Terengganu, Terengganu telah gagal memastikan perancah dibina atau sebahagian besarnya diubah atau ditinggalkan dilakukan di bawah penyeliaan terus oleh orang yang ditetapkan. RM1,000.00
Mentari Desa Sdn Bhd 0000-00-00 Construction Peraturan 25 (1), Peraturan-Peraturan Kilang dan Jentera (Kendalian Bangunan dan Kerja-Kerja Binaan Kejuruteraan) (Keselamatan) 1986. Akta Kilang dan Jentera 1967. Sebagai kontraktor di Cadangan Membina dan menyiapkan 9 unit rumah kedai 3 tingkat serta kerja-kerja berkaitan di atas Lot PT 32425 hingga PT 37433 Pekan Tepoh, Mukim Kuala Nerus telah gagal melantik seorang penyelia keselamatan tapak bina separuh masanya yang menghabiskan masanya sekurang-kurangnya lima belas jam seminggu khusus mengenai pengawasan keselamatan dan menggalakkan tatakerja yang selamat amnya di tapak bina. RM1,000.00
Leisure Genius Sdn Bhd 0000-00-00 Construction Peraturan 25 (1), Peraturan-Peraturan Kilang dan Jentera (Kendalian Bangunan dan Kerja-Kerja Binaan Kejuruteraan) (Keselamatan) 1986. Akta Kilang dan Jentera 1967. Sebagai kontraktor di Cadangan Pembangunan di atas Pecahan Lot 12397, Mukim Kuala Nerus, Daearah Kuala Terengganu yang Mengandungi: 14 unit kedai 3 lapis (type A); Lot PT 33835 - Lot PT 33848, 12 unit rumah teres 3 lapis (type B); Lot PT 33823 - Lot PT 33834, 187 unit rumah teres 2 lapis (type C); Lot PT 33786 - Lot PT 33822, Lot PT 33849 -Lot PT 33979 & Lot PT 33983 -Lot PT 34001, 68 unit rumah bandar (type E); Lot PT 33980 - Lot PT 33982 telah gagal melantik seorang penyelia keselamatan tapak bina separuh masanya yang menghabiskan masanya sekurang-kurangnya lima belas jam seminggu khusus mengenai pengawasan keselamatan dan menggalakkan tatakerja yang selamat amnya di tapak bina. RM1,000.00
CFM Technologies Sdn Bhd 0000-00-00 Manufacturing Peraturan 9 (1), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan ) 2000Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menjalankan penaksiran risiko bahan kimia berbahaya terhadap kesihatan. RM2,000.00
CFM Technologies Sdn Bhd 0000-00-00 Manufacturing Seksyen 49 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mematuhi notis pembaikan yang dikeluarkan sehingga tamat tarikh luput notis. RM5,000.00
Ting Sheng Enterprise Sdn. Bhd. (566349-P) 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal Melaporkan Kemalangan kepada Jabatan Keselamatan dan Kesihatan Pekerjaan. RM3,000.00
HIGH LINE ENGINEERING SDN BHD 0000-00-00 Business Trade Peraturan 5(1), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal dalam 7 hari menghantar laporan tentang kemalangan itu daripada atau berkaitan dengan kerja yang menyebabkan Johari Bin Sumarno (No. kad Pengenalan: 860724525911) maut di Hospital Umum Sarawak pada 24/9/2016 dan kemalangan dipercayai berlaku pada 21 September 2016. RM10,000.00
Charoen Pokphand Jaya Farm (M) Sdn Bhd 0000-00-00 Agriculture Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. gagal mengadakan prosedur kerja selamat berkaitan aktiviti kerja membetulkan saluran makanan ayam yang tersumbat di mesin auger sehingga menyebabkan kemalangan HUK. RM5,000.00
Wilmar Edible Oils Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada prosedur kerja selamat untuk kerja pengubahan paip udara. RM10,000.00
Linaco Manufacturing (M) Sdn Bhd 0000-00-00 Manufacturing Seksyen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan loji pengupas sabut kelapa yang selamat. RM6,000.00
Panglima Power Sdn Bhd 0000-00-00 Facility-Electric Seksyen 17(1)(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal memastikan setakat yang praktik keselamatan dan kebajikan selain pekerja. RM15,000.00
Rubberex (M) Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 151), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 4 Disember 2016 lebih kurang jam 10.50 malam telah gagal memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerja di bawah kawalan kamu temasuklah Dwarika Chaudary (No. Passport : 07885900) terutamanya dengan tidak mengadakan prosedur kerja selamat bagi kerja pembersihan dust collector no. 3 sehingga menyebabkan kecederaan badan serius iaitu putus jari telunjuk tangan kiri. RM9,000.00
MEC Engineering & Construction Sdn Bhd 0000-00-00 Construction Seksyen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan tempat kerja selamat bagi kerja-kerja penukaran atap bumbung. RM17,000.00
NL Metal Sdn Bhd 0000-00-00 Manufacturing Peraturan 10 (b), Peraturan-peraturan Kilang dan Jentera (Kaedah-kaedah kilang dan Jentera(Mengkompaun Kesalahan)(Pembatalan)) 2010 Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menjalankan kajian semula penaksiran risiko bahan kimia berbahaya pada kesihatan selepas lebih dari 5 tahun. RM7,000.00
NL Metal Sdn Bhd 0000-00-00 Manufacturing Peraturan 7 (1), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal melaporkan penyakit pekerjaan hearing impairment seramai 17 orang pekerja. RM9,000.00
