Main_banner02
Main_banner02
Main_banner02
Main_banner02
Main_banner02
Main_banner02
Main_banner02
Main_banner02
Main_banner02
main_banner02
main_banner03
main_banner08
main_banner10
Banner 8
MAKLUMAT_BAHARU_BERKENAAN_PEMASANG_PEMERIKSAN__PENYELIA_PERANCAH_TIUB_5.jpg
MAKLUMAT_BAHARU_BERKENAAN_PEMASANG_PEMERIKSAN__PENYELIA_PERANCAH_TIUB_5.jpg
images/Banner_Seranta_Awam.jpeg
images/Banner_Seranta_Awam.jpeg
Pelaporan Penyakit dan Keracunan Pekerjaan (JKKP7) - copy
Pelaporan Penyakit  dan Keracunan Pekerjaan (JKKP7) - copy
CIMSEN.png
CIMSEN.png
Guidelines On Medical Surveillance Programme at The Workplace 2023
Guidelines On Medical Surveillance Programme at The Workplace 2023
Maklumat Terkini Tindakan Pendakwaan dan Kompaun - copy
Maklumat Terkini Tindakan Pendakwaan dan Kompaun - copy
Borang Pemberitahuan Borang JKKP 5
Borang Pemberitahuan Borang JKKP 5
E- Banner Pelaporan
E- Banner Pelaporan
PERMOHONAN DAN PEMBAHARUAN KOMPETENSI MELALUI SALURAN YG BETUL
PERMOHONAN DAN PEMBAHARUAN KOMPETENSI MELALUI SALURAN YG BETUL
Guidance For Employer on the preparation of noise control - copy
Guidance For Employer on the preparation of noise control - copy
Garis Panduan Pengurusan Keselamatan Silinder Domestik Gas Petroleum Cecair (GPC) dan Pepasangan 2023 - copy
Garis Panduan Pengurusan Keselamatan Silinder Domestik Gas Petroleum Cecair (GPC) dan Pepasangan 2023 - copy
Laporan Pencapaian OSHMP2025
Laporan Pencapaian OSHMP2025
Construction Work
Construction Work
WORK AT HEIGHT
WORK AT HEIGHT
Hebahan Risalah TS3P1A4
Hebahan Risalah TS3P1A4
Infografik Teladan Kemalangan (ITK)
Infografik Teladan Kemalangan (ITK)
OSHMP 2021 - 2025
PELAN INDUK KESELAMATAN DAN KESIHATAN PEKERJAAN 2021 -2025 (OSHMP25)
"KKP Inklusif-Kebersamaan dan Komitmen"
Image is not available
OSHMP 2021 - 2025
previous arrow
next arrow
banner6
Banner03
Banner05
Permohonan bagi peperiksaan Jurutera Stim / Enjin Pembakaran Dalam - copy
9db9ffd235c59a7f51b37a47281ee7759272580a-5-tindakan-hadapi-covid.jpeg
2BANNERNOTISPEMBERITAHUANGPCEM2022.png
Pendakwaan Jan - Disember 2023
HEBAHAN TERKINI PENGGUNAAN BORANG PENDAFTARAN PENGENDALI PERANCAH
Jata
HEBAHAN: PENGGUNAAN BORANG PENDAFTARAN SEBAGAI PENGENDALI PERANCAH (DS-07-003) DAN BORANG PENDAFTARAN SEBAGAI OPERATOR KREN (DS-07-006) TERKINI

Untuk makluman, terdapat pindaan Borang Pendaftaran Sebagai Pengendali Perancah (DS-07-003) dan Borang Pendaftaran Sebagai Operator Kren (DS-07-006). Sehubungan dengan itu, pengguna perlu memastikan permohonan yang dikemukakan kepada Pejabat JKKP Negeri adalah menggunakan borang terkini mulai 1 Mei 2022. Dokumen ini telah dikemaskini dan boleh diperolehi melalui :-
a) Laman Web Jabatan: Maklumat>> Orang Yang Kompten>>Operator Kren / Pengendali Perancah
b) Laman Web MyKKP: Panduan >> lain-Lain>>Operator Kren>> Pengendali Perancah

Harap Maklum.

previous arrow
next arrow

Good Hoist Drum Motor Fell On The Worker’s Head


Photo: View at lower ground floor which was covered with blood

The incident involved a machine that has been fabricated and installed in a furniture store. It has the characteristic of a hoisting machine [which can be classified as Goods Hoist] which had resulted in a worker being crushed to death by a drum motor which had fallen down. The victim body was discovered at the lower ground of the building and covered with blood with his head smashed.

From the initial investigation, it was found that the incident was due to hook installation [hook] on the cross beam structure at the top level which is used to hang the drum motor. The hook cannot withstand the load, which was being lifted. The victim was believed to have started work after the holiday. He is likely to have not received any safety training on use of the machinery, which was newly fitted in that furniture store, and it is not yet completely installed and tested properly.

The machinery installed was for moving goods from lower ground floor to top floor or vice versa. Installation and use of machinery should obtain prior approval from the Department of Safety and Health.

Followings are some of the safety precautions:

  1. Providing a safe operating procedure for workers who will be operating the machinery;
  2. Carry out risk assessment on hazards that may arise from the machinery or its operation;
  3. Load capacity that can be accommodated by the machinery should be known and communicated to the operator who operates the machine so that it will not be operated beyond safe working load limit;
  4. Information, instruction guidance and training as well as effective supervision from time to time to be given to the operator who operates this machine;
  5. Employers must ensure the safety of its employees who carry out their tasks using such machinery in the work area;
  6. The structural integrity of any installed machinery must be tested before it is used;
  7. Design and installation drawing for this type of machinery must have the approval from the professional engineer[PE] for submission to the department; and
  8. Certificate of fitness must be obtained from the regional office before the machinery is used.

Print Email

Slide 1

OSH Information Centre

safety alert   statistics    prosecution    fatal acc case

prosecution    HIGIEN    pet safety    construction en

kimia en    SME    SME    SME

.

Slide 1

OSH Information Centre

safety alert   statistics    prosecution    fatal acc case

prosecution    HIGIEN    pet safety    construction en

kimia en    SME    SME    SME

.

Video OSHMP25

Highlights Of Events

AKP
Libat Urus
Ceramah KKP
Libat Urus
ASEAN OSHNET DI QUEZON CITY, THE PHILIPPINES
KEJARI 4.0 DI BANGI AVENUE CONVENTION CENTRE
LAWATAN KE TAPAK MERDEKA 118
PROGRAM GOTONG ROYONG KUDAH (KUTIP SAMPAH SAMBIL RIADAH)
previous arrow
next arrow