Selaco Aluminium Berhad 0000-00-00 Manufacturing Seksyen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan penyeliaan bagi kerja-kerja penukaran atap bumbung. RM17,000.00
Maju Intan Biomass Energy Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 5 Januari 2017 lebih kurang jam 11.20 pagi sebagai majikan telah gagal memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerja kamu terutamanya pekerja Nazeri bin Zakaria (Nombor Kad Pengenalan: 660609-09-5163) dengan tidak menyediakan prosedur kerja selamat bagi kerja penyelenggaraan Heat Exchanger terutamanya kepada pekerja sehingga menyebabkan kemalangan kecederaan badan yang serius iaitu patah kaki kiri. RM5,000.00
Fruit Express Sdn Bhd 0000-00-00 Manufacturing Seksyen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan sistem kerja selamat bagi kerja-kerja menolak gerabak berisi buah tandan segas ke dalam sterilizer. RM20,000.00
Fruit Express Sdn Bhd 0000-00-00 Manufacturing Seksyen 21 Akta Kilang dan Jentera 1967. Gagal menyenggara keselamatan landasan gerabak buah tandan segar ke sterilizer. RM15,000.00
Syarikat Ladang LKPP Sdn Bhd 0000-00-00 Agriculture Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan latihan dan penyeliaan berkaitan pengendalian traktor sehingga menyebabkan kematian kepada pekerja tersebut. RM20,000.00
Gaya Analisa Sdn. Bhd. 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menyediakan prosedur kerja selamat yang lengkap bagi aktiviti kerja korekkan terbuka pembinaan terowong menggunakan excavator sehingga menyebabkan seorang maut dihimpit oleh counterweight excavator. RM40,000.00
Ekovest Construction Sdn Bhd 0000-00-00 Construction Seksyen 49(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mematuhi notis larangan yang dikeluarkan bagi melarang aktiviti kerja memasang steel bar untuk pembinaan tiang. RM30,000.00
Sri Binaraya Sdn Bhd 0000-00-00 Construction Seksyen 49(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mematuhi notis larangan penggunaan kren menara. RM30,000.00
MD Lutfar Construction Sdn Bhd 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan prosedur kerja selamat yang lengkap berkaitan aktiviti kerja pemasangan parapet panel sehingga menyebabkan kemalangan maut ke atas seorang pekerja. RM40,000.00
Samsung C&T (KL) Sdn Bhd 0000-00-00 Construction Seksyen 49(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mematuhi notis larangan bagi aktiviti kerja memasang steel rebar untuk pile cap di kawasan bawah B3/B4. RM30,000.00
3R Systems Sdn Bhd 0000-00-00 Construction Seksyen 15(1), Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menyelia setakat praktik Keselamatan, Kesihatan. RM25,000.00
RD Paper Sdn Bhd 0000-00-00 Manufacturing Seksyen 34 (2)(a) Akta Kilang dan Jentera 1967. Sebagai majikan di premis RD Paper Sdn Bhd, beralamat di PT 2100 Kampung Lak-Lok, 22000 Jerteh telah gagal mula menggunakan mana-mana premis sebagai kilang sehingga satu bulan selepas dia telah menyerahkan kepada inspektor satu notis bertulis dalam bentuk yang ditetapkan. RM2,500.00
Lijada Trading (Caltex) 0000-00-00 Business Trade . Sebagai majikan di Batu 13, Jalan Kelantan, Kg Bukit Jong, Kuala Nerus, 21060 Kuala Terengganu didapati bersalah kerana tidak mempunyai sijil perakuan kelayakan yang sah bagi satu unit bejana tekanan tak berapi bernombor siri 07145405 seperti mana ditetapkan pemunya tiap-tiap dandang stim, bejana tekanan tak berapi atau mesin angkat lain daripada mesin angkat guna tangan hendaklah memegang satu perakuan kelayakan yang sah berkenaan dengannya selagi jentera itu digunakan. RM500.00
Frontier Structure Sdn Bhd 0000-00-00 Construction Seksyen (10)e Akta Kilang dan Jentera 1967. Tiada penghadang bekerja di tempat tinggi. RM20,000.00
Pembinaan Yuen Seng Sdn Bhd 0000-00-00 Construction Peraturan 5 (1)(a).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal serta merta memberitahu pejabat JKKP yang terdekat dengan cara yang paling cepat yang ada kejadian berbahaya iaitu kejadian runtuhan struktur re-bar cage. RM6,500.00
Syarikat Pembenaan Yeoh Tiong Lay Sdn Bhd 0000-00-00 Construction Peraturan 5(1)(a)(aa).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal serta merta memberitahu pejabat JKKP yang terdekat dengan cara yang paling cepat yang ada kemalangan maut yang berlaku. RM9,000.00
Eco Medi Glove Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 11 November 2016 lebih kurang jam 9.30 pagi sebagai majikan telah gagal untuk memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerjanya termasuklah Nimaalan A/L Suhumaran (No. Kad Pengenalan : 930311-08-6349) terutamanya gagal meyediakan cara kerja yang selamat iaitu menggunakan sistem Lock Out Tag Out (LOTO) bagi kerja penyelenggaraan motor "washing brush" sehingga menyebabkan kecederaan serius kepada anggota badan mangsa iaitu jari manis tangan kanan mangsa telah putus seruas di bahagian hujung sementara jari kelingking luka. RM18,000.00
Meditech Gloves Sdn Bhd 0000-00-00 Manufacturing Seksyen 15.Akta Kilang dan Jentera 1967. Gagal memagar jentera berbahaya dengan kukuh. RM5,800.00
Ryco Hydraulic (M) Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(b).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal dengan serta merta menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM2,600.00
SMT Technologies Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(b)(aa).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal dengan serta merta menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM2,700.00
Dongwha (Malaysia) Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(b)(aa).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal dengan serta merta menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM2,000.00
Leader Cable Industry Berhad 0000-00-00 Manufacturing Peraturan 5(1)(b)(aa).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal dengan serta merta menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM2,300.00
MD KWANG TAI REALTY SDN BHD 0000-00-00 Construction Peraturan 5 (1)(a)(aa), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004. Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memberitahu pejabat Jabatan Keselamatan Dan Kesihatan Pekerjaan, yang terdekat dengan cara yang paling cepat yang ada dan dalam masa 7 hari menghantar laporan tentang kemalangan itu dalam borang yang diluluskan daripada tarikh kejadian iaitu 22hb September 2016 sehingga 28hb September 2016 bagi kemalangan berbangkit daripada atau berkaitan dengan kerja yang menyebabkan kemalangan maut kepada Pang Guan Teck@Pang Guan Seng (No KPT : 550121-13-5099) di tapak projek tersbt. RM5,000.00
Tandop Jaya Engnineering Berhad 0000-00-00 Construction Peraturan 5(1)(b)(aa).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal dalam masa 7 hari menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM1,500.00
Tandop Jaya Engnineering Berhad 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Kegagalan mengadakan prosedur kerja selamat. RM20,000.00
Langkasuka Point Sdn. Bhd. 0000-00-00 Construction Peraturan 5(1)(b)(aa).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal dalam masa 7 hari menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM3,500.00
Langkasuka Point Sdn. Bhd. 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Kegagalan membuat perkiraan serta pengadaan maklumat, arahan, latihan dan penyeliaan. RM20,000.00
Bumi Jelapang Corporation Sdn. Bhd. 0000-00-00 Construction Peraturan 5(1)(b)(aa).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal dengan serta merta menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM5,000.00
Pronas Construction Sdn. Bhd. 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Kegagalan membuat perkiraan serta pengadaan maklumat, arahan, latihan dan penyeliaan. RM15,000.00
CHOP KEE HUI 0000-00-00 Facility Gas Seksyen 17 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal untuk menjalankan pengusahaan nya dengan cara memastikan, setakat yang praktik, bahawa orang-orang lain, yang bukan pekerjanya, yang mungkin tersentuh oleh pengusahaan itu tidak terdedah kepada keselamatan dan kesihatan mereka oleh sebab pengusahaan itu sehingga telah menyebabkan seorang pekerja Exceed Enterprise SB iaitu Ujan Ak Marais (NO KPT : 700505-13-5945) maut akibat dilanggar oleh forklift bernombor QAF 4972. RM25,000.00
Ying Zhi Agricultural 0000-00-00 Manufacturing Peraturan 5(2)(i).Akta Kilang dan Jentera 1967. Menggunakan dandang stim tanpa drebar dandang stim yang sah. RM10,000.00
DXN Industries (M) Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 10(b).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menjalankan penaksiran risiko bahan kimia kepada kesihatan. RM1,500.00
DXN Pharmaceutical Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 10(b).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menjalankan penaksiran risiko bahan kimia kepada kesihatan. RM1,500.00
Hai Point Steel Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 16.Akta Keselamatan dan Kesihatan Pekerjaan 1994. Kegagalan membentuk dasar keselamatan dan kesihatan. RM15,000.00
Sinliplas Holding Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(b)(aa).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal dengan serta merta menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM1,000.00
Grille Tech Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Kegagalan membuat perkiraan serta pengadaan maklumat, arahan, latihan dan penyeliaan. RM40,000.00
Takdir Permai (M) Sdn. Bhd. 0000-00-00 Construction Seksyen 49(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mematuhi notis larangan. RM10,000.00
Takdir Permai (M) Sdn. Bhd. 0000-00-00 Construction Seksyen 29(2).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal melantik SHO. RM800.00
Takdir Permai (M) Sdn. Bhd. 0000-00-00 Construction Peraturan 75(1)Akta Kilang dan Jentera 1967. Gagal mengikut kelulusan PE bagi pemasangan perancah. RM500.00
Lhoist SPN Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 17(1)(b), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan) 2000.Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 19 Januari 2017 lebih kurang jam 10.00 pagi sebagai majikan gagal untuk memeriksa dan menguji keberkesanan kelengkapan kawalan kejuruteraan yang disediakan iaitu 1 unit kebuk wasap di bahagian makmal oleh juruteknik higien yang berdaftar pada setiap tahun. RM3,000.00
Soon Soon Oilmills Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada menyediakan prosedur kerja selamat. RM7,000.00
Davex Sdn Bhd 0000-00-00 Manufacturing Seksyen 29(2).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak melantik seorang Pegawai Keselamatan dan Kesihatan yang kompeten. RM2,000.00
Kamen Steel Bhd 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tiada menyediakan prosedur kerja selamat. RM6,000.00
Kamel Steel Sdn Bhd 0000-00-00 Manufacturing Seksyen 29(2).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Tidak melantik seorang Pegawai Keselamatan dan Kesihatan yang kompeten. RM2,800.00
Sin Yong Guan Industries Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 10 Mac 2017 lebih kurang jam 5.30 petang sebagai majikan telah gagal memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerja kamu iaitu Dipendra Prasad Kalwar (No. pasaport: 08142842) terutamanya dengan gagal menyediakan loji yang selamat bagi jentera 'Crusher' CR 1 iaitu 'interlock device' sehingga menyebabkan kecederaan badan serius iaitu putus jari telunjuk, jari tengah dan jari manis tangan kanan. RM10,000.00
OHU Father and Sons Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 22 Jun 2016 lebih kurang jam 10.00 pagi sebagai majikan telah gagal memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerja di bawah kawalan kamu temasuklah Syed Muhammad Al Nafi Bin Syed Mahtar (No. K/P : 920613-08-6161) terutamanya dengan tidak menyediakan pengadang yang selamat bagi jentera stamping nombor 6 (63 tan) sehingga menyebabkan kecederaan badan serius. RM12,000.00
Foong Lee Sawi Minyak Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 14 Mac 2017 gagal dalam masa tujuh hari menghantar laporan dalam borang yang diluluskan kepada Jabatan Keselamatan dan Kesihatan Pekerjaan Perak berkenaan kemalangan seorang pekerja kamu iaitu Kanagasundram a/l Nagamuthu (no. kad pengenalan: 731017-08-5493) pada 06/03/2017 lebih kurang jam 3.00 petang di mana ibu jari kaki kanan mangsa tercedera semasa menjalankan kerja-kerja menyusun buah sawit di dalam lori. RM1,000.00
Ornapaper Industry (Perak) Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 28/11/2016 telah gagal untuk menghantar dalam masa tujuh hari laporan dalam borang yang diluluskan berkenaan kemalangan seorang pekerja kamu iaitu Nagami a/p Sunjevee (no. kad pengenalan: 620824-06-5198) pada 19/11/2016 lebih kurang 6.50 petang kepada Jabatan Keselamatan dan Kesihatan Pekerjaan Perak. RM2,000.00
Ornapaper Industry (Perak) Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 23/02/2017 telah gagal untuk menghantar dalam masa tujuh hari laporan dalam borang yang diluluskan berkenaan kemalangan seorang pekerja kamu iaitu Mior Joelaily Bin Halif (no. kad pengenalan: 710918-10-5575) pada 15/02/2017 lebih kurang 9.45 pagi kepada Jabatan Keselamatan dan Kesihatan Pekerjaan Perak. RM2,000.00
Pagoda Foods (M) Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 1 Mac 2017 gagal dalam masa tujuh hari menghantar laporan dalam borang yang diluluskan kepada Jabatan Keselamatan dan Kesihatan Pekerjaan Perak berkenaan kemalangan seorang pekerja kamu iaitu Nantha a/l Ramah (no. kad pengenalan: 981209-08-7567) pada 21/02/2017 lebih kurang jam 10.00 pagi di mana tangan kanan mangsa telah retak selepas terjatuh dari kerusi ketika mencuci mesin dryer. RM2,500.00
Public Industries Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(2), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 28 Mac 2017 gagal dalam masa tujuh hari menghantar laporan dalam borang yang diluluskan kepada Jabatan Keselamatan dan Kesihatan Pekerjaan Perak berkenaan kemalangan seorang pekerja kamu iaitu Ramli Bin Ab. Hamid (no. kad pengenalan: 611205-04-5193) pada 20/02/2017 lebih kurang jam 3.30 petang di mana ibu jari tangan kanan mangsa tercedera semasa mengendalikan mesin pencetak ketas jenis Heidelberg. RM3,000.00
Longxin Construction Sdn Bhd 0000-00-00 Construction Seksyen 17(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal memastikan setakat yang praktik keselamatan dan kebajikan semasa bekerja. RM15,000
F & D Electrical & Engineering Sdn Bhd 0000-00-00 Construction Seksyen 17(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Sebagai majikan gagal untuk menjalankan pengusahaan dengan cara memastikan, setakat yang praktik, orang-orang lain, dengan mendedahkan mangsa kepada risiko keselamatan dan kesihatan berkaitan kerja merombak cerobong udara. RM8,000
Ah Woh Air Condition Engineering Sdn Bhd 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Sebagai majikan gagal untuk menjalankan pengusahaan dengan cara memastikan, setakat yang praktik, orang-orang lain, dengan mendedahkan mangsa kepada risiko keselamatan dan kesihatan berkaitan kerja merombak cerobong udara. RM6,000
Pelangi Saga Sdn. Bhd. 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Kegagalan mengadakan prosedur kerja selamat. RM40,000.00
Pelangi Saga Sdn Bhd 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Kegagalan mengadakan prosedur kerja selamat. RM40,000.00
Unilin (M) Sdn. Bhd. 0000-00-00 Manufacturing . Kegagalan mengadakan prosedur kerja selamat. RM10,000.00
Unilin (M) Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Kegagalan mengadakan prosedur kerja selamat. RM10,000.00
GOODHELP ENTERPRISE SDN BHD 0000-00-00 Construction Seksyen 10 ( C ).Akta Kilang dan Jentera 1967. GAGAL MEMASTIKAN TIADA RISIKO ORANG TERJATUH. RM10,000.00
Uda Dayaurus Sdn. Bhd. 0000-00-00 Business Trade Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 16 April 2017 lebih kurang jam 9.30 malam sebagai majikan telah gagal memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerja kamu dengan gagal menjalankan penaksiran risiko sehingga menyebabkan Mohamad Nur Shafiq bin Mohamad Naser (no. kad pengenalan: 900216-08-5407) dan Mohamad Ilaala Bin Che Aziz (no. kad pengenalan: 900804-03-6061) kelemasan terhidu gas toksik sehingga menyebabkan maut. RM40,000.00
Green Prospect Sdn. Bhd. (GP Lumut) 0000-00-00 Manufacturing Seksyen 15(1)Akta Keselamatan dan Kesihatan Pekerjaan 1994. Pada 27 Mac 2017 lebih kurang jam 11.00 pagi sebagai majikan telah gagal memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerja kamu iaitu Bisna Neupane (No. pasaport: 07346197) terutamanya dengan gagal mengadakan prosedur kerja selamat bagi aktiviti 'greasing' pada 'bearing blower fan' di 'Line 5, Oven 9, Side B' sehingga menyebabkan kecederaan badan serius iaitu putus 2 ruas jari tengah tangan kiri. RM12,000.00
Sooi Ho Chan Sdn Bhd 0000-00-00 Manufacturing Seksyen 17(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Pada 3 November 2016 lebih kurang jam 2.00 petang,sebagai pemunya telah gagal untuk memastikan, setakat yang praktik, bahawa dia dan orang-orang lain, yang bukan pekerjanya, yang mungkin tersentuh oleh pengusahaan itu tidak terdedah kepada risiko kepada keselamatan atau kesihatan mereka oleh sebab pengusahaan itu yang menjalankan perusahaan menjual ais batu termasuklah Mohammad Aqil Irfan Bin Mohammad Azhar (Nombor kad pengenalan: 090125-08-0609) terutamanyagagal memastikan loji iaitu mesin penghancur ais berada dalam keadaan selamat sehingga menyebabkan kecederaan badan yang serius pada tangan kiri. RM10,000.00
Temerloh Oil Mill Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 27(3) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan ) 2000.Akta Keselamatan dan Kesihatan Pekerjaan 1994, Pada 22 Februari 2017 lebih kurang jam 10.00 pagi sebagai majikan gagal untuk menjalankan pengawasan perubatan setiap tahun oleh seorang doktor kesihatan pekerjaan kepada pekerjanya terutama kepada Mustafa Kamar Bin Ahmad (No. I/C: 621020-08-5729) yang terdedah dengan bahan kimia berbahaya kepada kesihatan iaitu n-hexane. RM1,000.00
OMH Electrical Works 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994. gagal mengadakan penyeliaan dan latihan sebagaimana perlu, untuk kerja-kerja pemasangan transfomer sehingga menyebabkan kematian. RM16,000.00
SECG Bina Sdn Bhd 0000-00-00 Construction Seksyen 19(1).Akta Kilang dan Jentera 1967, Mengendalikan passenger hoist (no. Siri: 94013) no. Pendaftaran jkkp: pma 41114 tanpa perakuan kelayakan yang sah. RM18,000
Babyana Kontraktor 0000-00-00 Construction Seksyen 49(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mematuhi notis larangan 2a:123602. RM5,000.00
Syarikat Juta Motor Assessori Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Pada 21 Mac 2017 lebih kurang jam 4.00 petang sebagai majikan telah gagal memastikan, setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja semua pekerja kamu termasuklah Ridzwan Bin Bokhari (No. kad pengenalan: 660303-08-5819) terutamanya dengan tiada prosedur kerja selamat bagi pemeriksaan mata pisau mesin 'cutting' (siri nombor: 1648) sehingga menyebabkan kecederaan badan serius iaitu putus sebahagian jari telunjuk tangan kanannya. RM10,000.00
Kelisa Murni Sdn Bhd 0000-00-00 Construction Seksyen 17(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mengadakan kawalan laluan masuk dan keluar. RM3,000.00
Aturan Majujaya Sdn Bhd 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mengadakan tempat kerja yang selamat untuk kerja-kerja pembinaan bangunan RM15,000.00
Pustaka Efektif Sdn Bhd 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mengadakan cara kerja selamat untuk kerja memindahkan pallet simen RM15,000.00
Yu-Li Building Contractor 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal megadakan tempat kerja selamat bagi kerja-kerja membuka kotak acuan. RM15,000.00
BGMC Corporation Sdn Bhd 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mengadakan penyeliaan bagi kerja-kerja membuka kotak acuan. RM15,000.00
Minsec Engineering Services Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mengadakan penyeliaan untuk kerja perobohan struktur gudang. RM15,000.00
Chuan Ho Engineering & Trading Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mengadakan cara kerja selamat untuk kerja perobohan struktur gudang. RM15,000.00
Kia Industry Engineering Sdn Bhd 0000-00-00 Manufacturing Peraturan 10(1) Peraturan-Peraturan (Pemberitahuan Kelayakan dan Pemeriksaan) Kilang dan Jentera 1970.Akta Kilang dan Jentera 1967, Sebagai majikan di K 626 L, Kawasan Perindustrian Jakar II, Kemaman didapati bersalah kerana tidak mempunyai sijil perakuan kelayakan yang sah bagi jentera air compressor bernombor siri MP 7318 seperti mana ditetapkan pemunya tiap-tiap dandang stim, bejana tekanan tak berapi atau mesin angkat lain daripada mesin angkat guna tangan hendaklah memegang satu perakuan kelayakan yang sah berkenaan dengannya selagi jentera itu digunakan. RM500.00
Mammoth Empire Construction Sdn Bhd 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Majikan gagal mengadakan sistem kerja selamat bagi aktiviti mengangkat i-beam menggunakan kren bergerak. RM18,000.00
Generous Square Sdn Bhd 0000-00-00 Construction Seksyen 17(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal memastikan keselamatan pekerja berkaitan kerja-kerja pemasangan pembentungan sehingga berlaku kemalangan maut (subkontraktor metbuild) semasa kerja-kerja pemasangan i-beam u-turn ramp mangsa (indra kemas sdn bhd) tergelincir dan jatuh pada ketinggian 5 meter . RM8,000.00
Pembinaan Bintang Baru Sdn Bhd 0000-00-00 Construction Peraturan 5(1)(a)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994, Majikan gagal memastikan gagal serta merta memberitahu dan melaporkan ke jkkp kemalangan maut yang berlaku pada 2/1/2017 ke atas eko purnomo akibat ditimpa perancah yang runtuh semasa kerja-kerja melepa di dalam airwell no. 1, level 5, blok a1. RM4,000.00
Pembinaan Bintang Baru Sdn Bhd 0000-00-00 Construction Seksyen 17(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Sebagai majikan gagal memastikan bukan pekerja tidak terdedah kepada risiko keselamatan semasa kerja-kerja plastering. RM10,000.00
Soo Yuan Jian (Individu) 0000-00-00 Construction Peraturan 9 Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994, Sebagai pengarah spbb - gagal serta merta memberitahu dan melaporkan ke jkkp kemalangan maut yang berlaku pada 2/1/2017 (5 pekerja di atas perancah yang roboh - 4 cedera, 1 maut) ke atas eko purnomo akibat ditimpa perancah yang runtuh semasa kerja-kerja melepa di dalam airwell no. 1, level 5, blok a1 . RM3,000.00
Leong Ke Seng 0000-00-00 Construction Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Sebagai majikan gagal mematuhi sop di tapak bina sehingga menyebabkan kematian ditimpa perancah runtuh pekerja kamu semasa kerja-kerja plastering iaitu eko purnomo akibat ditimpa perancah yang runtuh semasa kerja-kerja melepa di dalam airwell no. 1, level 5, blok a1. RM15,000.00
Future Supply Chain Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mengadakan sop berkaitan kerja mengangkat kontena menggunakan jentera stacker sehingga berlaku kemalangan maut (subkontraktor). RM30,000.00
Lhoist SPN Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 21(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal menjalankan mesyuarat JKK dalam tempoh yang ditetapkan. RM2,000.00
Nuaim Golf Management Sdn Bhd 0000-00-00 Hotel Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Kegagalan membuat perkiraan setakat yang praktik bagi mengadakan SOP. RM30,000.00
Hakken Technologies Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(b)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal dengan serta merta menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM9,000.00
Flextronics Technology (Penang) Sdn Bhd 0000-00-00 Manufacturing Seksyen 19(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Mengendalikan scissor lift tanpa sijil perakuan kelayakan yang sah. RM6,000.00
Babyana Kontraktor 0000-00-00 Construction Seksyen 49(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mematuhi notis larangan 2a:068092. RM10,500.00
Nagoya Plastic Industries Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal sediakan prosedur kerja selamat. RM6,000.00
Nagoya Plastic Industries Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(b)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal dengan serta merta menghantar laporan tentang kemalangan atau kejadian berbahaya itu. RM2,000.00
Perfect Readymix (Melaka) Sdn Bhd 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal memastikan setakat yang praktik keselamatan dan kebajikan semasa bekerja. RM40,000.00
Heavenly Land Sdn Bhd 0000-00-00 Construction Seksyen 29(2) Di baca bersama Perintah Keselamatan dan Kesihatan Pekerjaan (Pegawai Keselamatan dan Kesihatan) 1998 Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pegawai Keselamatan Dan Kesihatan) 1997.Akta Keselamatan dan Kesihatan Pekerjaan 1994, Tidak melantik seorang Pegawai Keselamatan dan Kesihatan yang kompeten. RM5,000.00
Heavenly Land Sdn Bhd 0000-00-00 Construction Peraturan 13(3) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Jawatankuasa Keselamatan Dan Kesihatan) 1996.Akta Keselamatan dan Kesihatan Pekerjaan 1994, Tidak memeriksa, menyiasat dan mengadakan mesyuarat JKK bagi kes maut di dalam tapak bina. RM5,000.00
Premium Flame Sdn Bhd 0000-00-00 Construction Seksyen 10(d).Akta Kilang dan Jentera 1967, Tiada akses selamat di dalam tapak bina. RM10,000.00
Mitsubishi Heavy Industries Ltd 0000-00-00 Construction Seksyen 17(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Seksyen 17 (1) gagal memastikan keselamatan bukan pekerja semasa bekerja. RM30,000.00
Perbadanan Pengurusan Queensbay Mall 0000-00-00 Harta Tanah Seksyen 49(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mematuhi arahan seperti di Notis Pembaikan bernombor siri 3A 086622. RM8,000.00
Allied Advantage Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal menyediakan prosedur kerja selamat bagi kerja-kerja pemindahan gegelung 'wire rod' di bahagian 'Reducing Section' sehingga menyebabkan kemalangan maut kepada Thakur Bishwanath. RM35,000.00
Yokohama Reclamation Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 27(2) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan ) 2000.Akta Keselamatan dan Kesihatan Pekerjaan 1994, Pada 2 Mei 2017 di premis beralamat Lot 49, Jalan Johan 2/5, Kawasan Perindustrian Pengkalan II, 31550 Pusing, Perak, sebagai majikan telah gagal menjalankan komponen pengawasan perubatan dengan doktor kesihatan pekerjaan ke atas pekerja bernama En. Mohd Affindy bin Mohd Jamil (k/p: 810518-08-6799) yang terdedah kepada risiko bahan kimia berbahaya kepada kesihatan iaitu lead yang tersenarai dalam Jadual II. RM3,000.00
Yokohama Reclamation Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 27(2) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Penggunaan Dan Standard Pendedahan Bahan Kimia Berbahaya Kepada Kesihatan ) 2000.Akta Keselamatan dan Kesihatan Pekerjaan 1994, Pada 2 Mei 2017 di premis beralamat Lot 49, Jalan Johan 2/5, Kawasan Perindustrian Pengkalan II, 31550 Pusing, Perak, sebagai majikan telah gagal menjalankan komponen pengawasan perubatan dengan doktor kesihatan pekerjaan ke atas pekerja bernama En. Syed Mohamd Fazil (k/p: 730725-08-6417) yang terdedah kepada risiko bahan kimia berbahaya kepada kesihatan iaitu lead yang tersenarai dalam Jadual II. RM3,000.00
Shen Yi Construction 0000-00-00 Construction Seksyen 17(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal pastikan tempat kerja selamat hingga sebabkan kemalangan maut kepada orang luar. RM6,000.00
VST Cemerlang Sdn Bhd 0000-00-00 Construction Peraturan 9.Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004, Mengalih jentera jenis jengkaut di tempat kejadian kemalangan. RM3,000.00
Hoe Hup Wood Processing Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15(1).Akta Keselamatan dan Kesihatan Pekerjaan 1994, Kegagalan membuat perkiraan setakat yang praktik bagi mengadakan latihan. RM13,000.00
Hoe Hup Wood Processing Sdn. Bhd. 0000-00-00 Manufacturing Peraturan 5(1)(b)(aa) Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004.Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal dengan serta merta menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM2,000
Hoe Hup Wood Processing Sdn. Bhd. 0000-00-00 Manufacturing Sekysen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994, Kegagalan membuat perkiraan setakat yang praktik bagi mengadakan latihan RM 13,000
Hoe Hup Wood Processing Sdn. Bhd. 0000-00-00 Manufacturing Per 5(1) (b) (aa)- Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004, Gagal dengan serta merta menghantar laporan tentang kemalangan atau kejadian berbahaya itu dalam borang yang diluluskan. RM 2,000.00
Masfloor Sdn Bhd 0000-00-00 Manufacturing Per 21(1) - Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Jawatankuasa Keselamatan Dan Kesihatan) 1996, Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memastikan bahawa Jawatankuasa Keselamatan dan Kesihatan bermesyuarat seberapa kerap yang perlu setara dengan risiko yang menyertai jenis kerja di tempat kerja tetapi hendaklah bermesyuarat tidak kurang daripada 3 bulan sekali. RM1,000.00
MASFLOOR SDN BHD 0000-00-00 Manufacturing Per. 21(1), Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Jawatankuasa Keselamatan Dan Kesihatan) 1996, Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal memastikan bahawa jawatankuasa keselamatan dan kesihatan bermesyuarat seberapa kerap yang perlu setara dengan risiko yang menyertai jenis kerja di tempat kerja tetapi hendaklah bermesyuarat tidak kurang daripada 3 bulan sekali. RM1,000.00
Hai Point Steel Sdn. Bhd. 0000-00-00 Manufacturing Sekysen 15 Akta Keselamatan dan Kesihatan Pekerjaan 1994. Majikan gagal menyediakan alat pelindung diri (PPE) kepada pekerja RM 4,500.00
Hai Point Steel Sdn. Bhd. 0000-00-00 Manufacturing Seksyen 15. Akta Keselamatan dan Kesihatan Pekerjaan 1994.Majikan gagal menyediakan PPE kepada pekerja. RM4,500.00
Econpile (M) Sdn Bhd 0000-00-00 Construction Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan prosidur kerja selamat bagi kerja menebuk sheetpile sehingga menyebabkan kemalagan maut kepada pekerjanya akibat tertimbus tanah yang runtuh. RM35,000.00
Econpile (M) Sdn Bhd 0000-00-00 Construction Gagal mengadakan sistem kerja selamat yang mencukupi berkaitan aktiviti kerja penukaran boring bucket sehingga menyebabkan kecederaan yang serius iaitu jari tangan tersepit mengakibatkan ibu jari dan jari telunjuk tangan kiri putus. RM10,000.00
Felda Palm Industries dn Bhd 0000-00-00 Agriculture Sekysen 15 (1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal mengadakan sistem kerja selamat. RM 15,000.00
Widad Builder Sdn Bhd 0000-00-00 Construction Sekysen 15 Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal menyediakan prosedur kerja selamat bagi kerja pemasangan frame fly jib kren bergerak. RM10,000.00
Schmidt & Clemens (Asia) Sdn Bhd 0000-00-00 Manufacturing Sekysen 29(2) Akta Keselamatan dan Kesihatan Pekerjaan 1994, tidak melantik pegawai keselamatan dan kesihatan. RM3,000.00
Ikhmas Jaya Sdn Bhd 0000-00-00 Construction Per 9 - Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004, Menggangu dan mengusik kawasan tempat kejadian tanpa kebenaran pihak jabatan RM 6,000.00
Aumkar Plantations Sdn. Bhd 0000-00-00 Manufacturing Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal untuk memastikan setakat yang praktik, keselamatan pekerjanya yangsedang bekerja dengan tidak mengadakan penyeliaan sebagaimana yang perlu.
Ladang Sabahmas Sdn. Bhd. 0000-00-00 Agriculture Seksyen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994. Gagal untuk memastikan setakat yang praktik, keselamatan, kesihatan dan kebajikan semasa bekerja pekerjanya dengan tidak membuat perkiraan bagi menjamin keselamatan dan ketiadaan risiko. RM20,000.00
Ivory View Sdn Bhd 0000-00-00 Construction Sekysen 15 Akta Keselamatan dan Kesihatan Pekerjaan 1994. RM15,000.00
Bina PYK sdn Bhd 0000-00-00 Construction Sekysen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mengadakan sistem kerja selamat yang mencukupi berkaitan aktiviti kerja hackin pile sehingga menyebabkan kemlangan ke atas mangsa RM 40,000.00
DB&B Design Sdn Bhd 0000-00-00 Construction Sekysen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal menyediakan prosidur kerja selamat bagi aktiviti mengangkat dan menurunkankan barang menggunakan kren sehingga mengakibatkan kemalangan kepada mangsa RM 35,000.00
KS Tersang 0000-00-00 Manufacturing Seksyen 17(1) , Akta Keselamatan dan Kesihatan Pekerjaan 1994. gagal menyelenggara jentera sehingga menyebabkan kemalangan maut ke atas mangsa. RM15,000.00
Endau Palm Oil Mill 0000-00-00 Manufacturing Sekysen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994, Gagal mengadakan maklumat,penyeliaan dan arahan kepada pekerja. RM10,000.00
Impian Gama 0000-00-00 Construction Sekysen 29(2) Akta Keselamatan dan Kesihatan Pekerjaan 1994 Perintah Keselamatan dan Kesihatan Pekerjaan (Pegawai Keselamatan dan Kesihatan)1997, gagal mengambil kerja seorang pegawai Keselamatan dan Kesihatan. RM 3,000.00
Impian Gama 0000-00-00 Construction Per 5(1) - Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004, Gagal melaporkan kemalangan dengan borang ditetapkan dalam tempoh 7 hari RM 5,000.00
Impian Gama 0000-00-00 Construction Sekysen 15(1) Akta Keselamatan dan Kesihatan Pekerjaan 1994,Gagal menyediakan platform kerja yang selamat RM 10,000.00
Belati Wangsa (M) Sdn. Bhd. 0000-00-00 Construction Per 5(1) (b) (aa)- Peraturan-Peraturan Keselamatan Dan Kesihatan Pekerjaan (Pemberitahuan Mengenai Kemalangan, Kejadian Berbahaya Keracunan Pekerjaan Dan Penyakit Pekerjaan) 2004,Gagal menghantar laporan tentang kemalangan atau kejadian berbahaya dalam borang yang diluluskan dalam masa tujuh (7) hari ke pejabat JKKP tentang kemalangan maut berkaitan dengan kerja terhadap Hazlan Bin Mat Isa (No. K/P: 781211-14-5299). RM 7,000.00